Blasting Notification: Total Holes : 100 Method : Electrical

Date : 02 Juli 2022 Steeming : 2.5 Blaster : Ali Wahab PT. MBN
Time : 12:00-13:00 WIT Spacing : 5 meters Mine Engineer : Agum Gumilar
Location : PIT KR 6 Burden : 5 meters Manager Construction : Romy Willar
Contractors : PT. STM Freeface : South Direction
LEGEND
: BLOCKER AREA : UNIT SAFE DISTANCE (300 METERS)

: BLASTING AREA : HUMAN SAFE DISTANCE (500 METERS)

OPTIONAL EVACUATION AREA

MINE PLAN PT. STM SITE WEDA

Jul-22 AGUM GUMILAR


MINE ENGINEER
BLASTING NOTIFICATION