SCHEDULE OF OPENINGS
SF. 2 . 15 X 2 . 15 M. SLIDING FOLDING DOOR
D 1 . 20 X 2 . 15 M. T.W. PANELLED DOOR
D1 0 . 90 X 2 . 15 M. T.W. PANELLED DOOR

D2 0 . 75 X 2 . 00 M. T.W. PANELLED DOOR


9.15 M. 9.15 M. W 1 . 50 X 1 . 20 M. ALU. GLAZED WINDOW
W1 1 . 20 X 0 . 90 M. ALU. GLAZED WINDOW
W V V W W
W2 1. 50 X 0 . 09 M. ALU. GLAZED WINDOW

W3 0 . 90 X 1. 20 M. ALU. GLAZED WINDOW

POOJA V 0 . 60 X 0 . 90 M. ALU. LOUVERED VANTILATOR

BALC. 1.2 WIDE


ROOM STORE
2.3 X 2.15 2.4 X3.0 W3 M. BED ROOM BEDROOM W
W BEDROOM 4.90 X 3.05
3.65 X 3.65
3.65 X3.65
5.90 M.
D1

D1 D1
UP D2 UP
W.C D2
V 1.2 X 1.05 TOILET
V
A D2 DN A10.65 M. A 2.45 X 1.65
DN A
D1
BATH D
V 2.1 X 1.20

KITCHEN AREA STATEMENT SQ. MTS.


3.65 X 2.75 W2 * AREA OF THE PLOT 300 . 00
* PERMISSIBLE PLINTH AREA 100 . 00
TERRACE * PROPOSED B/UP IN GR. FLOOR 96 . 99
W
LIVING ROOM
8.7m X 4.6 * PROPOSED B/UP IN 1st. FLOOR 53 . 98
4.85 X 3.80
W1 * TOTAL PROPOSED B/UP AREA 150 . 79
* AREA OPEN TO SKY 203 . 01
D OTLA 1.8 WIDE
* PERMISSIBLE F. S. I. 1 . 00 %
* F. S. I. TO BE CONSUMED 0 . 50.26 %
W
DRAWING SHOWING PROPOSED BUNGALOW
IN PLOT NO. 20,OF THE N. A. LAYOUT BEARING
UP
FIRST FLOOR PLAN GUT NO.1 / 20 OF VILLAGE -

TALUKA-TALASRI,DISTRICT- PALGHAR._FOR.__

GROUND FLOOR PLAN SCALE._____ 1 : 100


SHRI. PRITESH B. PRAJAPATI

SCALE._____ 1 : 100 OWNER'S SIGNATURE JOB NO._ 857 / 2019


DRAWING NO.- 01 / 01
SCHEME DRAWING
DATE :- 17 - 09 - 2019
CARPET AREA STATEMENT
MAKARAND KARANDIKAR
0 CARPET AREA IN GROUND FLOOR = 64.23 SQ.MTS. A R C H I T E C T.
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
0 CARPET AREA IN FIRST FLOOR = 36.78 SQ.MTS. DAHANU ROAD DIST. PALGHAR PIN._ 401 602

0 TOTAL CARPET AREA = 101.01 SQ. MTS.


9.15 M.

10.65 M.
A

GROUND FLOOR AREA PLAN


SCALE.____ 1: 200

GROUND FLOOR AREA CALCULATION


AREA IN MTS. SQ. MTS.
A 9.15 X 10 . 65 96.99
NET FLOOR AREA 96.99

O/H WATER TANK

STAIRCASE CABIN

2.45
9.15 M.

5.90 M.
TERRACE A

LOFT FIRST FLOOR AREA PLAN


SCALE.____ 1: 200

3.05
FIRST FLOOR AREA CALCULATION

4.15
4.45
AREA IN MTS. SQ. MTS.
A 9.15 X 5.90 53.98
TOILET 1st FLR. NET FLOOR AREA 53.98

LOFT

3.05
4.45
DRAWING SHOWING PROPOSED BUNGALOW

GR.FLR. IN PLOT NO. 20,OF THE N. A. LAYOUT BEARING

GUT NO.1 / 20 OF VILLAGE -


GL. GL.
TALUKA-TALASRI,DISTRICT- PALGHAR._FOR.__

SHRI. PRITESH B. PRAJAPATI


SOUTH SIDE ELEVETION SECTION @ A-A OWNER'S SIGNATURE JOB NO._ 857 / 2019
SCALE._____ 1 : 100 SCALE._____ 1 : 100 DRAWING NO.- 01 / 01
SCHEME DRAWING
DATE :- 17 - 09 - 2019

MAKARAND KARANDIKAR
A R C H I T E C T.
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
DAHANU ROAD DIST. PALGHAR PIN._ 401 602
SCHEDULE OF OPENINGS
SF. 2 . 15 X 2 . 15 M. SLIDING FOLDING DOOR
D 1 . 05 X 2 . 15 M. T.W. PANELLED DOOR
D2 0 . 75 X 2 . 00 M. T.W. FLUSHED DOOR

7.60 M. W 1 . 50 X 1 . 20 M. ALU. GLAZED WINDOW


W1 0 . 90 X 1 . 20 M. ALU. GLAZED WINDOW
7 . 60 M.
W2 1 . 50 X 0 . 90 M. ALU. GLAZED WINDOW
W W2
V 0 . 60 X 0 . 90 M. ALU. LOUVERED VANTILATOR

LIVING ROOM KITCHEN W2


W
3.90 M X 3.65 M 3.00 M X 3.35 M
STILT FOR PARKING

D1
BATH
2.1 X 1.2
DN V
A A
10.65 M

D2 W.C.
A A

10 . 65 M.

2 . 85 M.
D21.2 X 1.05 V
UP AREA STATEMENT SQ. MTS.
UP * AREA OF THE PLOT 164 . 80
* PERMISSIBLE PLINTH AREA 50% 82 . 40
D1 D1 * PROPOSED PLINTH AREA 80 . 94
3 . 25 M.
* PROPOSED B/UP IN 1st. FLOOR 80 . 94
D2 W * PROPOSED B/UP IN 2nd. FLOOR 80 . 94
W1 BED ROOM
2.70 M X 3.65 M TOILET M.BED ROOM STILT FOR PARKING * TOTAL PROPOSED B/UP AREA 161 . 88
3.00 M X 4.25 M * AREA OPEN TO SKY 83 . 86
1.2 X 2.4
* PERMISSIBLE F. S. I. 1 . 20 %
SF. SF. * F. S. I. TO BE CONSUMED 0 . 81 . 85 %

BALCONY BALCONY
1.20 M WIDE 1.20 M WIDE
DRAWING SHOWING PROPOSED BUNGALOW
IN THE LAND BEARING S. NO. 18 / 18

VILLAGE - URUN TALUKA VALVA

FIRST & SECOND FLOOR PLAN STILT FLOOR PLAN DISTRICT - SANGALI FOR.__

MRS. ASHWINI BHUSHAN PATIL


SCALE._____ 1 : 100 SCALE._____ 1 : 100
OWNER'S SIGNATURE JOB NO._ 858 / 2019
DRAWING NO.- 01 / 01
SCHEME DRAWING
DATE :- 05 - 10 - 2019
CARPET AREA STATEMENT MAKARAND KARANDIKAR
A R C H I T E C T.
0 CARPET AREA IN FIRST FLOOR = 60.40 SQ.MTS.
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
0 CARPET AREA IN SECOND FLOOR = 60.40 SQ.MTS. DAHANU ROAD DIST. PALGHAR PIN._ 401 602

0 TOTAL CARPET AREA = 120.80 SQ.MTS.


7.60 M.

10.65 M.
O/H/W Lvl.
A
+12.85

Stair.Lvl.
+11.20
FIRST & SECOND FLOOR AREA PLAN
SCALE.____ 1: 200

2 . 30 M.
FIRST & SECOND FLOOR
AREA CALCULATION
AREA IN MTS. SQ. MTS.
Terr.Flr.Lvl.

1.05
A 7 . 60 X 10 . 65 M. 80 . 94
+8.90
NET FLOOR AREA 80 . 94

3 . 05 M.
6.10

4.26
2nd Flr.Lvl.
+5.85

3 . 05 M.
6.10
4.26

4.26
1st Flr.Lvl.
+2.80

2 . 20 M.

2 . 20 M.
DRAWING SHOWING PROPOSED BUNGALOW
IN THE LAND BEARING S. NO. 18 / 18
+0.15 VILLAGE - URUN TALUKA VALVA

0.15
Gr.Flr.Lvl. DISTRICT - SANGALI FOR.__
±0.0
MRS. ASHWINI BHUSHAN PATIL

WEST SIDE ELEVETION SECTION @ A-A OWNER'S SIGNATURE JOB NO._


DRAWING NO.- 01 / 01
858 / 2019

SCHEME DRAWING
SCALE._____ 1 : 100 SCALE._____ 1 : 100
DATE :- 05 - 10 - 2019

MAKARAND KARANDIKAR
A R C H I T E C T.
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
DAHANU ROAD DIST. PALGHAR PIN._ 401 602
DRAWING SHOWING PROPOSED BUNGALOW
IN THE LAND BEARING S. NO. 18 / 18

VILLAGE - URUN TALUKA VALVA

DISTRICT - SANGALI FOR.__

MRS. ASHWINI BHUSHAN PATIL


OWNER'S SIGNATURE JOB NO._ 858 / 2019
DRAWING NO.- 01 / 01
SCHEME DRAWING
DATE :- 05 - 10 - 2019

MAKARAND KARANDIKAR
A R C H I T E C T.
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
DAHANU ROAD DIST. PALGHAR PIN._ 401 602
REMARKS:-

BALC. 4'0" WIDE


BALC. 4'0" WIDE
STILT STILT
BED ROOM
BED ROOM 9'0"X9'6"
9'0"X11'6" KITCHEN BED ROOM
9'6"X7'6" 9'6"X13'0"

W.C.
4'X3'
STILT W.C.
4'X3'
BATH
5'6"X4'0"
BATH KITCHEN
5'6"X4'0" LIVING ROOM 9'6"X8'3"
9'6"X14'0"
STILT STILT
LIVING ROOM
BED ROOM 3 PASS. 3'6" WIDE 2 13' 0" X 11' 0"
9'0"X10'0"

UP UP
1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10

DN DN

STILT LIVING ROOM BED ROOM


12' 0" X 10' 0" 9'0"X10'0"

PROPOSED RESIDENTIAL BUILDING


AT VANGAON FOR
BATH
5'0"X4'0"
KITCHEN MR. SURESHBHAI KANSARA
8' 0" X 7' 6"
W.C.
4'X3' OWNER'S SIGNATURE JOB NO._ 857 / 2019
DRAWING NO.- 01 / 01

BALC. 4'0" WIDE


SCHEME DRAWING
STILT
BED ROOM DATE :- 17 - 09 - 2019
13' 6" X 10' 0"
MAKARAND KARANDIKAR
A R C H I T E C T.
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
DAHANU ROAD DIST. PALGHAR PIN._ 401 602

GROUND FLOOR PLAN TYPICAL FLOOR PLAN


46 . 30 M.
A C
12 . 10 M.

12 . 10 M.
DUCT STILT FOR PARKING
2.75 M.
STILT FOR PARKING
1.15X0.60
DUCT
UP
DUCT
1.15X0.60
STILT FOR PARKING 3.15 X 1.60 STILT FOR PARKING
1.15X0.60
DUCT
2.75 M. SCHEDULE OF OPENINGS
1.45X1.50 1.45X1.50 1.45X1.50 UP
RS. 2 . 45 X 2 . 45 M. M.S. ROLLING SHUTTER

3.60 M.
3.60 M.
SF 2 . 15 X 2 . 15 M. SLIDING FOLDING GLAZED DOOR
2 . 30 M.
2 . 30 M.
D 1 . 20 X 2 . 15 M. TW. PANELLED DOOR
WING - A D1 0 . 90 X 2 . 15 M. TW. PANELLED DOOR
WING - B D2 0 . 75 X 2 . 00 M. TW. FLUSHED DOOR
W 1 . 20 X 0 . 95 M. ALU. GLAZED WINDOW
46 . 30 M.
A C W1 1 . 20 X 1 . 20 M. ALU. GLAZED WINDOW
STILT PLAN V 0 . 60 X 0 . 95 M. ALU. LOUVERED VENTILATOR
SCALE.____ 1 : 100

DRAWING SHOWING PROPOSED RESIDENTIAL


& COMMORCIAL BUILDING "E" IN PLOT NO.
19, 20 & 21 OF THE LAY - OUT BEARING S. NO.
3.60 M.

A
68/ 25/ 26/ 27 OF VILLAGE - MANPHOD
TALUKA DAHANU DIST. PALGHAR FOR.__
2.75 M. MR. IQBAL H. DHANANI
MRS. ROSHAN I. DHANANI
STAIRCASE AREA PLAN
MR. ASIF I. DHANANI
SCALE.____ 1: 200
MR. ZUBER I. DHANANI
CARPET AREA STATEMENT OWNER'S SIGNATURE JOB NO._ 844 / 2019

STAIRCASE AREA CALCULATION * CARPET AREA IN FIRST FLOOR = 270 . 76 SQ. MTS. DRAWING NO.- E/02 /02
BUILDING PLAN
AREA IN MTS. SQ. MTS. * CARPET AREA IN SECOND FLOOR = 270 . 76 SQ. MTS. DATE :- 19 - 09 - 2019

A 2 . 75 X 3 . 60 M. 9 . 90 * CARPET AREA IN RAIZED = 270 . 76 SQ. MTS. MAKARAND KARANDIKAR


A R C H I T E C T.
AREA 9 . 90 SECOND FLOOR
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
X 2
DAHANU ROAD DIST. PALGHAR PIN._ 401 602
NET AREA 19 . 80 TOTAL CARPET AREA = 812 . 28 SQ. MTS.
46 . 30 M.
A C

BL2 3 . 05 M. w w BL3 3 . 05 M. BL6 3 . 05 M. w

BAL. 0.90 M. WIDE BAL. 0.90 M. WIDE BAL. 0.90 M. WIDE


w BL1 2 . 80 M. BL4 2 . 80 M. w w BL5 2 . 80 M. BL7 3 . 05 M. w
KITCHEN KITCHEN KITCHEN
SF 2.60 X 2.30 2.60 X 2.30 SF SF 2.60 X 2.30
BAL. 0.90 M. WIDE BAL. 0.90 M. WIDE BAL. 0.90 M. WIDE BAL. 0.90 M. WIDE
KITCHEN KITCHEN KITCHEN KITCHEN
2.60 X 2.30 SF LIVING ROOM 0.95X 0.95X LIVING ROOM SF 2.60 X 2.30 2.60 X 2.30 SF LIVING ROOM 0.95X SF 2.60 X 2.30
2.90 X 3.35 0.75 D2 BATH BATH D2 0.75 2.90 X 3.35 2.90 X 3.35 0.75 D2 BATH
D2 1.50X1.20 1.50X1.20 D2 D2 1.50X1.20
0.95X LIVING ROOM CARPET W. C. W. C. CARPET LIVING ROOM 0.95X 0.95X LIVING ROOM CARPET W. C. LIVING ROOM 0.95X
BATH D2 0.75 AREA AREA AREA
2.90 X 3.35 19.34 SMT.
0.95X V V 0.95X
19.34 SMT.
2.90 X 3.35 0.75 D2 BATH BATH D2 0.75 2.90 X 3.35 19.34 SMT.
0.95X V 2.90 X 3.35 0.75 D2 BATH
1.50X1.20 D2 1.20 V V 1.20 D2 1.50X1.20 1.50X1.20 D2 1.20 V D2 1.50X1.20
4 5 12
W. C. CARPET CARPET W. C. W. C. CARPET CARPET W. C.
D1 D1 D1
12 . 10 M.

