1 A ______ is a document which describes the objective, scope , approach and focus of a software testing

effort a. Test Plan b. Test Case c. Test Strategy d. Test Script Hide Answer Answer : Test Plan 2
Advantages of Automated testing tools are: a. Economy b. Repeatability & Scalability c. Robustness d.
All of the above Show Answer 3 Table review process is followed mostly for reviewing documents. What
is the other name of Table Review Process? a. PEST Analysis b. SWOT Analysis c. Fagan’s Review
Process d. Brainstorming Show Answer 4 The highlights of Acceptance testing are : a. Checks the system
against the requirement specification b. Testing done by customer and not the developer c. Focuses on
whether the system delivers what was requested and is informed by the business d. All of the above Show
Answer 5 What is the correct definition of a Test Script? a. It is a logical group of test cases which when
taken together test a particular function or unit of the system b. It is a document that defines the input,
action and expected output to determine if a certain feature of an application is working correctly c. It is a
document that describes the sequence of steps to execute a test case. d. None of the above Show Answer
Also Read : How to remove viruses from an Android phone 6 Which of the following are highlights of
system testing ? a. Testing is based on a very structured approach for generating test cases b. Testing is
generally done by an independent test team, and not by the developer c. Aims at testing a host of variables
like basic requirements, implied requirements, performance d. All of the above Show Answer 7 Which of
the following are objectives of a review? a. Verifying that specifications are met b. Collecting data for
improvement c. Identifying deviations from standards and specifications d. All of the above Show
Answer 8 _______ is done with the intent of determining if the product will install on a variety of
platforms. a. Product testing b. Installation testing c. Load testing d. Compatibility testing Show Answer 9
________ covers both Performance testing and Stress testing. a. Load testing b. Performance testing c.
Build testing d. All of the above Show Answer 10 __________ refers to ‘Are we building the product
RIGHT?’ a. Review b. Validation c. Testing d. Verification Show Answer 11 ___________ stage ensures
that review comments have been incorporated during rework a. Review b. Causal Analysis c. Rework d.
Follow up Show Answer 12 Defects found in reviews are classified in 2 ways. The 2 ways are : a.
Priority, Source b. Severity, Type c. Major, Minor d. Cosmetic, Logical Show Answer 13 Errors are
classified based on a. Type b. Severity c. Both (a) and (b) d. None of the above Show Answer 14 Focus of
the integration testing is to verify a. The features specified in the design has been implemented b.
Functionality of the system as a whole c. The inter-module interactions thoroughly d. All of the above
Show Answer 15 If the cost of fixing a defect in the requirements phase is 1, what is the relative cost of
fixing a defect in the Testing Phase a. 15-40 b. 10 c. >100 d. 10 to 15 Show Answer 16 Importance of
Review are : a. Detect defects early b. Emphasize quality throughout development c. Both (a) and (b) d.
None of the above Show Answer 17 In a review process, who moderates the review sessions? a. Author b.
Reviewer c. Review Leader d. Recorder Show Answer 18 In a table review, who records the defects and
classifies errors? a. Review Leader b. Reader c. Author d. Recorder Show Answer 19 In which of the
following review stages, tasks and specific focus areas are assigned to the team a. Planning b. Preparation
c. Kick-off d. None of the above Show Answer 20 Mike Fagan of IBM published a paper in 1976,
describing a method called __________ which formalised the software review process. a. Peer review b.
Table review c. Online review d. Pair review Show Answer Also Read : Block ads on your Android
phone with 3 simple methods 21 Norms for review rate are defined for which of the following reasons: a.
To assign review related tasks to the team b. Review Productivity c. Exit Criteria of a Review Process. d.
Measure Review effectiveness Show Answer 22 Preparation of a ________ is very important, before
conducting Unit testing. a. System Test Plan b. Unit Test Plan c. Unit Test Case d. All of the above Show
Answer 23 Review is a formal evaluation technique in which software requirements, design and code is
examined in detail by groups of persons other than the author to detect faults,violations of development
standards and other problems. This definition of reviews is by a. IEEE b. Roger Pressmen c. SEI d. None
of the Above Show Answer 24 Testing is the process of __________ a. Verifying that specifications are
met b. Evaluating a system to verify that it satisfies the specified requirements c. Both (a) and (b) d.
