In consonance with the making of a
world class airport with a world class
vision, the challenge was to provide
«@ highly advanced fire safety system
for passengers. The new terminal
has been equipped with one of the
most advanced Fire Detection &
Protection (FDP) system to protect the
lives of occupants & the operational
functions of building. The installation
of which has evolved os the biggest
of such Fire Fighting and Detection
system in any building in Indic.
Unique types of modern and
advanced system with innovative
techniques are installed in 7-3
building like VESDA system (Very
Early Smoke Detection Apparatus)
which is being extensively used for
Fire Detection at higher ceiling levels.
The entire system adheres to NFPA
(National Fire Protection Association)
Codes of US.
The pipes used for the firefighting
system ore prefabricated at o fully
mechanized workshop setup within
the project site conforming to the
Fire pump house
Fire Detection and Protection System
ST TL ee UL
best of Quality ond Sofety standards
Each pipe segment used in the
firefighting system is drawn on shop
drawings for fabrication and pointed
in workshop prior to installation ot
the site
1.10 lakh sprinklers and 40000
detectors ore connected in groups
‘ond loops with the help of 355
km pipe, 600 km cable and 679
hydrants, HVAC, ACS, PAVA, VHT
‘and BHS systems are interfaced with
the FOP System,
Inthe 79 IT rooms across the airport
terminal, GAS suppression system is
installed using eco-friendly NOVEC
-1230 gos having zero impact on
‘ozone layer.
Types of FDP systems:
Following are the types of FDP
systems installed at various locations
in T-3, to meet the fire protection
demand of specific areas:
1. Fire hydrant system internal &
external)
eatin niet ace
‘Adherence to NFPA code.
VESDA for high level ceilings.
Gas Suppression system for IT
rooms.
Use of Prefabricated pipes ot
workshop installed at site
1.10 Lakh sprinkler, detectors,
355 km of piping.
Integration of firefighting system
with HVAC, ACS, PAVA, VHT &
BHS:
Automatic sprinkler system
Medium velocity spray system
4. Inteligent addressable fire
clorm system
5. Clean agent gas suppression
system
6. Water curtain system
Fire extinguisher
8 Very carly smoke
‘epparatus (VESDA)
detector
Prefabrication
Putting up @ fabrication workshop at
T.3 projects the mostimportant feature
which enabled LBT to fabricate, supply,
erect and install 350 km of pipe having
‘almost 7 lakh pipe joints. Each GI pipe
segment having unique identification
number os shown in positions drawing
of the respective fre zone were drawn
(on paper to make shop drawings of the
pipe. After approval, these drawings
were sent fo workshop for fabrication.
The pipes were threaded or grooved
ds shown in the shop drawing. The
workshop had an installed capacity to
fabricate 2 km per doy of pipes having
eight threading machines imported
from Germany and USA, as well os
four grooving machines and three
1s: EmelPipe Fabication Workshop that helped manufacture 350 km of pipes
pipe saws installed on shop floor. Out
of the total 4000 squore yard area of
shop about one third was dedicated
to welding and painting works, where
3G welders and 6G welders fabricated
the special purpose fitings and allied
works.
Fire Alarm System
The state-of-the-art fire alarm system
hes many edvanced technological
features. The entire system spreads
outtothe extent of 5.5 lakh sq.m ores.
To meet the specific requirements
ot different areas, almost 40,000
detectors of various types
looped in along with 149 fire alarm
conirol panels and network repeater
panels. Mimic panels installed
at 17 strategic locations enabled
the fire commander fo control the
extinguishing operation by graphical
representation from remote location.
Dedicated fire command center and
emergency command center been
have also been provided in the system
which gives the entire system one
extra mileage in case of failure and
redundancy. The system is integrated
for automatic operation with other
systems like HVAC, automatic control
Peo = a
doors, lifts, travelators and escalators,
baggage handing system, public
fennouncement system, electrical
system and building management
system. The detection of fire hazards
ct higher elevations ore being done
by VESDA system.
Fire Fighting System
The fire fighting system is grouped
into following sections which
altogether consumes 355 km Gl,
MS and DI pipes.
1. Internal Hydrant System: A
{otal of 544 hydrants ore installed
inthe entire building which covers
all corners of the floor.
2. Sprinklers System: A total
of 1.10 lakh sprinklers of
various types are installed. This
includes quick response upright,
pendant, concealed, window,
sidewall and medium velocity
nozzles and covers the floor and
false ceiling areas.