12 . 10 M.
0.95X AREA AREA 0.95X 0.90X AREA AREA 0.95X
V 19.34 SMT. 3 D1 PASSAGE 1 . 25 M. WIDE D1 8 19.34 SMT. V V 19.34 SMT. 9 D1 PASSAGE 1.25 M. WIDE D1 13 19.34 SMT. V
V 1.20 LOBBY LOBBY 1.20 V DUCT V 1.20 LOBBY 1.20 V
2.90 X 2.05 DN UP 2.90 X 2.05 3.15 X 1.60 2.90 X 2.05
V
V W. C.
0.95X
1.20
CARPET
AREA
19.34 SMT.
2 D1
D1 1.15X0.60
DUCT DUCT
1.15X0.60 D1
D1 7 CARPET
AREA
19.34 SMT.
W. C. V
0.95X
1.20
V V
V W. C.
0.95X
1.20
CARPET
AREA
19.34 SMT.
10
D1
D1 1.15X0.60
DUCT
DN
D1
UP 14
CARPET
AREA
19.34 SMT.
W. C. V
0.95X
1.20
V SCHEDULE OF OPENINGS
BATH D2 1 1.45X1.50 1.45X1.50 6 BATH BATH D2
11 1.45X1.50 D2 BATH
CARPET W. C. V V W. C. CARPET D2 CARPET W. C. V RS. 2 . 45 X 2 . 45 M. M.S. ROLLING SHUTTER
1.50X1.20D2 0.95X LIVING ROOM AREA 0.95X V V 0.95X AREA LIVING ROOM 0.95XD21.50X1.20 1.50X1.20D2 0.90X LIVING ROOM
AREA 0.95X V LIVING ROOM 0.95XD21.50X1.20
0.75 2.90 X 3.35 19.34 SMT. 1.20 1.20 19.34 SMT. 2.90 X 3.35 0.75 0.75 2.90 X 3.35 19.34 SMT. 2.90 X 3.35 0.75
1.20
D2
BATH BATH D2 D2
BATH SF 2 . 15 X 2 . 15 M. SLIDING FOLDING GLAZED DOOR
LIVING ROOM 0.95X 1.50X1.20 1.50X1.20 0.95X LIVING ROOM LIVING ROOM 0.95X 1.50X1.20
KITCHEN SF 0.75 D2 2 . 30 M. D2 0.75 SF KITCHEN KITCHEN SF 0.75 D2 SF KITCHEN
2.90 X 3.35 2.90 X 3.35 2.90 X 3.35 D 1 . 20 X 2 . 15 M. TW. PANELLED DOOR
2.60 X 2.30 2.60 X 2.30 2.60 X 2.30 2.60 X 2.30
2 . 30 M. D1 0 . 90 X 2 . 15 M. TW. PANELLED DOOR
BAL. 0.90 M. WIDE BAL. 0.90 M. WIDE BAL. 0.90 M. WIDE BAL. 0.90 M. WIDE
SF KITCHEN KITCHEN SF SF KITCHEN
2.60 X 2.30 WING - A 2.60 X 2.30 2.60 X 2.30 BL8 D2 0 . 75 X 2 . 00 M. TW. FLUSHED DOOR
w BL14 2 . 80 M. BL11 2 . 80 M. w w BL10 2 . 80 M. 2 . 80 M. w
BAL. 0.90 M. WIDE BAL. 0.90 M. WIDE
BAL. 0.90 M. WIDE WING - B W 1 . 20 X 0 . 95 M. ALU. GLAZED WINDOW
BL13 3 . 05 M. BL12 3 . 05 M. BL9 3 . 05 M.
w w w
W1 1 . 20 X 1 . 20 M. ALU. GLAZED WINDOW
46 . 30 M.
V 0 . 60 X 0 . 95 M. ALU. LOUVERED VENTILATOR
A C
FIRST, SECOND & RAIZED SECOND FLOOR PLAN
SCALE.____ 1 : 100 DRAWING SHOWING PROPOSED RESIDENTIAL
& COMMORCIAL BUILDING "E" IN PLOT NO.
FIRST, SECOND & RAIZED SECOND 19, 20 & 21 OF THE LAY - OUT BEARING S. NO.
FLOOR AREA CALCULATION
AREA IN MTS. SQ. MTS.
68/ 25/ 26/ 27 OF VILLAGE - MANPHOD
A 46 . 30 X 12 . 10 M. 560 . 23 CARPET AREA IN FIRST, SECOND & RAIZED TALUKA DAHANU DIST. PALGHAR FOR.__
46 . 30 M.
DEDUCTION SECOND FLOOR FLATS
3.05 M. 2.80 M. 3.05 M. 3.05 M. 2.30 M. 3.05 M. 3.05 M. 2.80 M. 5 . 85 M. 2.80 M. 3.05 M. 3.05 M. 2.30 M. 3.05 M. 3.05 M.
* CARPET AREA IN FLAT NO. 1 = 19 . 34 SQ. MTS. MR. IQBAL H. DHANANI
1.15

1.15

4 2 2 5 2 4 1 2 . 80 X 2 . 35 X 7 NO. 46 . 06
1 1 1 6 * CARPET AREA IN FLAT NO. 2 = 19 . 34 SQ. MTS.
3.05X1.15 3.05X1.20 3.05X1.20 5.85 X 1.15 3.05X1.20 3.05X1.15
3 3
2 3 . 05 X 1 . 20 X 6 NO. 21 . 96
MRS. ROSHAN I. DHANANI
4.10 M.

4.10 M.

2.80X2.35 2.30X4.10 2.80X2.35 2.80X2.35 2.30X4.10 3.05X2.35 * CARPET AREA IN FLAT NO. 3 = 19 . 34 SQ. MTS.
3 2 . 30 X 4 . 10 X 2 NO. 18 . 86 * CARPET AREA IN FLAT NO. 4 = 19 . 34 SQ. MTS.
12 . 10 M.

12 . 10 M.

11 13
5.85X0.70 3.95X0.70 * CARPET AREA IN FLAT NO. 5 = 19 . 34 SQ. MTS.
MR. ASIF I. DHANANI
1.60

1.60

8 1.65X1.60 A 9 1.65X1.60 8 4 3 . 05 X 1 . 15 X 4 NO. 14 . 03


1.15X0.60 14 14 1.15X0.60 1.15X0.60 14 * CARPET AREA IN FLAT NO. 6 = 19 . 34 SQ. MTS.
7 7 3.15 X 1.60 7
5 5 . 85 X 1 . 15 X 2 NO. 13 . 45
MR. ZUBER I. DHANANI
4.10 M.

4.10 M.

1.45X1.50 1.45X1.50 1.45X1.50 * CARPET AREA IN FLAT NO. 7 = 19 . 34 SQ. MTS.


2.80X2.35 2.80X2.35 2.80X2.35 2.80X2.35
2.30X2.0 6 3 . 05 X 2 . 35 X 1 NO. 7 . 16 * CARPET AREA IN FLAT NO. 8 = 19 . 34 SQ. MTS.
3.05X1.15 3.05X1.20 3.05X1.20 5.85 X 1.15 3.05X1.20 2.50X1.30 3.05X1.15
1 10 1 1 1 * CARPET AREA IN FLAT NO. 9 = 19 . 34 SQ. MTS.
1.15

1.15

4 2 2 5 2 12 4 7 1 . 45 X 1 . 50 X 3 NO. 6 . 52
3.05 M. 2.80 M. 3.05 M. 3.05 M. 2.30 M. 3.05 M. 3.05 M. 2.80 M. 5 . 85 M. 2.80 M. 3.05 M. 3.05 M. 2.50 M. 2.85 M. 3.05 M.
* CARPET AREA IN FLAT NO. 10 = 19 . 34 SQ. MTS. OWNER'S SIGNATURE JOB NO._ 844 / 2019
8 1 . 65 X 1 . 60 X 2 NO. 5 . 28 * CARPET AREA IN FLAT NO. 11 = 19 . 34 SQ. MTS.
46 . 30 M.
9 3 . 15 X 1 . 60 X 1 NO. 5 . 04 * CARPET AREA IN FLAT NO. 12 = 19 . 34 SQ. MTS.
DRAWING NO.- E/02 /02
FIRST, SECOND & RAIZED SECOND FLOOR AREA PLAN * CARPET AREA IN FLAT NO. 13 = 19 . 34 SQ. MTS. BUILDING PLAN
SCALE.____ 1: 200 10 2 . 30 X 2 . 00 X 1 NO. 4 . 60
* CARPET AREA IN FLAT NO. 14 = 19 . 34 SQ. MTS.
11 5 . 85 X 0 . 70 X 1 NO. 4 . 09 TOTAL CARPET AREA / FLOOR = 270 . 76 SQ. MTS.
DATE :- 19 - 09 - 2019
12 2 . 50 X 1 . 30 X 1 NO. 3 . 25

13 3 . 95 X 0 . 70 X 1 NO. 2 . 76
MAKARAND KARANDIKAR
14 1 . 15 X 0 . 60 X 3 NO. 2 . 07 A R C H I T E C T.
TOTAL DEDUCTION 155 . 13 'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
NET FLOOR AREA 405 . 10
DAHANU ROAD DIST. PALGHAR PIN._ 401 602
28 . 70 M.
3.05 M. 2.60 M. 2.90 M. 3.05 M. 2.60 M. 3.05 M. 2.30 M. 3.05 M. 2.90 M. 2.90 M.

0.45
L P T U

1.65

1.65

1.65

1.75
1.75

1.20
K M O Q S V W

1.20

1.15
F G I J N R X

3.50M.
4.10 M.
H
E Y
0.30

15 . 25 M.
D
Z

15 . 25 M.
1.60
1.65 C

5.15M.
B a

4.10 M.
A 1.05
v p b

2.75 M.1.05 1.15


l

1.15
1.20
x w u t c 0.60

1.65

1.65

1.65

2.20
q o m

1.0
s r n k d 0.45
j e

3.85 M.
f

2.45
i g
h
3.05 M. 2.60 M. 2.90 M. 3.05 M. 2.60 M. 5.90 M. 2.65 M. 2.90 M. 3.05 M.
28 . 70 M.

FIRST, SECOND & RAIZED SECOND FLOOR


CIRCUMFRENCE LENGTH PLAN SCHEDULE OF OPENINGS
28 . 70 M. SCALE.____ 1: 200
RS. 2 . 45 X 2 . 45 M. M.S. ROLLING SHUTTER
CIRCUMFRENCE LENGTH SF 2 . 15 X 2 . 15 M. SLIDING FOLDING GLAZED DOOR
A 4 . 10 M.
D 1 . 20 X 2 . 15 M. TW. PANELLED DOOR
B 1 . 65 M.
C 1 . 60 M. D1 0 . 90 X 2 . 15 M. TW. PANELLED DOOR
2.75 M. D 1 . 65 M.
D2 0 . 75 X 2 . 00 M. TW. FLUSHED DOOR
E 4 . 10 M.
F 3 . 05 M. W 1 . 20 X 0 . 95 M. ALU. GLAZED WINDOW
2.30 M. G 1 . 20 M.
STILT FOR PARKING

3.60 M.
H 2 . 60 M. W1 1 . 20 X 1 . 20 M. ALU. GLAZED WINDOW
I 1 . 15 M. V 0 . 60 X 0 . 95 M. ALU. LOUVERED VENTILATOR
J 2 . 90 M.
K 1 . 65 M.
L 3 . 05 M.
DUCT DUCT DUCT
M 1 . 65 M. DRAWING SHOWING PROPOSED RESIDENTIAL
1.45X1.20 1.45X1.20 1.45X1.20
N 2 . 60 M.
UP O 1 . 65 M. & COMMORCIAL BUILDING "E" IN PLOT NO.
15 . 25 M.

15 . 25 M.
P 3 . 05 M.
STILT FOR PARKING Q 1 . 75 M. 19, 20 & 21 OF THE LAY - OUT BEARING S. NO.
R 2 . 30 M.
DUCT S 1 . 75 M.
DUCT
1.45X1.20
DUCT
3.15 X 1.20
1.30 X
3.40 X
T 3 . 05 M. 68/ 25/ 26/ 27 OF VILLAGE - MANPHOD
U 0 . 45 M.
V 2 . 90 M. TALUKA DAHANU DIST. PALGHAR FOR.__
W 1 . 20 M.

STILT FOR PARKING X


Y
2 . 90
3 . 50
M.
M.
MR. IQBAL H. DHANANI
Z 0 . 30 M.
a 5 . 15 M. MRS. ROSHAN I. DHANANI
b 1 . 05 M.

STILT FOR PARKING c


d
1 . 15
0 . 60
M.
M.
MR. ASIF I. DHANANI
e
f
1 . 05
0 . 45
M.
M.
MR. ZUBER I. DHANANI
g 2 . 75 M.
h 3 . 05 M.
OWNER'S SIGNATURE JOB NO._ 844 / 2019
i 2 . 45 M.
j 2 . 90 M. DRAWING NO.- E/02 /02
k 2 . 20 M.
l 2 . 65 M. BUILDING PLAN
m 1 . 65 M.
28 . 70 M. n 5 . 90 M.
DATE :- 19 - 09 - 2019
o 1 . 65 M.
p
q
2 . 60
1 . 65
M.
M.
MAKARAND KARANDIKAR
r 3 . 05 M.
A R C H I T E C T.
STILT PLAN ( PARKING ) s
t
1 . 00
2 . 90
M.
M. 'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
SCALE.____ 1 : 100 u 1 . 15 M.
v 2 . 60 M. DAHANU ROAD DIST. PALGHAR PIN._ 401 602
w 1 . 20 M.
x 3 . 05 M.
TOTAL = 111 . 60 RMT.
28 . 70 M.
A BL4 3 . 10 M. 28 . 70 M.
3.05 M. 2.60 M. 2.90 M. 3.05 M. 2.60 M. 3.05 M. 2.30 M. 3.05 M. 2.90 M. 3.20 M.
W W W 19

1.60

1.65
BAL. 0.90 M. WIDE 12 13 15 16 2.90X0.45 11
8
BL2 2 . 90 M. BL3 2 . 60 M. BL5 2 . 90 M. 3.05X1.60 2.90X1.65 2.60X1.65 2.30X1.70 3.20X1.65

3.50M.
4.10 M.
SF 2.60X2.85 21
BAL. 0.90 M. WIDE KITCHEN BAL. 0.90 M. WIDE KITCHEN KITCHEN BAL. 0.90 M. WIDE 10 10 10
0.30X3.50
W BL1 2 . 60 M.

15 . 25 M.
1.65X1.60 1.30X3.40
2.60 X 2.30 2.60 X 2.30 2.60 X 2.30 1.45X1.20 1.45X1.20 1.45X1.20

15 . 25 M.
1.60
SF SF LIVING ROOM SF 18

5.15M.
2.75 X 3.35 14
BAL. 0.90 M. WIDE 2.30 M. 10 A 17

4.10 M.
KITCHEN 1.45X1.20 3.15X1.20
LIVING ROOM 0.95X BATH LIVING ROOM 0.95X BATH BATH 0.95X CARPET
2.60 X 2.30 SF AREA LIVING ROOM 2.60X5.10 1.05X1.15

2.75 M.1.05 1.15


2.60X4.65 2.65X4.65
2.75 X 3.35 1.20 D11.50X1.20 2.75 X 3.35 1.20 D11.50X1.20 1.50X1.20D1 1.20 19.27 SMT. 20
2.75 X 3.35 3.05X3.85 2.90X3.95
D1 D1 D1 3.05X2.95 5.90X2.95 22
7

3.85 M.
2.90X2.45
LIVING ROOM CARPET W. C. V CARPET W. C. V V W. C. CARPET
5
2
6 4 3 0.45X1.05
AREA AREA DUCT DUCT D AREA 7 1
BATH D10.95X0.75 2.75 X 3.35 19.27 SMT.
0.95X
V
DUCT
19.27 SMT.
0.95X
V1.45X1.20 V
0.95X D 8 20.61 SMT. 9
1.45X1.20
1.50X1.20 D1 5
1.20 1.45X1.20 1.20 1.20

PASS. 1.20 M. WIDE


W. C. CARPET
6 3.05 M. 2.60 M. 2.90 M. 3.05 M. 2.60 M. 5.90 M. 2.65 M. 2.90 M. 3.05 M.
AREA D D UP DN D1 BATH
15 . 25 M.

15 . 25 M.
V 0.95X 28 . 70 M.
4 D 0.95X
V 1.20 18.84 SMT. LOBBY
2.75 X 2.05
PASSAGE 1 . 35 M. WIDE 1.50 1.50X1.20
V
FIRST, SECOND & RAIZED SECOND FLOOR AREA PLAN
SCHEDULE OF OPENINGS
D D
V W. C.
V 0.95X
CARPET 3 D 1 10 DUCT 1.25X W. C.
V SCALE.____ 1: 200 RS. 2 . 45 X 2 . 45 M. M.S. ROLLING SHUTTER
AREA DUCT W. C. V
1.20 18.84 SMT.
W. C. CARPET DUCT V W. C. CARPET
1.30 X 0.90 D11.2X0.90
2 0.95X 1.45X1.20 AREA 0.95X 3.15 X 1.20
0.95X AREA SF 2 . 15 X 2 . 15 M. SLIDING FOLDING GLAZED DOOR
BATH D1 19.27 SMT. 19.27 SMT. 3.40 X
CARPET 1.20 1.20 V V 1.20
1.50X1.20 0.95X0.75 LIVING ROOM AREA D1 D1 D1
FIRST, SECOND & RAIZED SECOND D 1 . 20 X 2 . 15 M. TW. PANELLED DOOR
D1 2.75 X 3.35 19.27 SMT.
BATH LIVING ROOM BATH BATH LIVING ROOM D KITCHEN
0.95X 0.95X 0.95X W FLOOR AREA CALCULATION D1 0 . 90 X 2 . 15 M. TW. PANELLED DOOR
1.20 1.50X1.20 2.75 X 3.35 1.50X1.20 1.50X1.20D1 2.75 X 3.35 9 2.60 X 2.30
LIVING ROOM D1 1.20 D1 1.20
SF CARPET AREA IN MTS. SQ. MTS. D2 0 . 75 X 2 . 00 M. TW. FLUSHED DOOR
KITCHEN 2.75 X 3.35 AREA
2.60 X 2.30 SF SF 18.84 SMT. A 28 . 70 X 15 . 25 M. 437 . 67
BAL. 0.90 M. WIDE W 1 . 20 X 0 . 95 M. ALU. GLAZED WINDOW
KITCHEN KITCHEN KITCHEN BATH
SF LIVING ROOM 1.50X1.20 V DEDUCTION
2.60 X 2.30 BAL. 0.90 M. WIDE
2.60 X 2.30 2.60 X 2.30 BAL. 0.90 M. WIDE W1 1 . 20 X 1 . 20 M. ALU. GLAZED WINDOW
BL10 2 . 60 M. 2.75 X 3.35 1 5 . 90 X 2 . 95 X 1 NO. 17 . 40
W BAL. 0.90 M. WIDE D1 V 0 . 60 X 0 . 95 M. ALU. LOUVERED VENTILATOR
BL8 2 . 60 M. BL7 2 . 65 M. 0.75X W. C.
V 2 2 . 60 X 5 . 10 X 1 NO. 13 . 26
SF 0.90D11.2X0.90
BL9 2 . 90 M. W W W
3 2 . 65 X 4 . 65 X 1 NO. 12 . 32
BAL. 0.90 M. WIDE 4 2 . 60 X 4 . 65 X 1 NO. 12 . 09 DRAWING SHOWING PROPOSED RESIDENTIAL
KITCHEN
5 3 . 05 X 3 . 85 X 1 NO. 11 . 74
BL6 2 . 90 M.
2.60 X 2.30 & COMMORCIAL BUILDING "E" IN PLOT NO.
A 6 2 . 90 X 3 . 95 X 1 NO. 11 . 45
7 3 . 05 X 2 . 95 X 1 NO. 8 . 99 19, 20 & 21 OF THE LAY - OUT BEARING S. NO.
W
8 2 . 60 X 2 . 85 X 1 NO. 7 . 41
28 . 70 M.
9 2 . 90 X 2 . 45 X 1 NO. 7 . 10 68/ 25/ 26/ 27 OF VILLAGE - MANPHOD
10 1 . 45 X 1 . 20 X 4 NO. 6 . 96
TALUKA DAHANU DIST. PALGHAR FOR.__
11 3 . 20 X 1 . 65 X 1 NO. 5 . 28

