Construction project: Oberoi Mumbai Construction member: Front face_200 mm Project number: Date: 13.05.2011
1. Input information: Anchor channel: Bolt: Anchorage depth: Stand-off installation Concrete:
JTA W 40/22-hdg-0300-2A CE, l = 300 mm, 2 Anchor JC M10 x 40, hdg 4.6, On stock hef = 79 mm Distances = 0 mm (No spacing), Attaching part thickness = 10 mm Cube 40 MPa, Cracked concrete, fck,cube = 40 N/mm, d = 500 mm, c = 25 mm, cs = 25 mm, c1,1 = 100 mm, c1,2 = 100 mm, c2,1-x Not available, c2,2-x Not available x = channel overhang = 25 mm Concrete with normal reinforcement Not available Not available
Page 1 of 5
Construction project: Oberoi Mumbai Construction member: Front face_200 mm Project number: Date: 13.05.2011
Loads Load point 1 2 25,00 175,00 8,15 8,15 3,38 3,38 (*)
Note: The specified load positions correspond to the critical load positions (-50 mm) within the displacement range x = 50 mm. Pair- and continuous loads will be shifted on the channel with constant load spacings. (*) load point 1 is relevant concerning the calculation.
2. anchor positions and resulting anchor loads (CEN/TS 1992-4, chapter 5) Anchor 1 2 25,00 275,00 10,07 6,23 4,18 2,58 (*)
3. Tension (CEN/TS 1992-4, chapter 6.2) 3.1 Steel failure Proof steel failure anchor (Anchor 1)
OK
OK
OK
Page 2 of 5
Construction project: Oberoi Mumbai Construction member: Front face_200 mm Project number: Date: 13.05.2011
OK
4. Shear (CEN/TS 1992-4, chapter 6.3) 4.1 Steel failure Proof steel failure anchor (Anchor 1)
OK
OK
Page 3 of 5
Construction project: Oberoi Mumbai Construction member: Front face_200 mm Project number: Date: 13.05.2011
OK
OK
Page 4 of 5
Construction project: Oberoi Mumbai Construction member: Front face_200 mm Project number: Date: 13.05.2011
Steel (Anchor 1)
Bolt (Load 1)
Page 5 of 5
C40
40
200
Input
Protrusion u [mm]:
6,75
13,50
50
Wind load excentricity z [mm]:
150
Distance of pressure center v [mm]:
No. of bolts:
40
25
Version: JTA-CEN-0.1.10
Input
Protrusion u [mm]:
6,75
-13,50
50
Wind load excentricity z [mm]:
150
Distance of pressure center v [mm]:
No. of bolts:
40
25
Version: JTA-CEN-0.1.10
Construction project: Oberoi Mumbai Construction member: Top slab_200 mm Project number: Date: 13.05.2011
1. Input information: Anchor channel: Bolt: Anchorage depth: Stand-off installation Concrete:
JTA W 40/22-hdg-0300-2A CE, l = 300 mm, 2 Anchor JC M10 x 40, hdg 4.6, On stock hef = 79 mm Distances = 0 mm (No spacing), Attaching part thickness = 10 mm Cube 40 MPa, Cracked concrete, fck,cube = 40 N/mm, d = 200 mm, c = 25 mm, cs = 25 mm, c1,1 = 150 mm, c1,2 Not available, c2,1-x Not available, c2,2-x Not available x = channel overhang = 25 mm Concrete with normal reinforcement Not available Not available
Page 1 of 5
Construction project: Oberoi Mumbai Construction member: Top slab_200 mm Project number: Date: 13.05.2011
Loads Load point 1 2 25,00 125,00 4,19 4,19 6,75 6,75 (*)
Note: The specified load positions correspond to the critical load positions (-75 mm) within the displacement range x = 75 mm. Pair- and continuous loads will be shifted on the channel with constant load spacings. (*) load point 1 is relevant concerning the calculation.
2. anchor positions and resulting anchor loads (CEN/TS 1992-4, chapter 5) Anchor 1 2 25,00 275,00 5,67 2,71 9,14 4,36 (*)
3. Tension (CEN/TS 1992-4, chapter 6.2) 3.1 Steel failure Proof steel failure anchor (Anchor 1)
OK
OK
OK
Page 2 of 5
Construction project: Oberoi Mumbai Construction member: Top slab_200 mm Project number: Date: 13.05.2011
OK
4. Shear (CEN/TS 1992-4, chapter 6.3) 4.1 Steel failure Proof steel failure anchor (Anchor 1)
OK
OK
Page 3 of 5
Construction project: Oberoi Mumbai Construction member: Top slab_200 mm Project number: Date: 13.05.2011
OK
OK
Page 4 of 5
Construction project: Oberoi Mumbai Construction member: Top slab_200 mm Project number: Date: 13.05.2011
Steel (Anchor 1)
Bolt (Load 1)
Page 5 of 5