You are on page 1of 2
4 somata conn nf ittoncondians ‘et em P= leararaeineia einen Automatic Transfer Switch at anooed Wears pare orca Instruction Suge [ma a —— Woigung) oe ore, “oat coin [— — vest Sek aaa seers ‘ar weow OQ comico | Sea REE ou Teer some won ian nC — . ‘awe — Fig.1 Contour dimensions and installation dimensions seen en 1. (Must be connected ) Take zero line and fr line from the common control incoming linete connectAR (live wire) /AN (neutral ine) 2, (Mustbe connected } Take 2etline and fire line from the backup control incoming line taconnect QR (ive wire)! N (neutral ing) 3.The power indication signal is passive output, and the generator signal taken (common) and (normally closed) 4.Connect the load ond atthe lower end of the (standby power supply side), Stepped ‘wring 5.There isan isolation board on the oad. When wiring, first remove the isolation bose, Connect the load and then intall the isolation board {itis recommended to connect the ‘oad fret, then connect the Backup power upp), Note: Normal type wiring same as solar type. For solar type.the backup power must be connected to the city power. Fig. 2Wiring diagram of controller

You might also like