FIRST, SECOND & RAIZED SECOND FLOOR PLAN


12 3 . 05 X 1 . 60 X 1 NO. 4 . 88 MR. IQBAL H. DHANANI
13 2 . 90 X 1 . 65 X 1 NO. 4 . 78
SCALE.____ 1 : 100 14 1 . 30 X 3 . 40 X 1 NO. 4 . 42 MRS. ROSHAN I. DHANANI
15 2 . 60 X 1 . 65 X 1 NO. 4 . 29
16 2 . 30 X 1 . 70 X 1 NO. 3 . 91 MR. ASIF I. DHANANI
PROPOSED BALCONY AREA STATEMENT
CARPET AREA IN FIRST, SECOND & RAIZED
FOR FIRST, SECOND & RAIZED SECOND
17
18
3 . 15 X 1 . 20 X 1 NO.
1 . 65 X 1 . 60 X 1 NO.
3 . 78
2 . 64
MR. ZUBER I. DHANANI
SECOND FLOOR FLATS FLOOR ( FREE OF F. S. I. ) 19 2 . 90 X 0 . 45 X 1 NO. 1 . 30
* CARPET AREA IN FLAT NO. 1 = 19 . 27 SQ. MTS. OWNER'S SIGNATURE JOB NO._ 844 / 2019
BL1 = 0 . 90 X 2 . 60 = 2 . 34 SQ. MTS. 20 1 . 05 X 1 . 15 X 1 NO. 1 . 20
* CARPET AREA IN FLAT NO. 2 = 19 . 27 SQ. MTS. BL2 = 0 . 90 X 2 . 90 = 2 . 61 SQ. MTS. 21 0 . 30 X 3 . 50 X 1 NO. 1 . 05 DRAWING NO.- E/02 /02
* CARPET AREA IN FLAT NO. 3 = 18 . 84 SQ. MTS. BL3 = 0 . 90 X 2 . 60 = 2 . 34 SQ. MTS. 22 0 . 45 X 1 . 05 X 1 NO. 0 . 47 BUILDING PLAN
* CARPET AREA IN FLAT NO. 4 = 18 . 84 SQ. MTS. BL4 = 0 . 90 X 3 . 10 = 2 . 79 SQ. MTS. TOTAL DEDUCTION 146 . 72 DATE :- 19 - 09 - 2019
BL5 = 0 . 90 X 2 . 90 = 2 . 61 SQ. MTS. NET FLOOR AREA 290 . 95
* CARPET AREA IN FLAT NO. 5 = 19 . 27 SQ. MTS.
* CARPET AREA IN FLAT NO. 6 = 19 . 27 SQ. MTS.
BL6
BL7
=
=
0 . 90 X 2 . 90
0 . 90 X 2 . 65
=
=
2 . 61 SQ. MTS.
2 . 38 SQ. MTS.
MAKARAND KARANDIKAR
* CARPET AREA IN FLAT NO. 7 = 19 . 27 SQ. MTS. BL8 = 0 . 90 X 2 . 60 = 2 . 34 SQ. MTS. A R C H I T E C T.
* CARPET AREA IN FLAT NO. 8 = 20 . 61 SQ. MTS. BL9 = 0 . 90 X 2 . 90 = 2 . 61 SQ. MTS. 'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
* CARPET AREA IN FLAT NO. 9 = 18 . 84 SQ. MTS. BL10 = 0 . 90 X 2 . 60 = 2 . 34 SQ. MTS.
DAHANU ROAD DIST. PALGHAR PIN._ 401 602
* CARPET AREA IN FLAT NO. 10 = 19 . 27 SQ. MTS. 0 . 90 X 27 . 75 RMT. = 24 . 97 SQ. MTS.

TOTAL CARPET AREA / FLOOR = 192 . 75 SQ. MTS. TOTAL= 24 . 97 X 3 FLOORS = 74 . 91 SQ. MTS.
16 . 30 M. 16 . 30 M.
4.10 M. 1.0 3.05 M. 3.05 M. 1.0 4.10 M.
17

3.05 M.

3.05 M.
16 . 30 M. 1.0X1.65 16 16 1.0X1.65
4.10 M. 1.0 3.05 M. 3.05 M. 1.0
3.05X1.05
4.10 M.
1.55X2.85
15

3.05 M.

2 . 85 3.05 M.
1.0X1.65 14 14 1.0X1.65
3.05X1.05 1.45X1.85

2.85
9

5 . 85 M.
1.50X2.85
19
1.45X1.85
11 13 1.50X5.85

5 . 85 M.
16
3 1.50X5.85 1.90X3.65 1.35X1.15

6 . 10 M.
1.90X3.65 1.35X1.15
1.65X1.15 22 24

6 . 10 M.

3.10 M. 2.95 M. 3.05 M. 2.85 M. 3.05 M. 3.05 M. 2.85 M.2.85 M.2.75 M.


1.65X1.15 20 22 14

2.85 M.2.85 M.2.75 M.


9 15 1.35X2.75
13 1.35X2.75 25 21
24 19
1.90X1.05
0.90X1.15 1.45X1.45
0.90X1.15
1.90X2.30 23

2.30
21 1.45X1.45
STILT FOR PARKING 12 10

3.05 M. 2.30
29 . 35 M.

29 . 35 M.
7 10 1.65X1.05
3.75X2.85
1.65X1.05 3.75X2.85
DUCT A

3.05 M.
1.45X1.85 5 8
5.25X2.85 5.25X2.85 1.55X5.85
1.20X1.15 1.20X1.15

3.05 M.

38 . 90 M.

38 . 90 M.
23
6 18

5.85 M.
3.90X3.05 11

5.85 M.
1.50X5.85 3 3.90X3.05 A
2
4
7
5.65X3.05
DUCT 1.30X1.65
1.65X1.15 1.35X1.15 6
20
DUCT
7.10X2.85

1.20X1.15 SCHEDULE OF OPENINGS

11 . 30 M.
1.90 X 3.65 5
STILT FOR PARKING 18

2.85 M. 3.05 M.
6.85X3.05

0.90X CARPET AREA IN GROUND FLOOR SHOPS & OFFICES 5.65X3.05 RS. 2 . 45 X 2 . 45 M. M.S. ROLLING SHUTTER

3 . 05 M. 3 . 10 M.
1.30X1.65 4
1.15 DUCT 2 7.25X2.95
1.45X1.45 * CARPET AREA IN SHOP NO. 1 7.10X2.85 18
SF 2 . 15 X 2 . 15 M. SLIDING FOLDING GLAZED DOOR
1.65X1.05

2.45X3.05

3.05 M.
1.45X2.75
3
3 . 05 X 4 . 20 = 12 . 81 ) 1 12 8

UP = 17 . 75 X 1 = 17 . 75 SQ. MTS.
6.85X3.05 1.45X1.65 17 8.30X3.10
D 1 . 20 X 2 . 15 M. TW. PANELLED DOOR
2 . 75 M.

2 . 30 M.

4.40 M.
6 . 85 M. 4.10 M. 1.45 1.45 2.45 M.
2 . 15 X 2 . 30 = 4 . 94 )

3.50 M.
WING - A 26
16 . 30 M. 1
9.85X3.50
2.95X4.40 D1 0 . 90 X 2 . 15 M. TW. PANELLED DOOR
* CARPET AREA IN OFFICE NO. 1 RAIZED SECOND FLOOR AREA PLAN
SCALE.____ 1: 200 9 . 85 M. 3.50 M. 2.95 M. D2 0 . 75 X 2 . 00 M. TW. FLUSHED DOOR
3 . 35 X 2 . 75 = 9 . 21 ) 16 . 30 M.
3 . 65 M. = 12 . 51 X 1 = 12 . 51 SQ. MTS. RAIZED SECOND FLOOR W 1 . 20 X 0 . 95 M. ALU. GLAZED WINDOW
DUCT
1 . 20 X 2 . 75 = 3 . 30 ) FIRST & SECOND FLOOR AREA PLAN
1.45X1.45 AREA CALCULATION
* CARPET AREA IN OFFICE NO. 2
SCALE.____ 1: 200 W1 1 . 20 X 1 . 20 M. ALU. GLAZED WINDOW
AREA IN MTS. SQ. MTS.
3 . 65 X 2 . 90 = 10 . 58 ) A 16 . 30 X 29 . 36 M. 478 . 40 FIRST & SECOND FLOOR V 0 . 60 X 0 . 95 M. ALU. LOUVERED VENTILATOR
= 20 . 02 X 1 = 20 . 02 SQ. MTS.
2 . 30 X 2 . 75 = 6 . 32 ) DEDUCTION AREA CALCULATION
DUCT 1 6 . 85 X 3 . 05 X 1 NO. 20 . 89
1.20 X 1 . 20 X 2 . 60 = 3 . 12 ) AREA IN MTS. SQ. MTS.
2 7 . 10 X 2 . 85 X 1 NO. 20 . 23
1.15
DRAWING SHOWING PROPOSED RESIDENTIAL
38 . 90 M.

3 1 . 50 X 5 . 85 X 2 NO. 17 . 55 A 16 . 30 X 38 . 90 M. 634 . 07
* CARPET AREA IN COMMON TOILET
4 5 . 65 X 3 . 05 X 1 NO. 17 . 23
1 . 35 X 3 . 00 = 4 . 05 ) = 4 . 05 X 1 = 4 . 05 SQ. MTS. DEDUCTION
5 5 . 25 X 2 . 85 X 1 NO. 14 . 96
1 9 . 85 X 3 . 50 X 1 NO. 34 . 47
& COMMORCIAL BUILDING "E" IN PLOT NO.
6 3 . 90 X 3 . 05 X 1 NO. 11 . 89
TOTAL CARPET AREA = 54 . 33 SQ. MTS. 7 3 . 75 X 2 . 85 X 1 NO. 10 . 68 2 1 . 55 X 5 . 85 X 1 NO. 9 . 06
8 2 . 45 X 3 . 05 X 1 NO. 7 . 47
3 8 . 30 X 3 . 10 X 1 NO. 25 . 73
19, 20 & 21 OF THE LAY - OUT BEARING S. NO.
STILT FOR PARKING 9 1 . 90 X 3 . 65 X 1 NO. 6 . 93
4 7 . 25 X 2 . 95 X 1 NO. 21 . 38
A A 10 1 . 90 X 2 . 30 X 1 NO. 4 . 37
11
12
1 . 50 X
1 . 45 X
2 . 85 X 1 NO.
2 . 75 X 1 NO.
4 . 27
3 . 98
5
6
6 . 85 X
7 . 10 X
3 . 05 X 1 NO.
2 . 85 X 1 NO.
20 . 89
20 . 23
68/ 25/ 26/ 27 OF VILLAGE - MANPHOD
13 1 . 35 X 2 . 75 X 1 NO. 3 . 71 7 5 . 65 X 3 . 05 X 1 NO. 17 . 23
14 1 . 00 X 1 . 65 X 2 NO. 3 . 30 8 5 . 25 X 2 . 85 X 1 NO. 14 . 96 TALUKA DAHANU DIST. PALGHAR FOR.__
15 3 . 05 X 1 . 05 X 1 NO. 3 . 20
9 1 . 55 X 2 . 85 X 1 NO. 4 . 41
DUCT
1.30X
16
17
1 . 45 X
1 . 45 X
1 . 85 X 1 NO.
1 . 65 X 1 NO.
2 . 68
2 . 39
10
11
1 . 90 X
3 . 90 X
2 . 30 X 1 NO.
3 . 05 X 1 NO.
4 . 37
11 . 89
MR. IQBAL H. DHANANI
1.65 18 1 . 30 X 1 . 65 X 1 NO. 2 . 14

TOILET
19
20
1 . 45 X
1 . 65 X
1 . 45 X 1 NO.
1 . 15 X 1 NO.
2 . 10
1 . 89
12
13
3 . 75 X
1 . 50 X
2 . 85 X 1 NO.
5 . 85 X 1 NO.
10 . 68
8 . 77
MRS. ROSHAN I. DHANANI
21 1 . 65 X 1 . 05 X 1 NO. 1 . 73
1.20X 2.30 X 2.75 W1 14 1 . 90 X 3 . 65 X 1 NO. 6 . 93
DUCT
1.20 X
1.15
V1
2.60
D1
22
23
1 . 35 X
1 . 20 X
1 . 15 X 1 NO.
1 . 15 X 1 NO.
1 . 55
1 . 38
15
16
1 . 35 X
1 . 00 X
2 . 75 X 1 NO.
1 . 65 X 2 NO.
3 . 71
3 . 30
MR. ASIF I. DHANANI
24 0 . 90 X 1 . 15 X 1 NO. 1 . 03
V1
W1
TOTAL
NET FLOOR
DEDUCTION
AREA
167 . 55
310 . 85
17
18
3 . 05 X
1 . 20 X
1 . 05 X 1 NO.
1 . 15 X 2 NO.
3 . 20
2 . 76
MR. ZUBER I. DHANANI
OFFICE NO. 1 TOILET OFFICE NO. 2 19 1 . 45 X 1 . 85 X 1 NO. 2 . 68
1.20X
RS.
RS. 3.35 X 2.75 3.65 X 2.90
2.75 20 1 . 30 X 1 . 65 X 1 NO. 2 . 14
OWNER'S SIGNATURE JOB NO._ 844 / 2019
21 1 . 45 X 1 . 45 X 1 NO. 2 . 10
D1
22 1 . 65 X 1 . 15 X 1 NO. 1 . 89
DRAWING NO.- E/02 /02
23 1 . 65 X 1 . 05 X 1 NO. 1 . 73
2 . 15 M.

V1 COMM.
TOILET 2.15 X 2.30
WING - B 24 1 . 35 X 1 . 15 X 1 NO. 1 . 55 BUILDING PLAN
C 1.35 X UP C 25 0 . 90 X 1 . 15 X 1 NO. 1 . 03
3.00 26 2 . 95 X 4 . 40 X 1 NO. 12 . 98 DATE :- 19 - 09 - 2019
D1 TOTAL DEDUCTION 250 . 07
NET FLOOR AREA 384 . 00 MAKARAND KARANDIKAR
SHOP NO. 1
3.05 X 4.20 A R C H I T E C T.
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
RS. DAHANU ROAD DIST. PALGHAR PIN._ 401 602

STILT CUM GROUND FLOOR PLAN


SCALE.____ 1 : 100
16 . 30 M.

BL1 3 . 05 M. W

BATH BAL. 0.90 M. WIDE BATH


1.20X 1.20X
1.50 V KITCHEN V 1.50
W KITCHEN V SF
2.60 X 2.30 V KITCHEN W
2.30 X 2.60 D1 D1 2.30 X 2.60
1.05X D1 W. C. W. C. D1 1.05X
0.95 1.2X0.95 1.2X0.95 0.95
LIVING ROOM 0.95XD1
BATH
BAL. 0.90 M. WIDE

BAL. 0.90 M. WIDE


2.90 X 3.35 1.05 1.50X1.20

BL2 2 . 80 M.
D1
LIVING ROOM W. C. V LIVING ROOM
SF 3 0.95X SF
3.35 X 2.90 V DUCT 3.35 X 2.90
1.20
1.45X1.85
6 . 10 M.

2 D D
4
LOBBY
D
BAL. 0.90 M. WIDE

BAL. 0.90 M. WIDE


1 D 2.90 X 2.75 D 5

BL3 3 . 25 M.
PASS. 1.50 M. WIDE
LIVING ROOM
SF 3.35 X 2.90
LIVING ROOM
3.35 X 2.90
SF PROPOSED BALCONY AREA STATEMENT LIGHTING & VENTILATION SCHEDULE
BL11

DUCT
1.65X1.15 1.35X1.15 FOR RAIZED SECOND FLOOR FOR BUILDING
DUCT
1.05X D1 W. C. 1.90 X 3.65
0.95 1.2X0.95 V
W. C. D1 1.05X
1.2X0.95 0.95
FREE OF F. S. I. ( WING - B ) FLAT NO. 11 SCHEDULE OF OPENINGS
KITCHEN D1 D1 KITCHEN
W 2.60 X 2.30 V W
BL1 = 0 . 90 X 3 . 05 = 2 . 74 SQ. MTS. TYPE OF AREA OPENING OPENING WINDOW AREA RS. 2 . 45 X 2 . 45 M. M.S. ROLLING SHUTTER
BATH 0.90X BATH 2.30 X 2.60 NOS.
1.50X1.20 V 1.15 DUCT V ROOM L B REQUIRED ( 1/6 ) PROVIDED TYPE L B
1.20X BL2 = 0 . 90 X 2 . 80 = 2 . 52 SQ. MTS. SF 2 . 15 X 2 . 15 M. SLIDING FOLDING GLAZED DOOR
PASSAGE 1.50 M. WIDE

1.45X1.45 1.50
1.65X1.05

LIVING 3 . 65 M. 2 . 90 M. SLIDING 2 . 15 M. 2 . 15 M.
BATH BL3 = 0 . 90 X 3 . 25 = 2 . 92 SQ. MTS. 1 . 76 SQ. MTS.
1.20X UP ROOM
FOLDING SF. 1 D 1 . 20 X 2 . 15 M. TW. PANELLED DOOR
10 . 58 SQ. MTS. 4 . 62 SQ. MTS.
2 . 30 M.

KITCHEN V GLAZED DOOR


1.50
V BL4 = 0 . 90 X 5 . 85 = 5 . 26 SQ. MTS.
W
2.30 X 2.60 D1
WING - A
ALU.
D1 0 . 90 X 2 . 15 M. TW. PANELLED DOOR
2 . 60 M. 2 . 30 M. 1 . 20 M. 0 . 95 M.
1.05X W. C. DN BL5 = 0 . 90 X 3 . 05 = 2 . 74 SQ. MTS. KITCHEN 0 . 99 SQ. MTS. GLAZED W 1
0.95 D11.2X0.95
5 . 98 SQ. MTS. 1 . 14 SQ. MTS. D2 0 . 75 X 2 . 00 M. TW. FLUSHED DOOR
WINDOW
BL6 = 0 . 90 X 3 . 05 = 2 . 74 SQ. MTS.
BAL. 0.90 M. WIDE

6 D W 1 . 20 X 0 . 95 M. ALU. GLAZED WINDOW


2 . 80 M.

DUCT BATH 1 . 20 M. 2 . 35 M. ALU. 0 . 60 M. 0 . 95 M.


