Default Project..................................................SAFI-3
Use scheduling options from......................................SAFI-3
Projects:
SAFI-3...........................................................Projet
de dessalement modulaire - SAFI- REFERENCE - 23-06-22
Scheduling/Leveling Settings:
-----------------------------
General
-------
Scheduling ......................................................Yes
Leveling ........................................................No
Ignore relationships to and from other projects .................No
Make open-ended activities critical .............................No
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................No
Recalculate assignment costs after scheduling ...................No
When scheduling progressed activities use .......................Retained
Logic
Calculate start-to-start lag from ...............................Early Start
Define critical activities as Total Float less than or equal to .0
Compute Total Float As ..........................................Finish Float
Calculate float based on finish date of .........................Each project
Calendar for scheduling Relationship Lag ........................Predecessor
Activity Calendar
Advanced
--------
Calculate multiple float paths...................................No
Statistics:
-----------
# Projects.......................................................1
# Activities.....................................................127
# Not Started....................................................127
# In Progress....................................................0
# Completed......................................................0
# Relationships..................................................191
# Activities with Constraint.....................................2
Project: SAFI-3 Activity: C1195 Béton de Structure du 2/3 du
Radier
Project: SAFI-3 Activity: R1000 Terrassements
Errors:
-------
Warnings:
---------
Activities without predecessors..................................8
Project: SAFI-3 Activity: A1050 Revetement interne du
Réservoir 500m3
Project: SAFI-3 Activity: MS0000 Mail d'adjudication
Project: SAFI-3 Activity: MS1440 Conception / Définition
des equipements des Points Hauts et Points Bas
Project: SAFI-3 Activity: MS1450 Validation de la demande
d'Agrément des Vannes
Project: SAFI-3 Activity: P1150 Equipements pour le
raccordement
Project: SAFI-3 Activity: TE200 Terrassement (1ere livraison
de conduites)
Project: SAFI-3 Activity: TE210 Terrassement (2eme livraison
de conduites)
Project: SAFI-3 Activity: TE270 Terrassement (3eme livraison
de conduites)
Out-of-sequence activities.......................................0
Scheduling/Leveling Results:
----------------------------
# Projects Scheduled/Leveled.....................................1
# Activities Scheduled/Leveled...................................127
# Relationships with other projects..............................0
Data Date........................................................28-Apr-22
Earliest Early Start Date........................................28-Apr-22
Latest Early Finish Date.........................................27-Nov-22
Exceptions:
-----------
Critical Activities..............................................6
Project: SAFI-3 Activity: C1170 Montage des équipements unité
3
Project: SAFI-3 Activity: C2060 Fin de montage d'unité 3
Project: SAFI-3 Activity: MS0000 Mail d'adjudication
Project: SAFI-3 Activity: P1070 Livraison des équipements
unité 3 par JESA
Project: SAFI-3 Activity: RP001 Réception provisoire
Project: SAFI-3 Activity: RP002 Repliement de matériel