3. External Hydrant System: This
system protects the building from
outside having 135 hydrant
connected with 7.60 km long
ring fire main.
4. Gas Suppression System:
All communication rooms (79
Nos.) are protected with NOVEC
- 1230 low pressure and
environment friendly automatic
{g0s system
5. MVspray System: Thissysiemis
provided in two important areas
‘of PTB one is sub-basement
double height area {j block) and
Arrival area in baggage hall
‘and medium velocity nozzles
covers the floor.
6. Extinguishers: Six types of
5400 extinguishers are installed
for first level of protection at T-3
building
Fire Pump House
The fire pumps including electrical
controllers of sprinkler and hydrant
sysiem have been imported from
Canada having discharge of 1000
GPM ond 1250 GPM respectively.
Total 6 Nos. of pumps are installed
Aeleciricpump (1 sprinkler, 1 hydrant
& 2 jockey pumps), and 2 diesel
engine pumps. Total tank capacity of
underground fire water pump house
is 760 cum. Tanks are Separatedinto two equal compartments, 380
cu.m. of each which is dedicated for
firefighting purpose.
Planning & Construction
The FDP system of Passenger Terminal
7.3 was installed in a short span of
time. Various method statements with
more than 500 drawings have been
used to erect the system. FDP execution
feam of DIAL project was consisting of
23 engineers al the peak time who
worked meticulously as a team to get
the work done from subcontractors.
The fotal quantum of work was carried
out in 24 months time by deploying
fon an average 850 workmen with o
peak of 1600 manpower. Minimax,
the subcontractor of this package
deployed? 1 expatpersonnel forproject
management including German ond
‘American project managers. The work
was done in interface with other ceiling
suspended services such as HVAC,
Electrical, IT and others systems. The
drawings were made clash free with
3D modeling
Testing & Commissioning
The biggest challenge of the project
wos faced during Testing and
Commissioning stage. The finish
works like false ceiling, wall cladding
cond carpeting were done along with
T&C activities of FDP system which
posed a challenge to energize the
water system without damaging
these finishes of the building. Five air
compressors of high CFM were used
to pretest the leakages in piping
system before filing water inside the
pipes ot pressure. The air testing of
sprinkle and hydrant piping ot 3.0
bar avoided the potential damage
to finishes and other services, by
arresting such possibilities before the
water energization of the system.
Fire olarm testing and commissioning
was done by completing the network
‘of 42 FACP panels and controlling the
system from Fire Command Centre.
All types of necessary testing required
for fire alarm system like loop testing,
continuity testing ond trouble shooting
is now in final stage. Gos based fire
suppression testing ond commissioning
is being done by interfacing with
fire alarm system, aspirating smoke
detection sysiem (Vesdo) ond also
necessary testing required for Gas
based fire suppression system like,
pneumatic test for piping, leakage
test for cylinders and fan door tes.
This system has been provided in all
‘communication rooms.
Five steps are followed in the testing
‘and commissioning process they are:
Pre-commissioning, Commissioning,
Performance, Integration and System
integration procedure. Apart from
this, real checking is also done in all
(Fee ramneren)
Schematic of fre alarm sytem
levels and the passenger movement
areas. Testing and commissioning
was done by ensuring proper safety.
Integration
Integration of Fire Alarm system is
the most critical part of the testing
and commissioning octvily. The Fire
Alarm system shall be interfaced
with Fire fighting system, other
Electromechanicol and IT systems of
building fo meet the requirements of
fire strategy and evacuation plans.
All important devices of Fire fighting
system like valves, flow switches,
pumps, flow meters are integrated
with Fire alarm system though monitor
modules. In case of operation of
these devices the signal will be sentio
FCC via local panel through network
to monitor the some.
Nevertheless, all_—_important
electromechanical and IT services
like HVAC, Access Doors, Public
announcement system, Baggage
handling system, Vertical &
Horizontal Transfer system etc. ore
integrated with Fire olarm system
through control relay modules.
The complete building hos been
divided into 160 fire zones as per
fire strategy. A comprehensive
cause ond effect matrix has been
developed 10 identify the operational
mode of electromechanical and IT
systems folling in the respective fire
zones in case of fre alarm activation.
The fire control relay modules give
the signol to the devices of various
systems like Air Handling Units,
Fire dampers, Fans, Fire shutters
of BHS,
Elevators, Access Controlled doors,
Public Announcement System etc to
eutomatically operate the same os
per the couse ond effect matrix.
Trovelators, Escalators,
Suresh Kumar Sharma
Package Manager. FDP