Stage 1: Review the drawings (life safety respective)
- 3 Office building - completed - Site plan - All remaining buildings. Stage 2: Preparing fire safety strategy - Fire strategy report for 3 office buildings - completed - Fire strategy report for all remaining buildings Stage 3: Design criteria of fire safety systems. ✓ Design criteria for all fire safety systems, include: - Firefighting systems (Buildings and site plan) - Fire alarm systems - Emergency light system - Exit sigs - Life safety - Site plan – fire truck roads. Stage 4: Design fire safety systems ✓ Depending on the approval of design criteria, the design will be for: - Firefighting systems (Buildings and site plan) - Fire alarm systems - Emergency light system - Exit sigs - Life safety - Site plan – fire truck roads. Stage 5: Approval ✓ Option 1: from the CD consultant ✓ Option 2: from the office and Civil defense (and/or discussion with CD for major issues (like concealed space systems) Stage 6: Find handover to CD - After complete the project, consultant will test the site for inspection and testing and release certificate and report to submit to CD.