1.45X1.45 1.20X BL7 = 0 . 90 X 2 . 80 = 2 . 52 SQ. MTS. TOILET 0 . 47 SQ. MTS. LOUVERED V 1
LIVING ROOM V KITCHEN
V 1.50
2.30 X 2.60 W 2 . 82 SQ. MTS. VENTILATOR 0 . 54 SQ. MTS. W1 1 . 20 X 1 . 20 M. ALU. GLAZED WINDOW
SF 3.35 X 2.90 D1 BL8 = 0 . 90 X 6 . 10 = 5 . 49 SQ. MTS.
W. C. D1 1.05X V 0 . 60 X 0 . 95 M. ALU. LOUVERED VENTILATOR
BL10

1.2X0.95 0.95
7 . 20 X 29 . 95 RMT. = 26 . 93 SQ. MTS. LIGHTING & VENTILATION SCHEDULE
BAL. 0.90 M. WIDE

D 7
BATH DUCT
1.20 X TOTAL= 26 . 93 X 1 FLOORS = 26 . 93 SQ. MTS. FOR BUILDING
PASSAGE 1.50 M. WIDE

1.20X
W
KITCHEN 1.50 V 1.15
V
LIVING ROOM
3.35 X 2.90
SF FLAT NO. 12 DRAWING SHOWING PROPOSED RESIDENTIAL
2.30 X 2.60 D1
5 . 85 M.

W. C.
1.05X
0.95 D11.2X0.95
TYPE OF AREA OPENING OPENING WINDOW
NOS.
AREA & COMMORCIAL BUILDING "E" IN PLOT NO.
ROOM L B REQUIRED ( 1/6 ) PROVIDED TYPE L B
BAL. 0.90 M. WIDE

BAL. 0.90 M. WIDE

8 D D 9
LIVING 3 . 05 M. 3 . 35 M. 19, 20 & 21 OF THE LAY - OUT BEARING S. NO.
BL9 3 . 05 M.

LIVING ROOM LIVING ROOM 1 . 70 SQ. MTS. 2 . 15 M. 2 . 15 M.


SF 3.35 X 2.90 SF ROOM 10 . 21 SQ. MTS. SLIDING SF. 1
A 3.35 X 2.90 A
CARPET AREA IN RAIZED SECOND
FOLDING
68/ 25/ 26/ 27 OF VILLAGE - MANPHOD
BL4

1 . 15 M. 0. 90 M. GLAZED DOOR 4 . 62 SQ. MTS.


D 0 . 17 SQ. MTS.
10 FLOOR FLATS ( WING - A ) 1 . 03 SQ. MTS.
W. C. D1 1.05X TALUKA DAHANU DIST. PALGHAR FOR.__
BAL. 0.90 M. WIDE

1.2X0.95 0.95 * CARPET AREA IN FLAT NO. 1 = 19 . 62 SQ. MTS.


BL8 3 . 05 M.

D1 2 . 60 M. 2 . 30 M. ALU. 1 . 50 M. 0 . 95 M.
LIVING ROOM KITCHEN W KITCHEN 0 . 99 SQ. MTS. W 1
SF 3.35 X 2.90
DUCT
V

1.30X
V BATH
1.20X
2.30 X 2.60 * CARPET AREA IN FLAT NO. 2 = 19 . 62 SQ. MTS. 5 . 98 SQ. MTS.
GLAZED
WINDOW 1 . 42 SQ. MTS. MR. IQBAL H. DHANANI
1.65 V
1.80 * CARPET AREA IN FLAT NO. 3 = 19 . 62 SQ. MTS. BED 3 . 35 M. 2 . 75 M. SLIDING 2 . 15 M. 2 . 15 M.

1.30X D1 W. C.
* CARPET AREA IN FLAT NO. 4 = 19 . 62 SQ. MTS. ROOM 9 . 21 SQ. MTS.
1 . 53 SQ. MTS. FOLDING
GLAZED DOOR
SF. 1
4 . 62 SQ. MTS. MRS. ROSHAN I. DHANANI
0.95 1.2X0.95 TOILET
D1 KITCHEN * CARPET AREA IN FLAT NO. 5 = 19 . 62 SQ. MTS.
W
KITCHEN
2.30 X 2.60 BATH
1.20X
DUCT
V
V1.20 X
1.20X
2.35 2.30 X 2.60
W
* CARPET AREA IN FLAT NO. 6 = 19 . 62 SQ. MTS.
BATH
1 . 20 M. 2 . 15 M.
2 . 58 SQ. MTS.
0 . 43 SQ. MTS.
ALU.
LOUVERED V 1
0 . 60 M. 0 . 95 M.
0 . 54 SQ. MTS.
MR. ASIF I. DHANANI
1.15 V D1 VENTILATOR
1.50
V * CARPET AREA IN FLAT NO. 7 = 19 . 62 SQ. MTS.
1 . 20 M. 0 . 90 M. ALU. 0 . 60 M. 0 . 95 M. MR. ZUBER I. DHANANI
BAL. 0.90 M. WIDE

W. C. 0 . 18 SQ. MTS. V 1
BAL. 0.90 M. WIDE

LOUVERED
3 . 05 M.

* CARPET AREA IN FLAT NO. 8 = 19 . 62 SQ. MTS.


BL7 3 . 20 M.

BATH 1 . 08 SQ. MTS. VENTILATOR 0 . 54 SQ. MTS.


1.20X LIVING ROOM
BED ROOM SF * CARPET AREA IN FLAT NO. 9 = 19 . 98 SQ. MTS.
SF 3.35 X 2.75 2.15 3.65 X 2.90
OWNER'S SIGNATURE JOB NO._ 844 / 2019
D1 * CARPET AREA IN FLAT NO. 10 = 20 . 13 SQ. MTS.
BL5

D2
1.20X0.45 11 DRAWING NO.- E/02 /02
W. C. D
UP
TOTAL CARPET AREA / FLOOR = 197 . 07 SQ. MTS.
2 . 15 M.

V 1.2X0.90 D11.85X0.90
LOBBY WING - B BUILDING PLAN
2.20 X 2.15
C DN C DATE :- 19 - 09 - 2019
KITCHEN D
W 3.20 X 1.90 12
1.15X
0.90
MAKARAND KARANDIKAR
LIVING ROOM A R C H I T E C T.
3.05 X 3.35
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
SF DAHANU ROAD DIST. PALGHAR PIN._ 401 602
BALC. 0.90 M. WIDE

BL6 3 . 50 M.

FIRST & SECOND FLOOR PLAN


SCALE.____ 1 : 100
16 . 30 M.

BL1 3 . 05 M. W

BATH BAL. 0.90 M. WIDE BATH


1.20X 1.20X
1.50 V KITCHEN V 1.50
W KITCHEN V SF
2.60 X 2.30 V KITCHEN W
2.30 X 2.60 D1 D1 2.30 X 2.60
1.05X D1 W. C. W. C. D1 1.05X
0.95 1.2X0.95 1.2X0.95 0.95
LIVING ROOM 0.95XD1
BATH LIGHTING & VENTILATION SCHEDULE

BAL. 0.90 M. WIDE


BAL. 0.90 M. WIDE

2.90 X 3.35 1.05 1.50X1.20

BL2 2 . 80 M.
D1
LIVING ROOM W. C. V LIVING ROOM
SF
FOR BUILDING
SF 3.35 X 2.90 3 0.95X 3.35 X 2.90
1.20 V DUCT
1.45X1.85
FLAT NO. 1 TO 8
6 . 10 M.

2 D D
4
LOBBY TYPE OF AREA OPENING OPENING WINDOW AREA
D NOS.

BAL. 0.90 M. WIDE


BAL. 0.90 M. WIDE

1 D 2.90 X 2.75 D 5 ROOM L B REQUIRED ( 1/6 ) PROVIDED TYPE L B

BL3 3 . 25 M.
PASS. 1.50 M. WIDE
LIVING ROOM LIVING ROOM SLIDING 2 . 15 M. 2 . 15 M.
SF LIVING 3 . 35 M. 2 . 90 M.
SF 3.35 X 2.90 3.35 X 2.90 PROPOSED BALCONY AREA STATEMENT 1 . 61 SQ. MTS. FOLDING SF. 1
DUCT ROOM 9 . 71 SQ. MTS. 4 . 62 SQ. MTS.
BL8

1.65X1.15 GLAZED DOOR


DUCT
1.35X1.15
FOR FIRST FLOOR & SECOND FLOOR ALU.
2 . 60 M. 2 . 30 M. 1 . 20 M. 0 . 95 M.
1.05X D1 W. C. 1.90 X 3.65 W. C. D1 1.05X KITCHEN 0 . 99 SQ. MTS. GLAZED

W
KITCHEN
0.95
D1
1.2X0.95 V 1.2X0.95 0.95

V
D1 KITCHEN
FREE OF F. S. I. ( WING - A & B ) 5 . 98 SQ. MTS. WINDOW
W 1
1 . 14 SQ. MTS. SCHEDULE OF OPENINGS
2.60 X 2.30 W
BATH 0.90X BATH 2.30 X 2.60 BL1 = 0 . 90 X 3 . 05 = 2 . 74 SQ. MTS. 1 . 50 M. 1 . 20 M. ALU. 0 . 60 M. 0 . 95 M.
1.50X1.20 V 1.15 DUCT V 1.20X BATH 0 . 30 SQ. MTS. LOUVERED V 1 RS. 2 . 45 X 2 . 45 M. M.S. ROLLING SHUTTER
PASSAGE 1.50 M. WIDE

1.45X1.45 1.50 BL2 = 0 . 90 X 2 . 80 = 2 . 52 SQ. MTS.


1.65X1.05

1 . 80 SQ. MTS. VENTILATOR 0 . 54 SQ. MTS.


BATH SF 2 . 15 X 2 . 15 M. SLIDING FOLDING GLAZED DOOR
BL3 = 0 . 90 X 3 . 25 = 2 . 92 SQ. MTS. 0 . 95 M. 1 . 20 M. ALU. 0 . 60 M. 0 . 95 M.
1.20X UP W. C.
2 . 30 M.

KITCHEN V 0 . 19 SQ. MTS. LOUVERED V 1


W
1.50
V WING - A 1 . 14 SQ. MTS. 0 . 54 SQ. MTS. D 1 . 20 X 2 . 15 M. TW. PANELLED DOOR
2.30 X 2.60 D1 BL4 = 0 . 90 X 5 . 85 = 5 . 26 SQ. MTS. VENTILATOR
1.05X W. C. DN D1 0 . 90 X 2 . 15 M. TW. PANELLED DOOR
0.95 D11.2X0.95 BL5 = 0 . 90 X 3 . 05 = 2 . 74 SQ. MTS. LIGHTING & VENTILATION SCHEDULE
D2 0 . 75 X 2 . 00 M. TW. FLUSHED DOOR
BAL. 0.90 M. WIDE

6 D
2 . 80 M.

DUCT BATH BL6 = 0 . 90 X 3 . 50 = 3 . 15 SQ. MTS.


1.45X1.45 1.20X FOR BUILDING
LIVING ROOM V V 1.50 KITCHEN
BL7 = 0 . 90 X 3 . 20 = 2 . 88 SQ. MTS. W 1 . 20 X 0 . 95 M. ALU. GLAZED WINDOW
W
SF 3.35 X 2.90 D1
2.30 X 2.60 FLAT NO. 9
W. C. D1 1.05X BL8 = 0 . 90 X 3 . 05 = 2 . 74 SQ. MTS. W1 1 . 20 X 1 . 20 M. ALU. GLAZED WINDOW
BL7

1.2X0.95 0.95
TYPE OF AREA OPENING OPENING WINDOW AREA
POOJA

NOS. V 0 . 60 X 0 . 95 M. ALU. LOUVERED VENTILATOR


BL9 = 0 . 90 X 3 . 05 = 2 . 74 SQ. MTS.
BAL. 0.90 M. WIDE

D 7 ROOM L B REQUIRED ( 1/6 ) PROVIDED TYPE L B


BATH DUCT
1.20 X
PASSAGE 1.50 M. WIDE

1.20X LIVING ROOM BL10 = 0 . 90 X 2 . 80 = 2 . 52 SQ. MTS. LIVING 3 . 35 M. 2 . 90 M. SLIDING 2 . 15 M. 2 . 15 M.


V 1.15
38 . 90 M.
KITCHEN 1.50 SF
W V 3.35 X 2.90 1 . 61 SQ. MTS. FOLDING SF. 1
2.30 X 2.60 D1 BL11 = 0 . 90 X 6 . 10 = 5 . 49 SQ. MTS. ROOM 9 . 71 SQ. MTS. GLAZED DOOR 4 . 62 SQ. MTS. DRAWING SHOWING PROPOSED RESIDENTIAL
5 . 85 M.

1.05X W. C.
0.95 D11.2X0.95
9 . 90 X 39 . 70 RMT. = 35 . 70 SQ. MTS. KITCHEN
2 . 60 M. 2 . 30 M.
0 . 99 SQ. MTS.
ALU. 1 . 20 M. 0 . 95 M.
& COMMORCIAL BUILDING "E" IN PLOT NO.
GLAZED W 1
BAL. 0.90 M. WIDE

BAL. 0.90 M. WIDE

8 D D 9 5 . 98 SQ. MTS. 1 . 14 SQ. MTS.


TOTAL= 35 . 70 X 2 FLOORS = 71 . 40 SQ. MTS. WINDOW
BL6 3 . 05 M.

SF
LIVING ROOM LIVING ROOM
SF 1 . 80 M. 1 . 20 M. ALU. 0 . 60 M. 0 . 95 M. 19, 20 & 21 OF THE LAY - OUT BEARING S. NO.
A 3.35 X 2.90 3.35 X 2.90 A BATH 0 . 36 SQ. MTS. LOUVERED V 1
2 . 16 SQ. MTS. VENTILATOR 0 . 54 SQ. MTS.
BL4

D
10
W. C. D1 1.05X W. C.
0 . 95 M. 1 . 20 M.
0 . 19 SQ. MTS.
ALU.
LOUVERED V 1
0 . 60 M. 0 . 95 M. 68/ 25/ 26/ 27 OF VILLAGE - MANPHOD
BAL. 0.90 M. WIDE

1.2X0.95 0.95 1 . 14 SQ. MTS. 0 . 54 SQ. MTS.


BL5 3 . 05 M.

LIVING ROOM V
D1
KITCHEN W
VENTILATOR
TALUKA DAHANU DIST. PALGHAR FOR.__
SF 3.35 X 2.90 DUCT
V BATH 2.30 X 2.60 CARPET AREA IN FIRST & SECOND LIGHTING & VENTILATION SCHEDULE
1.30X
1.65V
1.20X
1.80
FLOOR FLATS ( WING - A & B )
FOR BUILDING
MR. IQBAL H. DHANANI
* CARPET AREA IN FLAT NO. 1 = 19 . 62 SQ. MTS.
KITCHEN
1.30X D1 W. C.
0.95
D1
1.2X0.95
* CARPET AREA IN FLAT NO. 2 = 19 . 62 SQ. MTS.
FLAT NO. 10 MRS. ROSHAN I. DHANANI
W V
2.30 X 2.60 BATH DUCT TYPE OF AREA OPENING OPENING WINDOW AREA
1.20X
1.50
V1.20 X
1.15 OPEN
* CARPET AREA IN FLAT NO. 3 = 19 . 62 SQ. MTS.
ROOM L B REQUIRED ( 1/6 ) PROVIDED TYPE
NOS.
L B MR. ASIF I. DHANANI
TERRACE * CARPET AREA IN FLAT NO. 4 = 19 . 62 SQ. MTS.
* CARPET AREA IN FLAT NO. 5 = 19 . 62 SQ. MTS.
LIVING
ROOM
3 . 35 M. 2 . 90 M.
9 . 71 SQ. MTS.
1 . 61 SQ. MTS. SLIDING
2 . 15 M. 2 . 15 M.
4 . 62 SQ. MTS.
MR. ZUBER I. DHANANI
FOLDING SF. 1
* CARPET AREA IN FLAT NO. 6 = 19 . 62 SQ. MTS. GLAZED DOOR
0 . 30 M. 0 . 90 M.
* CARPET AREA IN FLAT NO. 7 = 19 . 62 SQ. MTS.
0 . 27 SQ. MTS.
0 . 04 SQ. MTS. OWNER'S SIGNATURE JOB NO._ 844 / 2019
* CARPET AREA IN FLAT NO. 8 = 19 . 62 SQ. MTS.
D 2 . 60 M. 2 . 30 M. ALU. 1 . 20 M. 0 . 95 M. DRAWING NO.- E/02 /02
2 . 15 M.

OPEN KITCHEN 0 . 99 SQ. MTS.


LOBBY WING - B GLAZED W 1
TERRACE * CARPET AREA IN FLAT NO. 9 = 19 . 98 SQ. MTS. 5 . 98 SQ. MTS. 1 . 14 SQ. MTS.
C
2.20 X 2.15
DN C WINDOW BUILDING PLAN
D * CARPET AREA IN FLAT NO. 10 = 20 . 13 SQ. MTS. 1 . 50 M. 1 . 20 M. ALU. 0 . 60 M. 0 . 95 M.
* CARPET AREA IN FLAT NO. 11 = 19 . 38 SQ. MTS.
BATH 0 . 30 SQ. MTS. LOUVERED V 1 DATE :- 19 - 09 - 2019
1 . 80 SQ. MTS. VENTILATOR 0 . 54 SQ. MTS.
* CARPET AREA IN FLAT NO. 12 = 32 . 40 SQ. MTS.

TOTAL CARPET AREA / FLOOR = 248 . 85 SQ. MTS.


W. C.
0 . 95 M. 1 . 20 M.
1 . 14 SQ. MTS.
0 . 19 SQ. MTS.
ALU.
LOUVERED V 1
0 . 60 M. 0 . 95 M.
0 . 54 SQ. MTS.
MAKARAND KARANDIKAR
VENTILATOR
OPEN
TERRACE
A R C H I T E C T.
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
DAHANU ROAD DIST. PALGHAR PIN._ 401 602

RAIZED SECOND FLOOR PLAN


SCALE.____ 1 : 100
A B

OPEN TERRACE OPEN TERRACE OPEN TERRACE OPEN TERRACE


DUCT LIFT DUCT LIFT
0.60 0.60
X 1.50X1.50 X 1.50X1.50
1.50 1.50

2.00 X 0.45 2.00 X 0.45


W W
D D D D
DUCT DUCT DUCT DUCT
2.60 X 2.20 3.20 X 1.60 3.20 X 1.60 2.60 X 2.20
BALC. 0.90 M. WIDE

BALC. 0.90 M. WIDE


V V V V V V
CARPET 1 D D 2 CARPET V TOILET TOILET V CARPET 3D D 4 CARPET

3 . 50 M.
3 . 50 M.

