Sequence 

Of Operation 

Rev – Preliminary 

 
 
Autonomous Start / Stop / Standby Stage 

The unit shall be capable of starting and stopping based on pre‐determined conditions based on the 
atmospheric conditions being favorable for water extraction/generation. 

 
airflow setpoint =
Fan Start Mode  22,300cfm
The main fans shall start and modulate to maintain a desired airflow.  This airflow shall be measured 
using a piezo ring based differential pressure sensor. 

The fans shall modulate to compensate for filter loading, as well as the possibility for power and load 
reduction (future sequences to be developed). 

All fans shall be monitored with individual current based switches (CT’s) to prove fan operation. 

 
upstream coil :61.2F
Refrigeration Staging  downstream coil :53.2F
 Two setpoints shall be employed. 
o The primary setpoint shall be the Dx coil leaving air temperature.  This setpoint shall be 
set for a minimum value (e.g. 55F, adjustable), but shall also be reset based on 
atmospheric conditions (future sequence to be developed).  keep this sentence
o The secondary setpoint shall be based on the refrigeration circuits saturated suction 
pressure.  Should the compressor pull the suction down to the minimum suction 
TBD by customer pressure setpoint (adjustable), the compressors capacity for that circuit shall be 
temporarily limited, to prevent moisture from freezing on the Dx coil. 
 Staging 
o Upon satisfaction that the main fans are operating the first compressor to start shall be 
remove lead lag, a variable speed compressor.  Since each circuit has one variable speed compressor, the 
does not apply circuits shall be lead‐lagged based on runtime hours; the circuit with the least time shall 
be started first.  If in continuous operation, every 100 hours, the start sequence shall be 
remove, does not re‐evaluated. 
apply, each stage o When the lead variable speed compressor reaches 80%, the lag variable speed 
is 1 circuit only compressor shall be started. 
o When the lag variable speed compressor reached 80%, the On‐Off compressor on the 
lead circuit shall be started. 
o When the lag variable speed compressor reaches 80% with the lead circuit On‐Off 
compressor, then the lag circuit On‐Off Compressor shall be started. 
o When additional capacity is needed, the lead variable speed compressor shall be 
released for 100% capacity. 
o If additional capacity is needed the lag variable speed compressor shall be released for 
100% capacity. 
 

SOO Page 1 of 2 
 

49 of 96
Sequence Of Operation 

this applies only if Rev – Preliminary 


condenser  fans
have VFD  
Condenser Fan Control 

The condenser fans shall be modulated to maintain a liquid pressure setpoint. 

The LLP setpoint will consist of three values 

Startup pressure, Normal (Static) Pressure Setpoint, Dynamic Pressure Setpoint (based on the EXV 
operation). 

Electronic Expansion Valve Control 

The electronic expansion valves shall be modulated to maintain a desired suction superheat. 

The EXV will also employ a Maximum Operating Pressure mode to prevent compressor overload on high 
load startup. 

SOO Page 2 of 2 
 