You are on page 1of 2
Compl Which one is not a risk management activity? a) Risk assessment ) Risk generation ) Risk control ‘None of the mentioned 1 Which of the following is not an appraisal cost in SQA? 4) inter-process inspection ©) quality planning d) testing 12 ‘How many CMMI's Maturity Levels are defined in a process meta-model?” a. One b. Three ©. Five d. Seven ‘Section-II (15 Marks ) ‘Objective questions(Answer any 5) ‘What is Software Testing? ‘What are Quality Assurance standards? State COCOMO-1I Model ‘What is Agile model?” ‘What is validation testing. State and explain Formal Technical Review. Pececse ‘What is class-based model? ‘Section-Il (20 Marks) ‘Short Answer question(Answer any 04) _ ‘State and explain Reverse Engineering? State and explain cost benefit analysis. State and explain DevOps. ‘State and explain Scenario based model. Explain a UML diagram for healtheare system. ncn} cn] un] un] a4] =]>]9]-] Explain the importance of software engineering. ‘Section-IV (30 Marks) ‘Long Answer question (answer any 3) ‘State any four types of software testing. ‘State and, effective modular Explain the following in short a. Risk Identification b, Risk Assessment c._Risk Projection jin short SRS for Online Gifting Gallery ‘State and explain good design characteristics.

You might also like