W AREA AREA BATH 2.45 X 1.20 2.45 X 1.20 BATH AREA AREA W
10 . 20 M.

60.81 SMT. DN UP 58.97 SMT. 2.00 X 0.45 2.00 X 0.45 DN UP


TOILET 1.65X2.30 1.20 X W.C. W.C. 1.20 X 1.65X2.30 58.97 SMT. 60.81 SMT. TOILET
M. BED ROOM D2 1.20 X D2 D2 1.20 X D2
M. BED ROOM
SF
4.10 X 3.05 2.45 LIVING ROOM
3.05 X 4.25
LIVING ROOM
3.05 X 4.25
2.15

D2
1.05X V
1.20 1.50X0.90
D2
V 1.05X
1.50X0.90 1.20
D2
2.15

D2
LIVING ROOM
3.05 X 4.25
LIVING ROOM
3.05 X 4.25
2.45 4.10 X 3.05
SF
SCHEDULE OF OPENINGS
BL1

KITCHEN KITCHEN

BL7
PASSAGE PASSAGE
D1 1.2X0.60 2.75 X 3.05 5.90 X 1.05 D1
M. BED ROOM M. BED ROOM
D1 5.90 X 1.05 2.75 X 3.05 1.2X0.60 D1 RS. 2 . 45 X 2 . 45 M. M.S. ROLLING SHUTTER
D1 PASSAGE D1 3.05 X 3.65 3.05 X 3.65 D1 PASSAGE D1
2.45X1.05 SF 2 . 30 M. SF SF 2 . 30 M. SF 2.45X1.05 SF 2 . 15 X 2 . 15 M. SLIDING FOLDING GLAZED DOOR
BED ROOM 0.95X D1 D1 BED ROOM
D2 KITCHEN BED ROOM SF SF BED ROOM KITCHEN D20.95X D 1 . 20 X 2 . 15 M. TW. PANELLED DOOR
3.05 X 3.35 0.95 BALC. 0.90 M. WIDE BALC. 0.90 M. WIDE BALC. 0.90 M. WIDE BALC. 0.90 M. WIDE 0.95 3.05 X 3.35
D2 BATH STUDY RM. 2.45 X 3.05 3.05 X 3.05 3.05 X 3.05 2.45 X 3.05 STUDY RM. BATH D2
1.20 X 1.20 X
W.C.
0.95X 2.15
2.75 X 2.15 BL2 3 . 20 M. BL3 3 . 20 M. BALC. 0.90 M. WIDE BALC. 0.90 M. WIDE BL5 3 . 20 M. BL6 3 . 20 M. 2.75 X 2.15 2.15
W.C.
0.95X
D1 0 . 90 X 2 . 15 M. TW. PANELLED DOOR
1.20 BL4 6 .15 M. 1.20
D2 0 . 75 X 2 . 00 M. TW. FLUSHED DOOR
W1 V V W1 W2 W1 W1 W2 W1 V V W1
W 1 . 20 X 0 . 95 M. ALU. GLAZED WINDOW
W1 1 . 20 X 1 . 20 M. ALU. GLAZED WINDOW
A B 53 . 50 M.
V 0 . 60 X 0 . 95 M. ALU. LOUVERED VENTILATOR
RAIZED SECOND FLOOR PLAN
SCALE.____ 1: 100
DRAWING SHOWING PROPOSED RESIDENTIAL

RAIZED SECOND FLOOR & COMMORCIAL BUILDING "E" IN PLOT NO.


AREA CALCULATION 19, 20 & 21 OF THE LAY - OUT BEARING S. NO.
AREA IN MTS. SQ. MTS.
68/ 25/ 26/ 27 OF VILLAGE - MANPHOD
A 53 . 50 X 10 . 20 M. 545 . 70
TALUKA DAHANU DIST. PALGHAR FOR.__
DEDUCTION
1 24 . 30 X 3 . 20 X 1 NO. 77 . 76 MR. IQBAL H. DHANANI
CARPET AREA IN RAIZED SECOND FLOOR
2 11 . 85 X 3 . 20 X 2 NO. 75 . 84
MRS. ROSHAN I. DHANANI
53 . 50 M.
3 8 . 70 X 1 . 60 X 2 NO. 27 . 84
* CARPET AREA IN FLAT NO. 1 = 60 . 81 SQ. MTS.
11 . 85 M. 0.602.15 24 . 30 M. 0.602.15 11 . 85 M.
MR. ASIF I. DHANANI
3 . 20 M.

3 . 20 M.
11.85 X 3.20 7 24.30 X 3.20 7 11.85 X 3.20
4 6 . 20 X 1 . 50 X 1 NO. 9 . 30
2 1 2

* CARPET AREA IN FLAT NO. 2 = 58 . 97 SQ. MTS.


0.60X1.50 0.60X1.50

5 2 . 60 X 1 . 20 X 2 NO. 6 . 24 MR. ZUBER I. DHANANI


10 . 20 M.

10 . 20 M.
5 8 6 6 8 5
4 . 70 M.

4 . 70 M.
1.20X0.90 1.20X0.90
2.60X1.20 2.0X1.35 2.0X1.35 2.60X1.20
* CARPET AREA IN FLAT NO. 3 = 58 . 97 SQ. MTS. 6 2 . 00 X 1 . 35 X 2 NO. 5 . 40
OWNER'S SIGNATURE JOB NO._ 844 / 2019
8.70 X 1.60 6.20 X 1.50 8.70 X 1.60
* CARPET AREA IN FLAT NO. 4 = 60 . 81 SQ. MTS.
2.30

2.30
3 3 7 0 . 60 X 1 . 50 X 2 NO. 1 . 80
8 . 85 M. 8.70 M. 6 . 10 M.
4
6 . 20 M. 6 . 10 M. 8.70 M. 8 . 85 M.
DRAWING NO.- E/02 /02
8 1 . 20 X 0 . 90 X 2 NO. 2 . 16
TOTAL CARPET AREA = 239 . 56 SQ. MTS.
53 . 50 M.
BUILDING PLAN
RAIZED SECOND FLOOR AREA PLAN TOTAL DEDUCTION 206 . 34 DATE :- 19 - 09 - 2019
SCALE.____ 1: 200
NET FLOOR AREA 339 . 36
MAKARAND KARANDIKAR
A R C H I T E C T.
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
DAHANU ROAD DIST. PALGHAR PIN._ 401 602
A B
53 . 50 M.

W1 V V W1 W2 W1 W1 W2 W1 V V W1
BL3 6 . 15 M.
W.C. W.C.
0.95X BATH INCLOSE INCLOSE BATH 0.95X
STUDY RM. BL1 3 . 20 M. OPEN BL2 3 . 20 M. BALC. 0.90 M. WIDE BALC. 0.90 M. WIDE BL4 3 . 20 M. OPEN BL5 3 . 20 M. STUDY RM.
1.20 1.20 X 1.20 X 1.20
BED ROOM D2 2.75 X 2.15 INCLOSE TERRACE INCLOSE KITCHEN BED ROOM BED ROOM KITCHEN INCLOSE TERRACE INCLOSE 2.75 X 2.15 D2 BED ROOM
2.15 2.15
3.05 X 3.35 0.95X D2 BALC. 0.90 M. WIDE BALC. 0.90 M. WIDE 2.45 X 3.05 3.05 X 3.05 SF SF 3.05 X 3.05 2.45 X 3.05 BALC. 0.90 M. WIDE BALC. 0.90 M. WIDE D2 0.95X 3.05 X 3.35
0.95 D1 D1 0.95

PASSAGE
SF SF SF SF PASSAGE
D1 2.45X1.05 D1 D1 2.45X1.05 D1
PASSAGE M. BED ROOM M. BED ROOM PASSAGE
D1 1.2X0.60 D1
BALC. 0.90 M. WIDE BALC. 0.90 M. WIDE

BALC. 0.90 M. WIDE BALC. 0.90 M. WIDE


KITCHEN D1 3.05 X 3.65 3.05 X 3.65 D1 KITCHEN 1.2X0.60
DUCT LIFT 5.90 X 1.05 5.90 X 1.05 DUCT LIFT
2.75 X 3.05 LIVING ROOM 0.60 LIVING ROOM D2 D2 D2 D2 LIVING ROOM 0.60 LIVING ROOM 2.75 X 3.05
X 1.50X1.50 X 1.50X1.50
3.05 X 4.25 3.05 X 4.25 W.C. 1.50X0.90 1.50X0.90 W.C. 3.05 X 4.25 3.05 X 4.25
INCLOSE

INCLOSE
1.50 1.50
SF M. BED ROOM 1.05X V V 1.05X M. BED ROOM SF
D2 TOILET BATH D2 D2 BATH TOILET D2
4.10 X 3.05 CARPET CARPET 1.65X2.30 1.20 X 1.20 1.20 1.20 X
1.65X2.30 CARPET CARPET 4.10 X 3.05
1.20 X 2.00 X 0.45 2.00 X 0.50 1.20 X
6 . 75 M.

6 . 75 M.
W AREA AREA TOILET TOILET AREA AREA W
13 . 80 M.

2.15 2.15
2.45
V 60.81 SMT. 2 D LOBBY
D 3 58.97 SMT. V 2.45 X 1.20 2.45 X 1.20 V 58.97 SMT. 6 D LOBBY
D 7 60.81 SMT.
V
2.45
DUCT V DUCT V V DUCT V DUCT
2.30 X 2.95 2.30 X 2.95
2.60 X 2.20 3.20 X 1.60 3.20 X 1.60 2.60 X 2.20

13 . 80 M.
V V V V V V
CARPET 1 D D 4 CARPET V TOILET TOILET V CARPET 5D D 8 CARPET
W AREA AREA BATH 2.00 X 0.45 2.45 X 1.20 2.45 X 1.20 2.00 X 0.50
BATH AREA AREA W
60.81 SMT. DN UP 58.97 SMT. 58.97 SMT. DN UP 60.81 SMT.
TOILET 1.65X2.30 1.20 X W.C. W.C. 1.20 X 1.65X2.30 TOILET
INCLOSE

INCLOSE
M. BED ROOM D2 1.20 X 2.15 D2 D2 2.15 1.20 X D2
M. BED ROOM
SF 1.05X V V 1.05X SF
4.10 X 3.05 LIVING ROOM LIVING ROOM LIVING ROOM LIVING ROOM 4.10 X 3.05
SCHEDULE OF OPENINGS
BL12

2.45 1.20 1.50X0.90 1.50X0.90 1.20 2.45

BL6
3.05 X 4.25 3.05 X 4.25 D2 D2 D2 D2 3.05 X 4.25 3.05 X 4.25
KITCHEN PASSAGE PASSAGE KITCHEN
D1 1.2X0.60 2.75 X 3.05 5.90 X 1.05 D1 D1 5.90 X 1.05 2.75 X 3.05 1.2X0.60 D1
M. BED ROOM M. BED ROOM
D1 PASSAGE D1 3.05 X 3.65 3.05 X 3.65 D1 PASSAGE D1 RS. 2 . 45 X 2 . 45 M. M.S. ROLLING SHUTTER
2.45X1.05 SF 2 . 30 M. SF SF 2 . 30 M. SF 2.45X1.05
BED ROOM 0.95X D1 D1 BED ROOM SF 2 . 15 X 2 . 15 M. SLIDING FOLDING GLAZED DOOR
D2 INCLOSE INCLOSE KITCHEN BED ROOM SF SF BED ROOM KITCHEN INCLOSE INCLOSE D20.95X
3.05 X 3.35 0.95
BALC. 0.90 M. WIDE BALC. 0.90 M. WIDE BALC. 0.90 M. WIDE BALC. 0.90 M. WIDE 0.95 3.05 X 3.35
D2 BATH STUDY RM. 2.45 X 3.05 3.05 X 3.05 3.05 X 3.05 2.45 X 3.05 STUDY RM. BATH D2
W.C. 1.20 X BL11 3 . 20 M. BL10 3 . 20 M.
INCLOSE INCLOSE
BL8 3 . 20 M. BL7 1.20 X W.C.
D 1 . 20 X 2 . 15 M. TW. PANELLED DOOR
2.15
2.75 X 2.15 BALC. 0.90 M. WIDE BALC. 0.90 M. WIDE 3 . 20 M. 2.75 X 2.15 2.15
0.95X 0.95X
1.20 BL9 6 . 15 M. 1.20 D1 0 . 90 X 2 . 15 M. TW. PANELLED DOOR
W1 V V W1 W2 W1 W1 W2 W1 V V W1
D2 0 . 75 X 2 . 00 M. TW. FLUSHED DOOR
A B
53 . 50 M.
W 1 . 20 X 0 . 95 M. ALU. GLAZED WINDOW
W1 1 . 20 X 1 . 20 M. ALU. GLAZED WINDOW
FIRST & SECOND FLOOR PLAN V 0 . 60 X 0 . 95 M. ALU. LOUVERED VENTILATOR
SCALE.____ 1: 100

FIRST & SECOND FLOOR DRAWING SHOWING PROPOSED RESIDENTIAL


AREA CALCULATION & COMMORCIAL BUILDING "E" IN PLOT NO.
AREA IN MTS. SQ. MTS.
19, 20 & 21 OF THE LAY - OUT BEARING S. NO.
CARPET AREA IN FIRST FLOOR & SECOND A 53 . 50 X 13 . 80 M. 738 . 30
FLOOR DEDUCTION 68/ 25/ 26/ 27 OF VILLAGE - MANPHOD
53 . 50 M. 1X 8 . 70 X 1 . 60 X 2 NO. 27 . 84 TALUKA DAHANU DIST. PALGHAR FOR.__
* CARPET AREA IN FLAT NO. 1 = 60 . 81 SQ. MTS. 8 . 85 M. 8.70 M. 6 . 10 M. 6 . 20 M. 6 . 10 M. 8.70 M. 8 . 85 M.
1 8 . 70 X 2 . 30 X 2 NO. 40 . 02
* CARPET AREA IN FLAT NO. 2 = 60 . 81 SQ. MTS. 8.70 X 2.30 8.70 X 2.30
MR. IQBAL H. DHANANI
2.30

2.30
1 2 1
6.20 X 1.50 2 6 . 20 X 1 . 50 X 2 NO. 18 . 60
3 . 50 M.

3 . 50 M.
5 2.30X1.30 5 2.30X1.30
* CARPET AREA IN FLAT NO. 3 = 58 . 97 SQ. MTS.
2.60 X 2.20
7 0.60X1.50
2.0X2.50 2.0X2.50
7 0.60X1.50
2.60 X 2.20
3 2 . 60 X 2 . 20 X 2 NO. 11 . 44 MRS. ROSHAN I. DHANANI
13 . 80 M.

13 . 80 M.
* CARPET AREA IN FLAT NO. 4 = 58 . 97 SQ. MTS.
2.20

2.20
3 1.20X1.60 6 4 4 6 1.20X1.60 3
4 2 . 00 X 2 . 50 X 2 NO. 10 . 00
* CARPET AREA IN FLAT NO. 5 = 58 . 97 SQ. MTS. MR. ASIF I. DHANANI
3 . 50 M.

3 . 50 M.
5 2 . 30 X 1 . 30 X 2 NO. 5 . 98
* CARPET AREA IN FLAT NO. 6 = 58 . 97 SQ. MTS. 8.70 X 1.60 6.20 X 1.50 8.70 X 1.60 MR. ZUBER I. DHANANI
2.30

2.30
1X
2
1X 6 1 . 20 X 1 . 60 X 2 NO. 3 . 84
* CARPET AREA IN FLAT NO. 7 = 60 . 81 SQ. MTS. 8 . 85 M. 8.70 M. 6 . 10 M. 6 . 20 M. 6 . 10 M. 8.70 M. 8 . 85 M.
53 . 50 M. 7 0 . 60 X 1 . 50 X 2 NO. 1 . 80
* CARPET AREA IN FLAT NO. 8 = 60 . 81 SQ. MTS. OWNER'S SIGNATURE JOB NO._ 844 / 2019
FIRST & SECOND FLOOR AREA PLAN TOTAL DEDUCTION 119 . 52
DRAWING NO.- E/02 /02
TOTAL CARPET AREA = 479 . 12 SQ. MTS. SCALE.____ 1: 200
NET FLOOR AREA 618 . 78 BUILDING PLAN
DATE :- 19 - 09 - 2019

MAKARAND KARANDIKAR
A R C H I T E C T.
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
DAHANU ROAD DIST. PALGHAR PIN._ 401 602
23 . 60 M.
A B

RS. RS. RS. RS. RS. RS. RS.


CARPET
AREA
7.10 SMT.
CARPET CARPET CARPET CARPET CARPET CARPET
AREA AREA AREA SHOP NO. 4 AREA AREA AREA
20.13 SMT. 23.12 SMT. 20.13 SMT. 2.45 X 2.90 20.13 SMT. 23.12 SMT. 20.13 SMT.
23 . 60 M.
SHOP NO. 1 SHOP NO. 2 SHOP NO. 3 SHOP NO. 5 SHOP NO. 6 SHOP NO. 7
3.05 X 6.60 3.80 X 5.80 3.05 X 6.60 1.65 X 0.45 3.05 X 6.60 3.80 X 5.80 3.05 X 6.60

7 . 05 M.

7 . 05 M.
1.65X0.45
DUCT 8
LIFT 0.60 7 0.60X2.15

12 . 15 M.

12 . 15 M.
X
1.50X1.50 2.15 1.20X1.45
5
A 1.20X0.80
6 SCHEDULE OF OPENINGS
RS. 2 . 45 X 2 . 45 M. M.S. ROLLING SHUTTER
LOBBY 3 2 1
13 . 90 M.

