You are on page 1of 1

``

PT. CAHAYA TRITUNGGAL METALINDO


Jalan Imam Munandar no. 380 Pekanbaru

Pre Engineered Building

TO PT. ARTHA ASRI ARSINDO DATE 6-Sep-21


ATTN Bpk. Ari FROM PT. CAHAYA TRITUNGGAL METALINDO
PHONE ATTN Mr. Misran Khanwijaya
e-mail OUR REF IQR/060921/CTM/10
User DPRD Prov Riau PHONE O85271771777
SUBJECT STEEL STRUCTURE BAJA PURLIN ROBERTSON SYSTEM FOR EXCALATOR STRUCTURE Remark 1

PERMINTAAN PENAWARAN HARGA


NO NAMA BARANG QTY UNIT PRICE TOTAL PRICE

I STEEL STRUCTURE BAJA PURLIN ROBERTSON SYSTEM FOR EXCALATOR STRUCTURE 2 unit 1,355,000,000.00 2,710,000,000.00

1 MAIN FRAME
ROBERTSON C30030D C PURLIN Hi Tensile Galvanized G450 1,081.25 Kg
ROBERTSON C20019D C PURLIN Hi Tensile Galvanized G450 1,124.95 Kg
ROBERTSON C30024D C PURLIN Hi Tensile Galvanized G450 1,944.33 Kg
ROBERTSON C15015D C PURLIN Hi Tensile Galvanized G450 595.71 Kg
ROBERTSON C20015D C PURLIN Hi Tensile Galvanized G450 101.35 Kg
ROBERTSON C35030D C PURLIN Hi Tensile Galvanized G450 3,237.00 Kg

2 PLATE CONNECTOR
Plate Connector Plate SS400 Finish Galvanized 1,294.00 Kg
Baseplate Plate SS400 Finish Galvanized 728.00 Kg

3 BOLT AND NUT


Grade 8.8 Finish Galvanized M12-50 2,900.00 Pcs

4 WIND BRACING
Roundbar M12 Finish Galvanized 121.00 Kg
Turn Buckle 24.00 Pcs

5 ANCHORAGE
Anchor M20-600 108.00 Pcs

6 FLOOR DECK
Floor Deck 165.00 m2
End Stop 103.00 m'
Shear Connector 200.00 Pcs

TOTAL : 2,710,000,000.00
PPN 10 % : 271,000,000.00
GRAND TOTAL : 2,981,000,000.00

Term & Condition :


1. Down Payment : 30%, CBD 70%
2. Standard material to be supply in as agreed schedule
3. Purlin di kerjakan sesuai dengan actual drawing yang diterima
4. Total Nilai Amount dapat berubah sesuai dengan drawing yang di terima dan actual barang yang di terima
5. Harga bisa berubah sewaktu waktu tanpa pemberitahuan karena harga RAW Material yang fluktuatif

Salam hormat,
Pekanbaru, 06 September 2021

PT. CAHAYA TRITUNGGAL METALINDO


Misran Khanwijaya

You might also like