NAMA PROYEK:

NAME OF PROJECT:
PROYEK PEMBANGUNAN
PERPIPAAN AIR LIMBAH KOTA
MAKASSAR ZONA BARAT LAUT
Upper Arriving Pit MH 10015A (PAKET C-1)
2467

400
CATATAN :
Ground Level
NOTE :
2067

RC RING
900
2000

2067
PEMILIK PROYEK :
PROJECT OWNER :
HB 250 (-2)
3200 Elevasi 0
67
0
KEMENTERIAN PEKERJAAN UMUM

RC RING
800 1600 800

5000
DIREKTORAT JENDERAL CIPTA KARYA

2500
BALAI PRASARANA PERMUKIMAN WILAYAH
SULAWESI SELATAN
SATUAN KERJA PELAKSANAAN PERMUKIMAN WILAYAH II
PROVINSI SULAWESI SELATAN

Pasir halus DI SETUJUI :

2000
APPROVED :
coklat
Kepdatan sedang

Dept To Invert 7740


1000

DALAM GALIAN 8640


SETIA DINNOOR, S.T.,M.Eng
NIP. 198604212010121003
HB 250 (-4)
-1933 KONSULTAN:
CONSULTANT :
PROJECT IMPLEMENTATION SUPPORT CONSULTANT (PISC)

sheet pile 10958


5673
4000

2000

RC RING
SMEC International Pty Ltd in join venture with Stantec Australia Pty Ltd with

2000
PT. Ifratama Yakti, PT. SMEC Denka Indonesia,

2500
PT. Amurwa International PT. Widyagraha Asana As Sub Consultants

DIPERIKSA:
CHECKED:

HB 250 (-6)
-3933
DAVID KETTLEWELL B.Eng C.Eng MICE PMP
TEAM LEADER
1000

KONTRAKTOR :
CONTRACTOR:

Base Manhole
2090

H= 1650
PT. ADHI KARYA (PERSERO) Tbk.
DIAJUKAN :
Invert level SUBMITTED:
Upper Arriving Pit MH 10015A -5673

265
1 HB 300 (-8)
Base Manhole
-5938
Skala 1 : 50 -6023
Gravel IRWAN, S.T.,M.T
-6323 Project Manager
Kedalaman Galian
SCAN & DATE
DRAFTER : KHAIDIR, S.Ars
-6573
Pasir halus PEM : CAHYA ESTHER P.W.,S.T
SCAN & DATE

abu abu lepas


SHOP DRAWING

1918
NO : TANGGAL : REVISI :

Lower Sheet Pile 17 JUDUL GAMBAR :


-8491 DRAWING TITTLE:

Exitring MH. 10248


Detail exitring
isometri extiring
Potongan 01
2 SKALA :
Skala 1 : 50 SCALE:
1 :50

NOMOR GAMBAR :
DRAWING NUMBER:
AK.06/S/27.10-0