2.30 X 0.80 2.30 X 1.35 2.30 X 0.80 3.25X5.10 4 4.10X5.10 10.45X5.10 SF 2 . 15 X 2 . 15 M. SLIDING FOLDING GLAZED DOOR
DUCT DUCT 3.05X2.80

1.2X1.45 1.2X1.45 D 1 . 20 X 2 . 15 M. TW. PANELLED DOOR


23 . 60 M.
D1 0 . 90 X 2 . 15 M. TW. PANELLED DOOR
BATH
1.20 X GROUND FLOOR AREA PLAN D2 0 . 75 X 2 . 00 M. TW. FLUSHED DOOR
W. C. 2.15 UP SCALE.____ 1: 200
1.35X1.25 W 1 . 20 X 0 . 95 M. ALU. GLAZED WINDOW
W1 1 . 20 X 1 . 20 M. ALU. GLAZED WINDOW
STILT FOR PARKING
V 0 . 60 X 0 . 95 M. ALU. LOUVERED VENTILATOR

DRAWING SHOWING PROPOSED RESIDENTIAL


STILT FOR PARKING
GROUND FLOOR
& COMMORCIAL BUILDING "E" IN PLOT NO.
AREA CALCULATION
AREA IN MTS. SQ. MTS. 19, 20 & 21 OF THE LAY - OUT BEARING S. NO.
A 23 . 60 X 12 . 15 M. 286 . 74
DEDUCTION
68/ 25/ 26/ 27 OF VILLAGE - MANPHOD
1 10 . 45 X 5 . 10 X 1 NO. 53 . 29 TALUKA DAHANU DIST. PALGHAR FOR.__
A B 2 4 . 10 X 5 . 10 X 1 NO. 20 . 91

3 3 . 25 X 5 . 10 X 1 NO. 16 . 57
MR. IQBAL H. DHANANI
GROUND CUM STILT FLOOR PLAN 4 3 . 05 X 2 . 80 X 1 NO. 8 . 54
MRS. ROSHAN I. DHANANI
SCALE.____ 1 : 100 5 1 . 20 X 1 . 45 X 1 NO. 1 . 74

6 1 . 20 X 0 . 80 X 1 NO. 0 . 96 MR. ASIF I. DHANANI


CARPET AREA IN GROUND FLOOR SHOPS
CARPET AREA STATEMENT 7

8
0 . 60 X 2 . 15 X 1 NO.

1 . 65 X 0 . 45 X 1 NO.
1 . 29

0 . 74
MR. ZUBER I. DHANANI
* CARPET AREA IN SHOP NO. 1, 3, 5 & 7
3 . 05 X 6 . 60 = 20 . 13 ) = 20 . 13 X 4 = 80 . 52 SQ. MTS. * CARPET AREA IN GROUND FLOOR = 138 . 12 SQ. MTS. TOTAL DEDUCTION 104 . 04
OWNER'S SIGNATURE JOB NO._ 844 / 2019
NET FLOOR AREA 182 . 70
* CARPET AREA IN SHOP NO. 2 & 6 * CARPET AREA IN FIRST FLOOR = 226 . 80 SQ. MTS. DRAWING NO.- E/02 /02
3 . 80 X 5 . 60 = 21 . 28 ) = 23 . 12 X 2 = 46 . 24 SQ. MTS.
BUILDING PLAN
2 . 30 X 0 . 80 = 1 . 84 ) * CARPET AREA IN SECOND FLOOR = 226 . 80 SQ. MTS.
DATE :- 19 - 09 - 2019
* CARPET AREA IN SHOP NO. 4 * CARPET AREA IN RAIZED = 113 . 40 SQ. MTS.
2 . 45 X 2 . 90 = 7 . 10 ) = 7 . 10 X 2 = 7 . 10 SQ. MTS.
SECOND FLOOR MAKARAND KARANDIKAR
* CARPET AREA IN COMMON BATH A R C H I T E C T.
1 . 20 X 2 . 15 = 2 . 58 ) = 2 . 58 X 1 = 2 . 58 SQ. MTS.
* TOTAL CARPET AREA = 705 . 12 SQ. MTS.
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
* CARPET AREA IN COMMON W. C.
DAHANU ROAD DIST. PALGHAR PIN._ 401 602
1 . 35 X 1 . 25 = 1 . 68 ) = 1 . 68 X 1 = 1 . 68 SQ. MTS.

TOTAL CARPET AREA = 138 . 12 SQ. MTS.


23 . 60 M.

1
8.70X1.75

2.30X2.0 2

13 . 90 M.

13 . 90 M.
1.20X1.45 0.60X1.60 1.20X1.45
3 A 3

8.70X1.75
1
23 . 60 M.
23 . 60 M.
BL1 3 . 40 M. A B BL4 3 . 40 M.
FIRST & SECOND FLOOR AREA PLAN
INCLOSE INCLOSE SCALE.____ 1: 200
BALC. 0.90 M. WIDE
V W1 W1 V BALC. 0.90 M. WIDE SCHEDULE OF OPENINGS
SF SF RS. 2 . 45 X 2 . 45 M. M.S. ROLLING SHUTTER
BL2 3 . 20 M. BL3 3 . 20 M. FIRST & SECOND FLOOR
TOILET INCLOSE INCLOSE TOILET SF 2 . 15 X 2 . 15 M. SLIDING FOLDING GLAZED DOOR
M. BED ROOM
D2 1.20 X
2.30
KITCHEN BALC. 0.90 M. WIDE OPEN BALC. 0.90 M. WIDE KITCHEN 1.20 X D2
2.30 M. BED ROOM
AREA CALCULATION
D 1 . 20 X 2 . 15 M. TW. PANELLED DOOR
3.05 X 3.35 2.45 X 3.10 TERRACE 2.45 X 3.10 3.05 X 3.35
SF SF AREA IN MTS. SQ. MTS. D1 0 . 90 X 2 . 15 M. TW. PANELLED DOOR
D2 0 . 75 X 2 . 00 M. TW. FLUSHED DOOR
D1 D1 A 23 . 60 X 13 . 90 M. 328 . 04
PASS. PASS. W 1 . 20 X 0 . 95 M. ALU. GLAZED WINDOW
PASSAGE PASSAGE DEDUCTION
1.20X2.0 LIVING + DINING LIVING + DINING 1.20X2.0 W1 1 . 20 X 1 . 20 M. ALU. GLAZED WINDOW
D1 2.75 X 1.05 2.75 X 1.05 D1
D2 D2 3.05 X 4.85 LIFT 3.05 X 4.85 D2 D2 V 0 . 60 X 0 . 95 M. ALU. LOUVERED VENTILATOR
1.50X1.50
1 8 . 70 X 1 . 75 X 2 NO. 30 . 45
2.30 X 1.05

2.30 X 1.05
BED ROOM W. C. W. C. BED ROOM
W 3.05 X 3.10 BATH BATH 3.05 X 3.10 W 2 2 . 30 X 2 . 00 X 1 NO. 4 . 60
1.35X1.20 CARPET CARPET 1.35X1.20
1.20 X AREA AREA
1.20 X DRAWING SHOWING PROPOSED RESIDENTIAL
13 . 90 M.

2.15 56.70 SMT. 56.70 SMT. 2.15


V V 2 D D 3 V
VDUCT
3 1 . 20 X 1 . 45 X 2 NO. 3 . 48
DUCT LOBBY & COMMORCIAL BUILDING "E" IN PLOT NO.
1.2X1.45 2.30 X 2.90 1.2X1.45 4 0 . 60 X 1 . 60 X 1 NO. 0 . 94
V V 1 D D 4 V V 19, 20 & 21 OF THE LAY - OUT BEARING S. NO.
2.30 X 1.05

2.30 X 1.05
BATH CARPET CARPET BATH
1.20 X
AREA DN UP AREA
1.20 X
TOTAL DEDUCTION 39 . 47
W. C. 56.70 SMT. 56.70 SMT. W. C.
W
BED ROOM
3.05 X 3.10 1.35X1.20
2.15 2.15
1.35X1.20
BED ROOM
3.05 X 3.10 W NET FLOOR AREA 288 . 57 68/ 25/ 26/ 27 OF VILLAGE - MANPHOD
D2 D2 LIVING + DINING LIVING + DINING D2 D2 TALUKA DAHANU DIST. PALGHAR FOR.__
D1PASS. D1
PASSAGE 3.05 X 4.85 3.05 X 4.85 PASSAGE PASS.
CARPET AREA IN FIRST FLOOR & SECOND
1.20X2.0 2.75 X 1.05 2.75 X 1.05 1.20X2.0
FLOOR
MR. IQBAL H. DHANANI
D1 D1
2.30 M. * CARPET AREA IN FLAT NO. 1 = 56 . 70 SQ. MTS. MRS. ROSHAN I. DHANANI
* CARPET AREA IN FLAT NO. 2 = 56 . 70 SQ. MTS.
SF SF
M. BED ROOM
TOILET
3.05 X 3.35 D2 1.20 X
KITCHEN KITCHEN
TOILET
M. BED ROOM * CARPET AREA IN FLAT NO. 3 = 56 . 70 SQ. MTS. MR. ASIF I. DHANANI
2.45 X 3.10 INCLOSE INCLOSE 2.45 X 3.10 1.20 X D2 3.05 X 3.35 * CARPET AREA IN FLAT NO. 4 = 56 . 70 SQ. MTS.
BALC. 0.90 M. WIDE BALC. 0.90 M. WIDE
2.30
BL7 3 . 20 M. BL6 3 . 20 M.
2.30
TOTAL CARPET AREA = 226 . 80 SQ. MTS.
MR. ZUBER I. DHANANI
SF SF
INCLOSE V W1 W1 V INCLOSE OWNER'S SIGNATURE JOB NO._ 844 / 2019
BALC. 0.90 M. WIDE BALC. 0.90 M. WIDE
PROPOSED BALCONY AREA STATEMENT DRAWING NO.- E/02 /02
BL8 3 . 40 M. BL5 3 . 40 M.
A B FOR FIRST FLOOR & SECOND FLOOR BUILDING PLAN
( FREE OF F. S. I. ) DATE :- 19 - 09 - 2019
FIRST & SECOND FLOOR PLAN BL1 = 0 . 90 X 3 . 40 = 3 . 06 SQ. MTS.
SCALE.____ 1 : 100
BL2 = 0 . 90 X 3 . 20 = 2 . 88 SQ. MTS. MAKARAND KARANDIKAR
BL3 = 0 . 90 X 3 . 20 = 2 . 88 SQ. MTS.
A R C H I T E C T.
BL4 = 0 . 90 X 3 . 40 = 3 . 06 SQ. MTS.
BL5 = 0 . 90 X 3 . 40 = 3 . 06 SQ. MTS. 'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
BL6 = 0 . 90 X 3 . 20 = 2 . 88 SQ. MTS. DAHANU ROAD DIST. PALGHAR PIN._ 401 602
BL7 = 0 . 90 X 3 . 20 = 2 . 88 SQ. MTS.
BL8 = 0 . 90 X 3 . 40 = 3 . 06 SQ. MTS.

0 . 90 X 26 . 40 RMT. = 23 . 76 SQ. MTS.


TOTAL= 23 . 76 X 2 FLOORS = 47 . 52 SQ. MTS.
23 . 60 M.

4
1 1
0.80X1.60
10.45X3.15 10.45X3.15

10 . 20 M.

10 . 20 M.
3 3
1.20X0.80 1.20X0.80

8.70X1.75
2

23 . 60 M.

A B RAIZED SECOND FLOOR AREA PLAN


SCALE.____ 1: 200

SCHEDULE OF OPENINGS
RS. 2 . 45 X 2 . 45 M. M.S. ROLLING SHUTTER
RAIZED SECOND FLOOR SF 2 . 15 X 2 . 15 M. SLIDING FOLDING GLAZED DOOR
AREA CALCULATION D 1 . 20 X 2 . 15 M. TW. PANELLED DOOR
D1 0 . 90 X 2 . 15 M. TW. PANELLED DOOR
OPEN TERRACE OPEN TERRACE AREA IN MTS. SQ. MTS.
D2 0 . 75 X 2 . 00 M. TW. FLUSHED DOOR
A 23 . 60 X 10 . 20 M. 240 . 72 W 1 . 20 X 0 . 95 M. ALU. GLAZED WINDOW
LIFT
1.50X1.50 W1 1 . 20 X 1 . 20 M. ALU. GLAZED WINDOW
DEDUCTION
V 0 . 60 X 0 . 95 M. ALU. LOUVERED VENTILATOR
1 10 . 45 X 3 . 15 X 2 NO. 65 . 83
13 . 90 M.

D D
DUCT LOBBY 2 8 . 70 X 1 . 75 X 1 NO. 15 . 22 DRAWING SHOWING PROPOSED RESIDENTIAL
1.2X1.45 2.30 X 2.90 1.2X1.45
V V 1 D D 2
V V 3 1 . 20 X 0 . 80 X 2 NO. 1 . 92 & COMMORCIAL BUILDING "E" IN PLOT NO.
2.30 X 1.05

2.30 X 1.05
BATH CARPET CARPET BATH
AREA DN UP AREA
1.20 X 56.70 SMT. 56.70 SMT. 1.20 X 4 0 . 80 X 1 . 60 X 1 NO. 1 . 28
BED ROOM W. C.
2.15 2.15
W. C. BED ROOM 19, 20 & 21 OF THE LAY - OUT BEARING S. NO.
3.05 X 3.10 1.35X1.20 1.35X1.20 3.05 X 3.10
W W
TOTAL DEDUCTION 84 . 25
D2
D1PASS.
D2 LIVING + DINING LIVING + DINING D2 D2
D1
68/ 25/ 26/ 27 OF VILLAGE - MANPHOD
PASSAGE 3.05 X 4.85 3.05 X 4.85 PASSAGE PASS. NET FLOOR AREA 156 . 47
1.20X2.0 2.75 X 1.05 2.75 X 1.05 1.20X2.0 TALUKA DAHANU DIST. PALGHAR FOR.__
D1 D1
2.30 M. CARPET AREA IN RAIZED SECOND FLOOR MR. IQBAL H. DHANANI
SF SF
M. BED ROOM
TOILET
3.05 X 3.35 D2 1.20 X
KITCHEN KITCHEN
TOILET
M. BED ROOM
3.05 X 3.35
* CARPET AREA IN FLAT NO. 1 = 56 . 70 SQ. MTS.
MRS. ROSHAN I. DHANANI
2.45 X 3.15 INCLOSE INCLOSE 2.45 X 3.15 1.20 X D2 * CARPET AREA IN FLAT NO. 2 = 56 . 70 SQ. MTS.
BALC. 0.90 M. WIDE BALC. 0.90 M. WIDE
2.30
BL2 3 . 20 M. BL3 3 . 20 M.
2.30
TOTAL CARPET AREA = 113 . 40 SQ. MTS.
MR. ASIF I. DHANANI
SF SF
INCLOSE V W1 W1 V INCLOSE
MR. ZUBER I. DHANANI
BALC. 0.90 M. WIDE BALC. 0.90 M. WIDE
BL1 3 . 40 M. BL4 3 . 40 M. OWNER'S SIGNATURE JOB NO._ 844 / 2019
A B PROPOSED BALCONY AREA STATEMENT
23 . 60 M. DRAWING NO.- E/02 /02
FOR RAIZED SECOND FLOOR BUILDING PLAN
RAIZED SECOND FLOOR PLAN ( FREE OF F. S. I. ) DATE :- 19 - 09 - 2019
SCALE.____ 1 : 100
BL1 = 0 . 90 X 3 . 40 = 3 . 06 SQ. MTS. MAKARAND KARANDIKAR
BL2 = 0 . 90 X 3 . 20 = 2 . 88 SQ. MTS. A R C H I T E C T.
BL3 = 0 . 90 X 3 . 20 = 2 . 88 SQ. MTS. 'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
BL4 = 0 . 90 X 3 . 40 = 3 . 06 SQ. MTS. DAHANU ROAD DIST. PALGHAR PIN._ 401 602
0 . 90 X 13 . 20 RMT. = 11 . 88 SQ. MTS.
TOTAL= 11 . 88 X 1 FLOORS = 11 . 88 SQ. MTS.
Si
teVi
sit&St
udy-
I
MRUGAS.RAUT
5THYEAR“B”
DEPT.OFARCHI
TECTURE
M.I
.T
I
nter
act
ionWi
thConsul
tant-I
MRUGAS.RAUT
5THYEAR“B”
DEPT.OFARCHI
TECTURE
M.I
.T
PROJECT : MR. PRAJAPATI’S BUNGALOW
LOCATION : TALASARI

MEETING 1 :
• Discussion with client about requirements of bungalow.
• Design as per Vastu shastra .
• Size and location of plot.

MEETING 2 :
• Discussion about the plan below
• Changing the position of Living hall and kitchen.
• Adding Pooja room.
PROJECT : MR. PRAJAPATI’S BUNGALOW
LOCATION : TALASARI

MEETING 2 :
• Changes as per previous discussion.
• Adding upper floor with 2 bedrooms.
• Changing position of Pooja room.

MEETING 3 :
• Finalizing the plan .
• Proceeding for RCC design .
PROJECT : MRS. PATIL’S BUNGALOW
LOCATION : SANGALI

MEETING 1 :
• Discussion with client about requirements of bungalow.
• Provision of parking below .
• Size and location of plot.
• 2bhk on 1st and 2nd floor

MEETING 2 :
• Finalizing the plan .
• Discussing about the elevation.
• Placing column along the side
Of the buildings and not in center.
PROJECT : MRS. PATIL’S BUNGALOW
LOCATION : SANGALI

MEETING 4 :
• Finalizing the view .
• Proceeding for working drawing.
PROJECT : MRS. PATIL’S BUNGALOW
LOCATION : SANGALI

MEETING 5 : ARCHVIEW FIRM


Discussing the view with out sourcing firm.( 3D)
Providing required working drawings.

