2782

Tanah Asli
± 0,00
19
Paving 88
1406

+ 100 mm
66
3
Paving
4862
3827

663
+ 100 mm 9
65
3
66
500
0
57
31

1262
1100

300
+ 200 mm
50
12

1220
+ 400 mm

400
+ 200 mm

1300
2000
DENAH KANDANG
SKALA 1 : 550
9239
3827
45°
° 45
500 45 °
0
4619
250
9239

3827

45°

45°

Pipa GIP ∅ 2,5"


45 °
° 45
45° 500
0 Plat Besi 8 mm
+ 400 mm
Anchor Besi
Urugan Tanah
± 0,00 mm
Besi 4 ∅ 12 mm
Besi ∅ 8 - 200 mm
Beton f'c 225 MPa
- 700 mm
Besi ∅ 12 - 150 mm
- 900 mm
Lt. Kerja Beton f'c 175 MPa
-1.000 mm
Urugan Pasir
750
DENAH PONDASI TELAPAK 1000
SKALA 1 : 550
DETAIL PONDASI TELAPAK
SKALA 1 : 183,33
9239
3827
250
Pipa GIP ∅ 2,5"
Pas. Batu Bata 1 Batu Camp 1 : 4
+ 400 mm
Pas. Batu Gunung Camp. 1 : 4
+ 200 mm
Urugan Tanah
45° ± 0,00 mm
° 45
500 45 °
0
4619
9239

3827

Pas. Batu Kosong/Aanstaping


45°

45°

- 450 mm
Urugan Pasir
45 - 600 mm
°
° 45
600
45° 500
0 800
DETAIL PONDASI MENERUS 1
SKALA 1 : 183,33
Rabat Beton
Pipa GIP ∅ 2,0"
Pipa GIP ∅ 2,5"
Cansten Pas. Batu Bata 1 Batu
DENAH PONDASI MENERUS Pas. Batu Bata 1 Batu Camp 1 : 4 1320 300 Camp 1 : 4
SKALA 1 : 550 Pas. Batu Gunung Camp. 1 : 4 + 400 mm
750 425
+ 200 mm + 200 mm
+ 100 mm + 100 mm
± 0,00
Pas. Batu Kosong/Aanstaping Pas. Paving Block
Pas. Paving Block
Cansten Pas. Batu Bata 1 Batu
Camp 1 : 4 Urugan Tanah
Pas. Batu Kosong/ Aanstaping 10 cm
Urugan Pasir 5 cm
DETAIL PONDASI MENERUS 2 Pondasi Telapak
SKALA 1 : 183,33
250
600
800