LAMPIRAN 3 PIPELINE GMS P LAYANG > 10 PSIG LAMPIRAN 4 ❶ DIBANDING TEKANAN GAS DARI MRS PUSRI
PERSONEL KONTRAKTOR ❸ OPERATOR MAIN VALVE READY
STATUS VALVE ❹ A. POSISI VALVE OPEN/CLOSE - SESUAI LAMPIRAN 9
SESUAI PID LAMPIRAN 9 B. PSV DIJAGA OPERAT0R KHUSUS UNTUK MONITOR NAIK & TURUN NYA TEKANAN ❺
YES NO
START GAS IN
C. PADA STREAM A TURBINE METER D. OPEN VALVE NO. 1 AT TIE IN POINT
OPEN VALVE NO. 7 & NO. 12 PADA STREAM B TURBINE METER E. OPEN VALVE NO. 28 PADA STREAM C OPEN VALVE NO. 13 & NO. 39 CEK LEL PADA STREAM C CLOSE VALVE NO. 28 CLOSE VALVE NO. 24, 25, 27, JIKA KADAR METHANE > 92% NO. 28 & NO. 29 F. OPEN VALVE NO 36 PADA STREAM D CEK LEL CLOSE VALVE NO 32, 33, 35, CLOSE VALVE NO. 28 NO. 36 & NO. 37 JIKA KADAR METHANE > 92%