MEETING 6 :
• Discussing the estimation cost with client.
• Quotation sheets given below.
Date :- October 05, 2019

QUANTITY ESTIMATE SHEET

Name Of The Site :- Proposed Bunglow in S. No:- 18/18 of Village:- URUN,


Taluka - Valva, District - Sangali

For :-Mrs. ASHWINI BHUSHAN PATIL

STILT FLOOR

S.N. ITEM DESCRIPTION QTY/UNIT RATE/UNIT AMOUNT


1 Excavation of FDN As per requirement 4140/ C.ft 12.0/c.ft. 49680 00
2 P.C.C. In FDN 1: 3 : 6 6" Thk with laying & curing 460/S.ft. 70.0/s.ft. 32200 00
complete
3 R.C.C. Footings CONC.Mix 1: 2: 4 with 640/C.ft. 315.0/s.ft. 201600 00
reinforcement complete
4 R.C.C.Columns below plinth CONC.Mix 1: 2: 4 with 75/ C.ft 315.0/c.ft. 23625 00
reinforcement complete
5 R.C.C. Plinth Beams CONC.Mix 1: 2: 4 with 212 / C.ft 315.0/c.ft. 66780 00
reinforcement complete
6 Earth Filling in Plinth Murum / Earth filling 365 /C.Ft. 18.00/c.ft. 6570 00
7 Rubble Soling in Plinth 9" to 6" Rubble with 575 / S.ft. 45.0/Sft. 25875 00
Spacking Complete
8 1:3:6 P.C.C. in Plinth 6" THK with laying &curing complete 885 / S.ft. 55.0/s.ft. 48675 00
9 R.C.C. Columns in Stilt Floor CONC.Mix 1: 2: 4 with 148 /C.ft. 315.0/c.ft. 46620 00
reinforcement, shuttering
& curing complete
10 R.C.C. Floor beams in CONC.Mix 1: 2: 4 with 435 /C.ft. 315.0/c.ft. 137025 00
Stilt Floor reinforcement , shuttering
& curing complete
11 R.C.C. Slab in Stilt Floor CONC.Mix 1: 2: 4 with 805/S.ft. 195.0/s.ft. 156975 00
reinforcement, shuttering
& curing complete
12 Internal Plaster Cement Morter 1:6 with 1475 /S.ft. 55.0/s.ft. 81125 00
Scaffolding, niroo finished
complete
13 External Plaster CONC.Mix 1: 2: 4 with 275 /S.ft. 75.0/s.ft. 20625 00
Scaffolding,curing, finishing
complete in double coat
14 Intenal Painting in With prepartion of surface and 1475/S.ft 20.0/s.ft. 13750 00
oil bond distemper 3 Coats complete
…Cont. On Page 2
S.N. ITEM DESCRIPTION QTY/UNIT RATE/UNIT AMOUNT
15 External Painting in cement paint Of approved brand with 275/S.ft. 28.0/s.ft. 7700 00
preparation of surface ,
Scaffolding & curing complete
16 Electrification As per electrical layout copper Lumpsum 15000 00 15000 00
in First Floor wiring & earthing, placing
Boards / Buttons etc. complete
17 R.C.C. Stair case in CONC.Mix 1: 2: 4 with 64 /C.ft. 315.0/c.ft. 20160 00
Stilt Floor reinforcement , shuttering
& curing complete

FIRST FLOOR

S.N. ITEM DESCRIPTION QTY/UNIT RATE/UNIT AMOUNT


1 R.C.C. Columns in First Floor CONC.Mix 1: 2: 4 with 175 /C.ft. 315.0/c.ft. 55125 00
reinforcement, shuttering
& curing complete
2 R.C.C. Floor Beams in CONC.Mix 1: 2: 4 with 435 /C.ft. 315.0/c.ft. 137025 00
First Floor reinforcement , shuttering
& curing complete
3 R.C.C. Slab in First Floor CONC.Mix 1: 2: 4 with 805/S.ft. 195.0/s.ft. 156975 00
reinforcement, shuttering
& curing complete
4 9" THK. B.B. Mesonary in Cement Morter 1:6 with 590/S.ft. 115.0/s.ft. 67850 00
First Floor with curing complete
5 4 1/2" THK. B.B. Mesonary Cement Morter 1:6 with 690/S.ft. 85.0/s.ft. 58650 00
in First Floor with curing complete
6 R.C.C. Lintol CONC.Mix 1: 2: 4 with 92 /C.ft. 245.0/c.ft. 22540 00
in First Floor reinforcement shuttering
& curing complete
7 R.C.C. Chajjas CONC.Mix 1: 2: 4 with 82 /S.ft. 165.0/s.ft. 13530 00
in First Floor reinforcement shuttering
& curing complete
8 R.C.C. Loft slab 4" THK With Centering, curing 136 /S.Ft. 165.0/s.ft. 22440 00
in First Floor complete with reinforcement
& CONC Mix 1:2:4
9 Internal Plaster Cement Morter 1:6 with 3325 /S.ft. 55.0/s.ft. 182875 00
in First Floor Scaffolding, niroo finished
complete
…Cont. On Page 3
S.N. ITEM DESCRIPTION QTY/UNIT RATE/UNIT AMOUNT
10 External Plaster CONC.Mix 1: 2: 4 with 1430 /S.ft. 75.0/s.ft. 107250 00
in First Floor Scaffolding,curing, finishing
complete in double coat
11 Ceramic Tile Flooring 2' x 2' With laying & White cement 800 / S.ft. 90.0/s.ft. 72000 00
in First Floor Line finishing complete
12 Ceramic Tile Skirting 4" THK With laying & White cement 300 / R.Ft. 65.0/r.ft 19500 00
in First Floor Line finishing complete
13 Glazed Tile work in Toilet & With fixing & white cement 610 / S.Ft. 75.0/s.ft. 45750 00
Kitchen dado & over Wash Hand Line finishing complete
Basin 8" x 12" size
14 GRENITE Kitchen Plat- Fixing in position over 16 /R.ft. 2000/r.ft. 32000 00
form with S.S. Sink Kadappa framing with
in First Floor moulding&finishing complete
15 Aluminium Glazed ' In 18 Guage section, 4 Channel 208/S.ft. 270.0/s.ft. 56160 00
P/Coated windows with fixtures & Placing in
in First Floor position complete
16 Aluminium Loovered windows In 18 Guage section, 3 Channel 18 /S.ft. 150.0/s.ft. 2700 00
P.Coated with fixtures & Placing in
in First Floor position complete
17 4"x 2 1/2" T.W. Framed Flush With S.S. Loxideised / Brass 66.50 /S.ft. 850.0/s.ft. 56525 00
door one side Laminate finished. fitting, with errection & Lipping
in First Floor patty fixing complete as per
design
18 Fibre Panelled Aluminium door With errection & fixing with 48.75/S.ft. 350.0/s.ft. 17062 50
for toilet / W.C. / Bath necessary aluminium fixtures
in First Floor complete
19 Intenal Painting in Luster With prepartion of surface and 3325/S.ft 30.0/s.ft. 99750 00
finish in First Floor 3 Coats complete
20 External Painting in cement paint Of approved brand with 1430/S.ft. 20.0/s.ft. 28600 00
in First Floor preparation of surface ,
Scaffolding & curing complete
in 2 coats
21 Electrification As per electrical layout copper Lumpsum 40000 00 40000 00
in First Floor wiring & earthing, placing
Boards / Buttons etc. complete
…Cont. On Page 4
S.N. ITEM DESCRIPTION QTY/UNIT RATE/UNIT AMOUNT
22 Plumbling Water supply & drainage line Lumpsum 30000 00 30000 00
in First Floor work with laying /placing in
position, with necessary
fixtures,chember etc. complete
23 R.C.C. Stair case in CONC.Mix 1: 2: 4 with 64 /C.ft. 315.0/c.ft. 20160 00
First Floor reinforcement , shuttering
& curing complete

SECOND FLOOR
S.N. ITEM DESCRIPTION QTY/UNIT RATE/UNIT AMOUNT
1 R.C.C. Columns in Second Floor CONC.Mix 1: 2: 4 with 175 /C.ft. 315.0/c.ft. 55125 00
reinforcement, shuttering
& curing complete
2 R.C.C. Floor beams in CONC.Mix 1: 2: 4 with 435 /C.ft. 315.0/c.ft. 137025 00
Second Floor reinforcement , shuttering
& curing complete
3 R.C.C. Slab in Second Floor CONC.Mix 1: 2: 4 with 805/S.ft. 195.0/s.ft. 156975 00
reinforcement, shuttering
& curing complete
4 9" THK.B.B.Mesonary in 590/S.ft. 115.0/s.ft. 67850 00
Second Floor with curing complete
5 4 1/2" THK.B.B.Mesonary in Cement Morter 1:6 with 690/S.ft. 85.0/s.ft. 58650 00
Second Floor with curing complete
6 R.C.C. Lintol in CONC.Mix 1: 2: 4 with 92 /C.ft. 245.0/c.ft. 22540 00
Second Floor reinforcement shuttering
& curing complete
7 R.C.C. Chajjas in CONC.Mix 1: 2: 4 with 82 /S.ft. 165.0/s.ft. 13530 00
Second Floor reinforcement shuttering
& curing complete
8 R.C.C. Loft slab 4" THK With Centering, curing 136 /S.Ft. 165.0/s.ft. 22440 00
Second Floor complete with reinforcement
& CONC Mix 1:2:4
9 Internal Plaster in second floor Cement Morter 1:6 with 3850 /S.ft. 55.0/s.ft. 211750 00
& stair case cabin Scaffolding, niroo finished
complete
10 External Plaster CONC.Mix 1: 2: 4 with 3395 /S.ft. 75.0/s.ft. 254625 00
Second Floor & Perrapet Wall Scaffolding,curing, finishing
& stair case cabin complete in double coat
…Cont. On Page 5
S.N. ITEM DESCRIPTION QTY/UNIT RATE/UNIT AMOUNT
11 Ceramic Tile Flooring 2' X 2' With laying & White cement 800 / S.ft. 90.0/s.ft. 72000 00
Second Floor Line finishing complete
12 Ceramic Tile Skirting 4" THK With laying & White cement 300 / R.Ft. 65.0/r.ft 19500 00
Second Floor Line finishing complete
13 Glazed Tile work in Toilet & With fixing & white cement 600 / S.Ft. 75.0/s.ft. 45000 00
Kitchen dado & over Wash Hand Line finishing complete
Basin 8" x 12" size
14 GRENITE Kitchen Plat- Fixing in position over 16 /R.ft. 2000/r.ft. 32000 00
form with S.S. Sink Kadappa framing with
Second Floor moulding&finishing complete
15 Aluminium Glazed ' In 18 Guage section, 4 Channel 208/S.ft. 270.0/s.ft. 56160 00
P/Coated windows with fixtures
position & Placing in
complete
16 Aluminium Loovered windows In 18 Guage section, 3 Channel 18 /S.ft. 150.0/s.ft. 2700 00
P.Coated with fixtures & Placing in
in Second Floor position complete
17 4"x 2 1/2" T.W. Framed Flush With S.S. Loxideised / Brass 66.50 /S.ft. 850.0/s.ft. 56525 00
door one side Laminate finished. fitting, with errection & Lipping
Second Floor patty fixing complete as per
design
18 Fibre Panelled Aluminium door With errection & fixing with 48.75/S.ft. 350.0/s.ft. 17062 50
for toilet / W.C. / Bath necessary aluminium fixtures
19 Intenal Painting in Luster finish With prepartion of surface and 3850/S.ft 30.0/s.ft. 115500 00
in Second Floor & staircase cabin 3 Coats complete
20 External Painting in cement paint Of approved brand with 3395/S.ft. 20.0/s.ft. 67900 00
in Second Floor ,Perrapet Wall & preparation of surface ,
stair case cabin Scaffolding & curing complete
in 2 coats
21 Electrification As per electrical layout copper Lumpsum 40000 00 40000 00
in Second Floor wiring & earthing, placing
Boards / Buttons etc. complete
22 Plumbling Water supply & drainage line Lumpsum 30000 00 30000 00
in Second Floor work with laying /placing in
position, with necessary
fixtures,chember etc. complete
…Cont. On Page 6
S.N. ITEM DESCRIPTION QTY/UNIT RATE/UNIT AMOUNT
23 R.C.C. Stair case in CONC.Mix 1: 2: 4 with 64 /C.ft. 315.0/c.ft. 20160 00
Second Floor reinforcement , shuttering
& curing complete
24 9" THK B.B. Messonary in terrace Cement Morter 1:6 with 669/S.ft. 125.0/s.ft. 83625 00
& Stair case cabin curing complete
25 I.P.S. water proofing in terrace Laying Brick Bat Coba and 787/S.ft. 115.0/s.ft. 90505 00
P.C.C. with required slope &
Finishing & curing complete
26 O/H Water Tank As per R.C.C. Design with 5000/ltrs. 15.0/ltrs. 75000 00
centering/scaffolding & in case
mix 1: 1.5 : 3 with curing &
Finishing complete as per the
required capacity
27 Septic Tank As per requirement & design Lumpsum 50000 00 50000 00
in B.B. Messanary & 1:3:6 P.C.C
in FDNs & 4" THK R.C.C. slab
with cement plaster complete
28 Soak Pit of regd. Capacity with Brick Lumpsum 15000 00 15000 00
Bats & Cool
TOTAL = 41, 87, 600 . 00

( Rupees. FOURTY ONE LAKHS EIGHTY SEVEN THOUSAND SIX HUNDRED ONLY )

M.B.Karandikar
(Architect)
PROJECT : GNANMATA SANDAN
LOCATION : TALASARI

MEETING 1: Contractor Er. Prajapati


• Drawing layout of college.
• Placing columns as per the discussion with the engineer.
Fi
eld Obser
vat
ionSt
udy
MRUGAS.RAUT
5THYEAR“B”
DEPT.OFARCHI
TECTURE
M.I
.T
KOHINOOR
SQUARE

-MRUGA S. RAUT
KOHINOOR
SQUARE
• Location : Mumbai , India

• Type : Mixed use building

• Architect : SSAArchitects

• Height : 203 m Main building 142 m


Residence building

• Floor : 52 stories , 32 stories Count

• Selection : First Mixed use high-rise


criteria in Mumbai
Car Park
Entry Service
Entry

Public
Parking
Entry

Site 4.6
Office/Ret Area : Acres
ail Entry
Hot
el
The first five floors of the main building
is used for a high-end shopping mall
Office Residenc and the remaining 47 floors of the main
s es building is utilized for a commercial
offices and five star hotel.
The main building is crowned by five star
Parkin
Reta g hotel on top 5 floor.
il The first 13 floors of the residential
building is used as a parking garage for
both the buildings and the remaining 19
floors is residences.
Parking provided for about 2000 cars
with super efficient driveways and
personalized access controls.
Central core(Office tower) consist of :

• 3 Lobbies of 6 Lifts serving levels 25th


to 39th

• Spaces between the lifts where a lift


lobby is not provided are used as
toilets with dust at either side: 2
lifts from this pack of 6 are
assessable to lower floors as well

• 1 lobby of 4 lifts serving levels 1st to


24th

• There is a lift bank at 24th floor .

• 2 services lifts travelling


Throughout the building

• 2 Stair cases are also placed in the


core .
HVAC & Flume
Shaft

FHC Shaft

Electrical Shaft
• The Central Core is surrounded by the
office spaces.

• There are segregated office space from


6th to 14 floor with toilets to each office
and common toilets also provided on all
these floor.

• Refuge Floors is
11th to 24th Floor
provided.
DCR RULE
In case of high-rise bldg. more than 30 m
then first refuge floor shall be provided at 24
m or first habitable floor whichever is higher.
Thereafter at every seventh habitable floor.

24th to 37th Floor


Residential Building :
13 stories of parking in below
floors.
132 residential
units . 8 units on
each floor.
At top few floors 4 units on
each floor.

Central Core :
3 lifts and 1 service lift
2 Stairs are also placed in the
core.
Structure
system :
The structure comprises a concrete core
and post- tensioned concrete slab and
spandrel beams.

The average centre to centre distance


between columns is 9.5 m.

The column is of 1.8 x 1.8 m .

The tube system concept is based on the


idea that a building can be designed to
resist lateral loads.

This assembly of columns and beams


forms a rigid frame that amounts to a
dense and strong structural wall along the
9.5 m exterior of the building.
Foundation :
The combined pile raft foundation system is used
.

It is a geotechnical composite construction that


combines the bearing effect of both foundation
elements raft and piles .

The pile raft foundation system has recently


been widely used for many structures ,
specially in high-rise buildings.
The façade consists of faceted unitized
aluminum curtain walls with provisions for high
performance double glass façades on the
tower.

Diamond edges of the building having aluminum


flashing with LED lighting are the unique feature
and make it complicated façade design.

All the Glasses are articulated glasses & can


sustain design wind pressure of 4.5 to 5.0 kPa.

The building design makes it environmentally


friendly, using technologies such as floor-to-
ceiling insulated glazing to contain heat and
maximize natural light, and an automatic
daylight dimming system
15 double height landscaped Sky Gardens and
more than a dozen double height Terraces, to act
as tranquil and refreshing breakoutzones.

