Professional Documents
Culture Documents
Revisi Skema Petak Irigasi A4
Revisi Skema Petak Irigasi A4
2
A = 184,53
R.B.K. 1
Q = 0,354 m3/s
A = 743,95
B.B.K. 1 Q = 1,522 m3/s B.B.K. 2
S.P. Bambu Kuning
Q = 0,151 m3/s
Q = 1,049 m3/s
A = 87,15
A = 558,06
R.G. 1
R.M. 1
S.S. Meranti
B.M. 1 B.G. 1
M. 1 Ka M. 1 Ki G. 1 Ka G. 1 Ki
63,93 79,55 113,71 141,49
Q = 0,742 m3/s 38,15 47,47 49,0060,97
S.S. Glugu
A = 380,42
S. BAHARI
R.M. 2
B.M. 2 S. OYO
M. 2 Ka M. 2 Ki
55,66 69,26 94,34 117,39
Q = 0,483 m3/s
A = 230,42
R.M. 3
S. OPAK B.M. 3
M. 3 Ka M. 3 Ki
101,13125,84 129,29 160,88
Kelompok 10:
1. Nurwirajaya (20510334026)
2. Zakiyyah Salmaa Linadi (20510334033)
3. Syaiful Anwar (20510334035)
4. Ahmad Qulyubi (20510334040)