I STEEL STRUCTURE BAJA PURLIN ROBERTSON SYSTEM FOR EXCALATOR STRUCTURE 2 unit 1,355,000,000.00 2,710,000,000.00
1 MAIN FRAME
ROBERTSON C30030D C PURLIN Hi Tensile Galvanized G450 1,081.25 Kg
ROBERTSON C20019D C PURLIN Hi Tensile Galvanized G450 1,124.95 Kg
ROBERTSON C30024D C PURLIN Hi Tensile Galvanized G450 1,944.33 Kg
ROBERTSON C15015D C PURLIN Hi Tensile Galvanized G450 595.71 Kg
ROBERTSON C20015D C PURLIN Hi Tensile Galvanized G450 101.35 Kg
ROBERTSON C35030D C PURLIN Hi Tensile Galvanized G450 3,237.00 Kg
2 PLATE CONNECTOR
Plate Connector Plate SS400 Finish Galvanized 1,294.00 Kg
Baseplate Plate SS400 Finish Galvanized 728.00 Kg
4 WIND BRACING
Roundbar M12 Finish Galvanized 121.00 Kg
Turn Buckle 24.00 Pcs
5 ANCHORAGE
Anchor M20-600 108.00 Pcs
6 FLOOR DECK
Floor Deck 165.00 m2
End Stop 103.00 m'
Shear Connector 200.00 Pcs
TOTAL : 2,710,000,000.00
PPN 10 % : 271,000,000.00
GRAND TOTAL : 2,981,000,000.00
Salam hormat,
Pekanbaru, 06 September 2021