Executing a program to find errors Show Answer 25 The basic building block of any activity in any phase
of the SDLC which forms the core of Wipro’s Reviews and Testing Process is called the : a. Verification
and Validation Techniques b. ETVX Model c. Peer Review d. All of the above Show Answer 26 The
different types of flow/coverage based testing are: a. Statement coverage b. Full Path coverage c.
Decision coverage d. All of the above Show Answer 27 The inputs to planning stage in a review process
are a. Problem definition b. List of roles c. Review process map d. None of the above Show Answer 28
The objectives of Regression testing are : a. Ensures performance of two or more modules b. It
determines if bug fixes have been successful and they have not created any new problems c. Ensures that
no degradation of baseline functionality has occurred d. Both (b) and (c) Show Answer 29 The purpose of
_________ is to assure that the product or product components fulfill their intended use when placed in
their intented environment a. User Acceptance Testing b. Validation c. Verification d. Product Testing
Show Answer 30 The purpose of _________ is to assure that the selected product meet their specified
requirements a. Acceptance Testing b. Validation c. Verification d. Feature testing Show Answer 31 The
purpose of Functional testing are: a. Finding defects b. Verifying that the module performs its intended
functions as stated in the specification c. Establishing confidence that a program does what it is supposed
to do d. All of the above Show Answer 32 The role of a Review Team Leader is a. Provides an overview
of the product to be reviewed during the kick off meeting b. Classify defects c. Provide clarification d. To
moderate the review meeting Show Answer 33 The various kinds of classifications of testing are
__________ a. Type – based classification b. System – based classification c. Both (a) and (b) d. Level –
based classification Show Answer 34 There are seven steps in a review process. Which of the following
step helps in defect prevention? a. Review Preparation b. Causal Analysis c. Conducting the Review d.
Closing the review comments Show Answer 35 Tools commonly used for causal analysis are a. Root
cause analysis b. Pareto Analysis c. Both (a) and (b) d. None of the above Show Answer Also Read : Best
Voice changing apps during Android and iOS calling 36 Verification and Validation utilizes ________ to
analyse and check system representations. a. Validation Techniques b. Testing Techniques c. Review
Techniques d. All of the above Show Answer 37 Which of the following are broad types of efficiency
techniques in testing : a. Domain Based testing b. System Based testing c. Both (a) and (b) d. Flow/
Coverage – Based testing Show Answer 38 Which of the following are the commonly accepted levels of
testing in the Software Development Life Cycle ? a. System testing b. Unit or Component testing c.
Integration testing d. All of the above Show Answer 39 Which of the following checklists are related to
reviews in veloci-Q? a. Test plan/ Test Case Development Review b. Transition Review c. Code Review
d. All of the above Show Answer 40 Which of the following could be a criteria to stop review a.
Reviewers decide that there is no need for another review b. Too many errors are found in the review c.
Defects are rectified and verified by review team leader d. All of the above Show Answer 41 Which of
the following criteria serve as basis for taking decision to stop testing : a. Stop testing when all test cases
execute without producing any error b. Stop testing when the specified test coverage is completed without
finding errors c. Stop testing when it becomes unproductive d. All of the above Show Answer 42 Which
of the following defect type classification is used for document Reviews? a. Performance b. Functionality
c. Error Handling d. Lack of Clarity Show Answer 43 Which of the following procedures are related to
reviews in veloci-Q? a. Proposal/Contract review b. Review c. Release Review d. All of the above Show
Answer 44 Which of the following review types is used for building code or documents by discussing
with the members of the development team and improving the work item . a. Table Review b. Peer
Review c. Inspection d. Walk throughs Show Answer 45 Which of the following reviews have well
defined roles a. Table review b. Walkthrough c. Peer review d. All of the above Show Answer 46 Which
of the following rules apply for real-time system testing : a. Use tests to simulate hardware faults b. Use
hardware simulation to add stress to the software design c. Design ways to simulate modules missing in
the development system d. All of the above Show Answer 47 Which of the following statement is
INCORRECT? a. The potential of testing to improve quality is unlimited. b. Properly run unit testing is
potentially capable of removing 70% of the defects c. Testing cannot remove all defects which are
undetected in earlier stages d. All of the above Show Answer 48 Which of the following templates are
related to reviews in veloci-Q? a. Review b. Defect Prevention Report c. Release Review Summary d. All
of the above Show Answer 49 Why is multiple rounds of system testing recommended? a. Accommodate
bug fixes and eliminate maximum defects b. Shortage of resources to complete testing in one round c. Set
of test cases can be executed in each round. d. For testing basic requirement, implied requirements ,
performance measures in various rounds Show Answer 50 _____ testing focus on how the components
communicate with each other as specified in the system Design a. System b. Integration c. User d.
Component Show Answer Also Read : How to find new people on WhatsApp 51 ______ are conducted
to find and eliminate errors/defects in the early stages of product development. a. Reviews and Testing b.
Reviews c. Validation d. All of the above Show Answer 52 ______ examines the various combinations of
Boolean operands within a condition. a. Condition coverage b. Condition operand coverage c. Condition
operator coverage d. All of the above Show Answer 53 ______ provides a measure of the conditions
which could ensure that a branch is executed. a. Decision coverage b. Condition operand coverage c. Both
(a) and (b) d. Condition coverage Show Answer 54 _______ is used to determine whether other system
software components such as browsers utilities and competing software will conflict with the software
being tested a. Mutation Testing b. Browser Testing c. Compatibility Testing d. Real Time testing Show
Answer 55 ________ can also be called as Black Box testing. a. System testing b. Integration testing c.
Unit or Component testing d. Interface testing Show Answer 56 ________ complexity is a measure of
algorithmic complexity, calculated by counting operators and operands. a. McCabe b. Halstead c.
Combination d. None of the above Show Answer 57 ________ complexity measures the structural
complexity of software by quantifying the number of linearly-independent paths running through a
program module. a. McCabe b. Halstead c. Combination d. None of the above Show Answer
https://www.trenovision.com/2018/08/27/how-to-make-100-in-single-day-through-whatsapp/ 58
________ complexity-based testing measures program length and vocabulary, volume, difficulty, and
effort. a. McCabe b. Halstead c. Combination d. None of the above Show Answer 59 __________ testing
shall be carried out if there are multiple modules in the project. a. Unit b. Build c. Module/ Feature d.
System Show Answer 60 ___________ in a review, helps in defect prevention a. Review Preparation b.
Causal Analysis c. Review Meeting d. None of the above Show Answer 61 ___________ technique can
be used for testing process a. DOE and Pugh Matrix b. QFD and Orthogonal array c. DOE and
Orthogonal array d. DOE and QFD Show Answer 62 _____________ is a way of proving that your
system does what is intended and also meets all requirements. a. Verification b. Validation c. Verification
and Validation d. None of the above Show Answer https://www.trenovision.com/2018/08/27/how-to-
make-100-in-single-day-through-whatsapp/ 63 During System Testing of an application, you would want
to test the peak volumes of information that can be handled by the application. What kind of testing
would you do? a. Stress b. Volume c. Performance d. Robustness Show Answer 64 Importance of Testing
are : a. To ensure that the product is usable b. Early identification of errors that helps in prevention of a
breakdown at a later stage. c. To ensure that customer’s objectives are met d. All of the above Show
Answer 65 In a software development environment ____________ is confirmation that the output of a
particular phase of development meets all of the input requirements for that phase. a. Software Validation
b. Software Testing c. Software Verification d. Reviews and Testing Show Answer Also Read : The best
Android launcher apps in 2019 66 JTest, Jprobe, Purify are some of the __________ used in projects. a.
Verification tools b. Validation tools c. Testing tools d. All of the above Show Answer 67 The
___________ based testing is a systematic, statistical way of testing the software. a. User interface b.
Orthogonal Array c. Functionality d. None of the above Show Answer 68 The outputs of review meeting
are a. Defect Log b. Rework Task list c. Review meeting minutes d. All of the above Show Answer 69
Which of the following are different types of reviews? a. Walkthrough b. Inspections c. Both (a) and (b)
d. None of the above Show Answer 70 Which of the following are the highlights of unit testing ? a.
Involves testing of basic building blocks of the system b. Testing is generally done by an independent test
team, and not by developer c. Testing to verify the inter-module interactions thoroughly d. All of the
above Show Answer 71 Which of the following is the most important criteria to start review of a work
item. a. Sign off by the customer b. Approved by the Project Manager c. Check whether estimations of
review is available d. Check for completeness of the work item to be reviewed Show Answer 72 Which of
the following testing is recommended in order to keep company data and resources secure from mistaken
or accidental users, hackers, and other malevolent attackers. a. Security testing b. Safety testing c. Both
(a) and (b) d. Mutation testing Show Answer 73 Which one of the following is an important output of a
kick off meeting a. Roles and Responsibilities of Review team Members b. Individual Review notes c.
List of Reviewers d. List of Roles of Reviewers Show Answer 74 ______ demonstrates satisfactory
suitability for use in the intended operating environment. a. Verification b. Validation c. Review d.
Inspection Show Answer 75 _______ is done to validate the entire product. a. System testing b.
Acceptance testing c. Regression testing d. Integration testing Show Answer Also Read : 5 Apps from
Google that you should try 76 ________ helps analyze the required efforts for validating the acceptability
of a software product. a. Test Plan b. Test Script c. Test Case d. All of the above Show Answer
https://www.trenovision.com/2018/08/27/how-to-make-100-in-single-day-through-whatsapp/ 77
________ is a process of executing a program with the intent of finding errors. a. Review b. Peer review
c. Verification d. Testing Show Answer 78 ________ typically involves actual testing. a. Verification b.
Validation c. System Checking d. Verification and Validation Show Answer 79 __________ are
techniques of system checking and analysis. a. Review and Testing b. Review and Analysing c. Review,
Testing and analysing d. None of the above Show Answer 80 __________ includes all of the verification
and testing activities conducted throughout the software lifecycle. a. Software Testing b. Software
Validation c. Software Verification d. Reviews and Testing Show Answer 81 __________ is a formal
evaluation technique in which software requirements, design, or code are examined to detect faults. a.
Review b. System Testing c. Validation d. All of the above Show Answer 82 A ____ provides a
framework for setting the input parameters, executing the unit and reading the output parameter. a. Test
bed b. Test driver c. Test stub d. All of the above Show Answer 83 Test audit observations should be
captured in _________ a. Test Audit Report b. Test Report c. Test Observation Report d. All of the above
Show Answer 84 The outputs of planning stage in a review process are a. Baseline Work Product b.
Review Plan c. List of roles for review d. All of the above Show Answer 85 Which of the following
reviews are recommended for large/critical work items a. Peer review b. Table review c. Walkthrough d.
All of the above Show Answer 86 Wipro is CMMI Level 5 certified organization. Verification and
Validation Process Areas lies at a. CMMI Level 3 b. CMMI Level 5 c. CMMI Level 2 d. CMMI Level 4
Show Answer 87 ________ can also be called White box testing. a. Integration testing b. Unit or
Component testing c. Interface testing d. System testing Show Answer 88 A visual examination of a
software product to detect and identify software anomalies or defects including errors and deviations from
standards is a. Walkthrough b. Testing c. Inspection d. None of the above Show Answer 89 An informal
meeting for evaluation or information purpose is a a. Walkthrough b. Testing c. Inspection d. None of the
above Show Answer 90 As the project moves from requirements stage to completion stage, the cost of
fixing defects . a. Remains the same b. Decreases c. Is unaffected by reviews d. Increases Show Answer
91 Challenges of Review and Testing are: a. Lack of domain expertise b. Monotony of the job and coping
with requirement changes c. Both (a) and (b) d. None of the above Show Answer 92 A ________ is an
imitation of a unit, used in place of the real unit to facilitate testing. a. Test driver b. Test build c. Test bed
d. Test stub Show Answer 93 A group of test scripts which when taken together test all functions of an
entire system is called the __________. a. Test Suite b. Test Bed c. Test Product d. All of the above Show
Answer 94 In a table review, who paraphrases the code/document? a. Reader b. Author c. Review Leader
d. Recorder Show Answer 95 Software bugs occur due to ___________ reasons. a. Software complexity
and inadequate use of development tools b. Poorly documented code c. Poor understanding of
requirements d. All of the above Show Answer 96 Sometimes a need may arise for an external review of
the software product. Which of the following needs will prompt you to go for an ERT? a. Domain
Content b. Technical Content c. Cosmetic Content d. All of the above Show Answer 97 The challenges in
Testing are: a. Lack of testing tools b. Often development effort increases and there is very little time for
testing c. Generation of adequate test cases d. All of the above Show Answer 98 The different kinds of
domain-based testing techniques are : a. Decision Table b. Equivalence Partitioning c. Boundary Value
Analysis d. All of the above Show Answer 99 Which of the following are Code Complexity measures
used as basis for testing : a. McCabe measures b. Combination measures c. Halstead measures d. All of
the above Show Answer Also Read : Money making apps online on Android or iPhone 100 Which of the
following is NOT a document defect type a. Cosmetic b. Violation of standards c. Lack of clarity d.
Performance Show Answer 101 ________ determines if a new software version is performing well
enough to accept it for a major testing effort. a. Mutation testing b. Load testing c. Smoke testing d.
Release testing Show Answer 102 ________ involves checking that each feature specified in the
component design has been implemented in the component. a. Interface testing b. Integration testing c.
Unit testing d. System testing Show Answer 103 ________ involves testing two or more modules
together with the intent of finding defects between the modules. a. Integration or interface testing b.
Feature testing c. Unit testing d. System testing Show Answer 104 ________ is a method for determining
if a set of test data or test cases is useful. a. Automated testing b. Mutation testing c. Functional testing d.
Module testing Show Answer 105 ________ is done with the intent of determining how quickly a product
handles a variety of events, actions or functions. a. Performance testing b. System testing c. Both (a) and
(b) d. Product testing Show Answer 106 ________ is the process of evaluating a system to verify that it
satisfies specified requirements. a. Verification b. Testing c. Reviews d. Inspection Show Answer 107
________ is used to test operation of the software and input-output data to ensure that the software is
performing well. a. Software Testing b. Review Techniques c. Verification d. All of the above Show
Answer 108 ________ techniques examine input and output of test data and derive test cases based on an
analysis of the input and output domains. a. Flow/ Coverage – Based testing b. System Based testing c.
Domain-Based testing d. None of the above Show Answer 109 ________ typically involves reviews and
meetings to evaluate documents, plans, code, requirements and specifications. a. Testing b. Validation c.
Project Planning d. Verification Show Answer 110 _________ can be done with checklists, issues lists,
walkthroughs, and inspection meetings. a. Validation b. Verification c. Inspection d. Testing Show
Answer 111 _________ determines how well a product performs when a load is placed on the system
resources that nears and then exceeds the system capacity. a. Compatibility Testing b. Load testing c.
Capacity testing d. Stress testing Show Answer 112 _________ is a document that defines the input,
action and the corresponding expected output, to determine if a certain feature of an application is
working correctly. a. Test Script b. Test Bed c. Test Case d. Test Plan Show Answer 113 _________
refers to ‘Are we building the RIGHT product?’ a. Verification b. Testing c. Review d. Validation Show
Answer 114 __________ implies testing the system with the intent of confirming the readiness of the
product and customer acceptance of the product. a. Acceptance Testing b. Integration testing c. Load
testing d. System testing Show Answer 115 __________ is used to test system data and examine system
output. a. Software Review b. Software Inspection c. Software Analysing d. Software Testing Show
Answer 116 __________ refers to testing the features/ navigation/ expected expectations, when more than
one users from different machines operate on same Objects. a. Concurrent testing b. Functional testing c.
Module testing d. All of the above Show Answer