Low flow faucets, dual flush toilets, grey water


systems and storm water &rainwater management
systems – all a part of our commitment to the
environment
SUSTAINAB FEATUR
LE ES
The Kohinoor square building is one of the first skyscraper
building in india to achieve a leadership in energy and
environmental design platinum rating for environmental
sustainability a gold (leed) certification from green building
council. Construction of the Kohinoor square started in early
2009, with an completion date of march 2013.
Of
fi
ceAdmi
nist
rat
ion&Log-
I
MRUGAS.RAUT
5THYEAR“B”
DEPT.OFARCHI
TECTURE
M.I
.T
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner
Wor
kingDr
awi
ng-I
MRUGAS.RAUT
5THYEAR“B”
DEPT.OFARCHI
TECTURE
M.I
.T
NOTE :

SCHEDULE OF DOORS :

2' 2'
D
1'-6"
B A ELEVATION-'CC' 1'-6" 2' 2' 1'-6" 2' 2'
104'-6"
DUCT
2'

DUCT DUCT
2'-6"
3'-6"

3'-6"

3'-6"
4'6" X 2'6" 16' 15'-3" 4'6" X 2'6" 16'
4'6" X 2'6"
1' 2'5' 1'-6" 1' 2' 1'-6"

6'
4'

4'

4'
5' 4' wide sit out dn 4' wide sit out 4' wide sit out 5' SCHEDULE OF WINDOWS :
2'-6"

2'-6"

2'-6"

2'-6"
13'
dn 1' 1' 4' 3'-6" 4' 3'-6" 4' 3'-3" 4' 1' 1' 13'-3" 2' 1' 1'
dn 14'
BAY WINDOW

BAY WINDOW

BAY WINDOW
6'-9"

6'-9"
3' 6' 3' 2'-9" 6' 2'-9" 3' 6' 3'
1'

1'

1'
W4
1'-9" 4' 2' 1' 4' 1'-5" 1'-5" 4' 1' 1'-9" 4' 1'-6" W4 1'-5" 4' 1' 2' 4' W4
W5 W5 W5 W5 W5 W5
12' 8'-6" 8' 11'-6" 8'-6" 12'
5'

5'

5'
5'
3'-6"

3'-6"

3'-6"
W8 W8 W8
6'-3"

6'-3"

6'-3"
Kitchen Maid's Room+ Maid's Room+ Kitchen Maid's Room+ Kitchen
2' 5'-3" 4'-3" 3'-6" 2'
8'0"x9'0" Utility Utility 7'6"x9'0" Utility 8'0"x9'0"
9"

9"
1'-9" 1'-9" 1'-9"
9'-6"

9'-6"

9'-6"
9'

9'

9'

9'

9'

9'

9'

9'

9'
6"

6"

6"
2'

2'
Dining 6'6"x9'0" 6'6"x9'0" Dining 6'6"x9'0" Dining
lift 1'-6" 1'-6" lift 1'-6" lift
9" 12'0"x9'6" 11'6"x9'6" 12'0"x9'6" 9"
4'-6"

4'-6"

4'-6"
4'6"x4'0" 4'6"x4'0" 4'6"x4'0"
4'

4'

4'
2'-6"

2'-6"

2'-6"
6'-6" 6'-6" 6'-6"
4'

D2 D2 D2
6" 3'-6" 6" 7'-9" 7'-3" 6" 3'-6" 6" 7'-9" 6" 3'-6" 6"
ELEVATION-'DD'

ELEVATION-'BB'
6" 6"
6"
1' 6"

1' 6"

1' 6"
9" 2'-6" 9"

9" 2'-6" 9"


1' 4'-6" 4' 1' 4'-6" 1'
2'

2'

2'
6" 2'-6" 6"

6" 2'-6" 6"


2'-3" 2'-9" 2'-6" 2'-6" 2'-9" 2'-3" 2'-6" 2'-9" 2'-3"
4'-6"

4'-6"

4'-6"
7'-6" 7'-6" 7'-6"

4'
W3 V V V W3 C
C
2'

2'

2'
2'-6"

2'-6"

2'-6"
Toilet Toilet Toilet
35'-3"

up D2 D2 up D2 up
7'6"x4'6" 7'6"x4'6" 7'6"x4'6"
1'

1'

1'
6" 1 TREAD 10" TREAD 110" 1 6"
TREAD 10"
RISER 6.86"
2 RISER 6.86" 2 RISER 6.86"
2
3' 8'-6" 8' 3' 8'-6" 3'
1'

1'

1'
3 12' 11'-6" 3 12' 3
3" 2'-6" 6" 2'-6" 3" 6" 2'-6" 3"
14'-6"

14'-6"

14'-6"
D1 D1 D1
4 4 4
5 5 5
10'-6"

10'-6"

10'-6"
9'-3"

9'-3"
Bedroom Bedroom Bedroom
10'-9"

10'-9"

10'-9"
6 15 Living hall Living hall 15 6 Living hall 15 6
12'0"x14'0" 11'6"x14'0" 12'0"x14'0"
14'

7 14 14 7 14 7
8
12'0"x14'6" 11'6"x14'6" 8
12'0"x14'6" 8
13 13 13
9 12 12 9 12 9

14'-6"
6" 6" 6"
12'

12'

12'
14'

10 10 10 10 10 10
9" 3' 3' 3' 3' 3' 3' 9"
mid- mid- mid-
3'

3'

3'
14'-6"
14'-6"

landing W2 W2 landing W2 landing


2'

2'
4'-6" 4' 3'-6" 3'-6" 4' 4' 3'-6" 4' 4'-6"
1'

1'

1'
7'-9" 4'-6" 7' 7' 4' 7' 7' 4'-6" 7'-9"
W1
Lobby 12' 11'-6" Lobby W1 12' Lobby W1
4'

4'

4'
2'

2'

2'
3" 3" 3" 3" 3" 3"
9 7'0"x4'0" W6 W6 7'0"x4'0"
10 W6 7'0"x4'0"
11
6'-6"

6'-6"

6'-6"
MD MD MD
2'-9" 6' 2'-9" 2'-6" 6' 2'-6" 2'-9" 6' 2'-9"
1'-6"

1'-6"

1'-6"
1'

3'-6" 3'-3" 3' 6' 1'-6" 1'-3" 6' 2'-9" 3'-3" 3'-6" 1'-6" 6' 3' 3'-3" 3'-6"
2'

2'

2'
slab projection
3'

3'

3'
2'

2'

2'
7'0"x3'0" 7'0"x3'0" 7'0"x3'0"
5'

5'

5'

5'
3 2' 2' at first floor level 3 2' 3
12'-3"
location for 11' 12'-3"
2 parapet wall 2 2
1
meter
1 1
WORKING DRAWING SHOWING
6" 7' 6" 6" 7' 6" 6" 7' 6"
up up up OF BUNGALOWS .
8' 8' 8'

D B A
VILLAGE - GHOLWAD TALUKA - DAHANU

ELEVATION-'AA' DISTRICT - PALGHAR FOR.__

RUSTOMJEE TRUST
GROUND FLOOR PLAN OWNER'S SIGNATURE JOB NO._ 860 / 2019
DRAWING NO.- 01 / 01
WORKING DRAWING
DATE :- 05 - 10 - 2019

MAKARAND KARANDIKAR
A R C H I T E C T.
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
DAHANU ROAD DIST. PALGHAR PIN._ 401 602
NOTE :

D
25'-6"
B ELEVATION-'CC' 25'-6"
SCHEDULE OF DOORS :
2' 2' 1'-6" 1'-6" 2' 2' 1'-6" 2' 2'
A
DUCT 4'6" X 2'6" DUCT 4'6" X 2'6" DUCT 4'6" X 2'6"
2'-6"
3'

3'

3'
1'-6" 2' 6' 3'-6" 9" 3'-3" 6' 4'-3" 1' 2' 1'-6" 3'-6" 6' 1' 2' 1'-6"

2'

2'

2'
4'-6"

6" 9"

6" 9"
9"

9"
V 9" V 9" V

9" 6" 1' 2' 1' 1' 2' 1' 6" 1' 2' 1' 6" 9"

2'

2'

2'
4'-6" W6 6' 3' Terrace Terrace 2'-9" 6' W6 4'-3" Terrace 3' 6' W6 4'-6"
2'-6"

2'-6"

2'-6"
4' Toilet SCHEDULE OF WINDOWS :
Toilet 15'0"x12'0" 14'6"x12'0" Toilet 14'11"x12'0"
4'

4'

4'

4'

4'

4'
5'

5'

5'
4'6"x7'6" Bedroom 4'6"x7'6" Bedroom 4'6"x7'6"
Bedroom
WATER TANK above lvl.

WATER TANK above lvl.

WATER TANK above lvl.


2'-9"

2'-9"

2'-9"
13'-3"

13'-3"
13'6"x12'0" 13'0"x12'0" 13'6"x12'0"
W7 pergola above pergola above W7 pergola above W7
7'0"x4'0"x5'0"ht.

7'0"x4'0"x5'0"ht.

7'0"x4'0"x5'0"ht.
2'-6"

2'-6"

2'-6"
12'

12'

12'
2'-3"

9'-9"

2'-3"

2'-3"
9'-9"

9'-9"
4'

4'

4'

4'

4'

4'
D2 in F.R.P. in F.R.P. D2 in F.R.P. D2

ELEVATION-'BB'
as per detail as per detail as per detail
9"

9"

9"
ELEVATION-'DD'

Lift lift lift

3'
4'6"x4'0" 10'-3" 9" 9" 9'-9" 4' 9" 10'-3" 4'
4'

4'

4'

4'

4'

4'

4'

4'
5'

5'

5'
13'-6" 13' 13'-6"
4'6"x4'0" 4'6"x4'0"
6" 3'-6" 6" 10'-6" 10' 6" 3'-6" 6" 10'-6" 6" 3'-6" 6"
9"

9"

9"
D1 D1 D1 D1 D1 D1
1' 6"

1' 6"

1' 6"
9"

1'-6"

1'-6"

1'-6"

9"
9" 9"
6"

6"
1' 3' 11'-3" 3' 3' 10'-9" 3' 1' 3' 11'-3" 3' 1'

32'
4'0" wide 2'-3" 2'-9" 2'-6" 2'-6" 2'-9" 2'-3" 4'0" wide 2'-6" 2'-9" 2'-3" 4'0" wideW3
passage 4'6"wide
4'-6"

4'-6"

4'-6"

4'-6"

4'-6"

4'-6"

4'-6"

4'-6"

4'-6"
W3 Toilet Toilet
6" 2'-6"

6" 2'-6"
landing landing

4'

4'
4'

C passage 4'6"wide Toilet passage 4'6"wide landing C


2'

2'

2'
7'6"x4'6" V V 7'6"x4'6" V
6' 6' 6'
21 dn 6"
7'-6" 7'-6" 3"
2'-9"
6" dn 21
7'-6"
7'6"x4'6" 6" dn 21
1'-6"

1'-6"

1'-6"
3' W4 3'-9" 3' 9" 5' 5' 3' 3'-6" 3' W4 5' 9" 3' 3'-9" W4 3'
1'

1'

1'
6"

6"

6"
1 D2 D2 20 TREAD 110" D2
20 20 TREAD 110"
2' 2 12' 2 12' 2
RISER 6.86" 2'
19 D1 D1 19 RISER 6.86" D1 19
1'

1'

1'

1'

1'
3' 6' 3' 1'-3" 2'-6" 4'-9" 2'-6" 2'-6" 4'-9" 2'-6" 9" 2'-9" 6' 2'-9" 2'-6" 4'-9" 2'-6" 1'-3" 3' 6' 3'
3 TREAD 10"
18
Terrace Terrace
18 3 Terrace 18 3
3'

3'

3'
3" 3" 3"
4 RISER 6.86"
17 17 4 17 4
12'0"x14'0"
7'-6"

7'-6"

7'-6"
5 16 12'0"x14'0" 11'6"x14'0" 16 5 16 5
4'

4'

4'
W7 W7 W7
Bedroom Bedroom
10'-9"

10'-9"

10'-9"
6 6 6
11'-3"

11'-3"
15 15 Bedroom 15
7 14
pergola above 12'0"x14'0" 11'6"x14'0" pergola above 14 7
12'0"x14'0" pergola above 14 7

10'
10'

10'
8 13 13 8 13 8
9 12 in F.R.P. in F.R.P. 12 9 in F.R.P. 12 9
7'

7'

7'
14'-6"

14'-6"

14'-6"
as per detail as per detail as per detail
14'

12'

12'

14'

12'

14'
10 10 10 10 10 10
3' 3' 3' 3' 3' 3'
mid- mid- mid-
3'

3'

3'
9" landing landing landing 9"
9" 9'-3" 2' 2' 8'-9" 9" 2' 9'-3" 9"
2'

8'

2'
9'

9'

9'

9'
9'
7' 7' 7'
2'

2'

2'

2'

2'

2'
4'-6"

4'-6"

4'-6"
11'-6"
3" 3" 3" 3" 3" 3"
6'-6"

6'-6"
9 2'-9" W6 2'-9" 2'-6" W6 2'-6"
10 2'-9" W6 2'-9"
11
1'

1'

1'

1'
2' 2'
6"

6"

6"
2'-6"

2'-6"
3'-3"
3'-6" 6' 3'-6" 3'-3" 6' 3'-6" 6' 3'-6"
2'

2'

2'
12'-6" 12' 12'-6"

32'-9" 31' 32'-9"

WORKING DRAWING SHOWING


ELEVATION-'AA'
OF BUNGALOWS .
A
D B VILLAGE - GHOLWAD TALUKA - DAHANU
FIRST FLOOR PLAN DISTRICT - PALGHAR FOR.__

RUSTOMJEE TRUST
OWNER'S SIGNATURE JOB NO._ 860 / 2019
DRAWING NO.- 01 / 02
WORKING DRAWING
DATE :- 05 - 11 - 2019

MAKARAND KARANDIKAR
A R C H I T E C T.
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
DAHANU ROAD DIST. PALGHAR PIN._ 401 602
NOTE :

SCHEDULE OF DOORS :

D
25'-6"
B ELEVATION-'CC' 25'-6"
A
SCHEDULE OF WINDOWS :
DUCT 4'6" X 2'6" DUCT 4'6" X 2'6" DUCT 4'6" X 2'6"
2'

2'

2'
9"

9"
2'

2'

2'
9" Terrace below Terrace below Terrace below 9"
15'0"x12'0" 15'0"x12'0" 15'0"x12'0"
10'-3" 9'-9" 10'-3"
CAP.- 3500 LTRS

CAP.- 3500 LTRS

CAP.- 3500 LTRS


pergola in F.R.P. pergola in F.R.P. pergola in F.R.P.
7'0"x4'0"x5'0"ht.

7'0"x4'0"x5'0"ht.

7'0"x4'0"x5'0"ht.
WATER TANK

WATER TANK

WATER TANK
9'-9"

9'-9"

9'-9"
PVC / FRP

PVC / FRP

PVC / FRP
as per detail as per detail as per detail

ELEVATION-'BB'
9"

9"
ELEVATION-'DD'

7'-9" 9" 7'-3" 9" 7'-9"


9"

9"

9"
32'

32'
C C

2'
2'-6" 2'-6" 2'-6"
Terrace below Terrace below Terrace below
3'

3'

3'
12'0"x14'0" 12'0"x14'0" 12'0"x14'0"

pergola in F.R.P. pergola in F.R.P. pergola in F.R.P.

10'

10'
as per detail as per detail as per detail
7'

7'

7'
14'-6"

14'-6"

14'-6"
9" 9"
9" 9'-3" 2' 2' 8'-9" 9" 2' 9'-3" 9"
2'

2'
7' 7' 7'
2'

2'

2'
4'-6"

4'-6"

4'-6"
6'-6"

6'-6"
9 10 11 WORKING DRAWING SHOWING
2'-6"

2'-6"
13'
2'

2'

2'
12'-6" 12' 12'-6"
OF BUNGALOWS .
32'-9" 31' 32'-9"
VILLAGE - GHOLWAD TALUKA - DAHANU
ELEVATION-'AA'
DISTRICT - PALGHAR FOR.__
A
D B RUSTOMJEE TRUST
TERRACE FLOOR PLAN OWNER'S SIGNATURE JOB NO._ 860 / 2019
DRAWING NO.- 01 / 02
WORKING DRAWING
DATE :- 06 - 11 - 2019

MAKARAND KARANDIKAR
A R C H I T E C T.
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
DAHANU ROAD DIST. PALGHAR PIN._ 401 602
NOTE :

PVC / FRP PVC / FRP


WATER TANK Terrace floor level : rl +23'0" Terrace floor level : rl +23'0" WATER TANK

6"

6"
3'-6"

3'-6"
5'-6"

5'-6"
W3 W3
13'-3"

1' 1'-6" 6"

1' 1'-6" 6"


First floor level : rl +12'6" First floor level : rl +12'6"
26'-6"

26'-6"
SCHEDULE OF DOORS :

3'-6"

3'-6"
6'

6'
W3 W3 W1 W1 W3 W3
SCHEDULE OF WINDOWS :

6" 1'-6" 2'-6"

6" 1'-6" 2'-6"


Ground floor level : rl +2'0" Ground floor level : rl +2'0"

Finished plot level : rl +6" Finished plot level : rl +6"

ELEVATION-'DD' ELEVATION-'BB'

PVC / FRP PVC / FRP PVC / FRP


WATER TANK WATER TANK WATER TANK Terrace floor level : rl +23'0"

6"
3'-6"

12'
5'-6"
V W6 D1 V W6 D1 D1 W6 V

WORKING DRAWING SHOWING


OF BUNGALOWS .

2'
First floor level : rl +12'6"

1'
VILLAGE - GHOLWAD TALUKA - DAHANU

26'-6"
3'-6"
DISTRICT - PALGHAR FOR.__

RUSTOMJEE TRUST

4'-6"

12'
W5 W5 W5 W5 W5 W5
W4 W4 W4
OWNER'S SIGNATURE JOB NO._ 860 / 2019
DRAWING NO.- 01 / 02

6" 1'-6" 6" 3'-6"


Ground floor level : rl +2'0" WORKING DRAWING
Finished plot level : rl +6" DATE :- 05 - 11 - 2019

MAKARAND KARANDIKAR
A R C H I T E C T.
ELEVATION-'CC' 'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
DAHANU ROAD DIST. PALGHAR PIN._ 401 602
NOTE :

Terrace floor level : rl +23'0"

4'
5'-6"
W4 W6 W6 W4 W6 W4

2'
First floor level : rl +12'6"

1'

26'-6"
SCHEDULE OF DOORS :

3'-6"
6'
W2 MD W6 W6 MD W2 W6 MD W2
SCHEDULE OF WINDOWS :

6" 1'-6" 2'-6"


Ground floor level : rl +2'0"

Finished plot level : rl +6"

ELEVATION-'AA'
SECOND FLOOR LEVEL + 26'0"
PARAPET LEVEL + 26'6"

7'

PVC / FRP PARAPET LEVEL + 26'6"


WATER TANK
5'

5'

SECOND FLOOR LEVEL + 26'0"


7'0"x4'0"x5'0"ht.
3'-6"

3'-6"

4'

4'

4'
4'

4'

CAP.- 3500 LTRS

6"
2' 9" 2' 2'
2'

12'
12'

6'
6'
3'

V W6
D2
8'-6"

8'-6"

8'

8'

8'
6'

1'-6"

7'

W6 W7 W4 W7

26' [7.92M]

2'
Bedroom Passage Terrace
2'

2'-6"
2'-6"
26' [7.92M]

8" 2'-6"

Terrace Toilet Bedroom 9" WORKING DRAWING SHOWING

1'

1'
6"
6"

6"
1'

FIRST FLOOR LEVEL +14'0" FIRST FLOOR LEVEL +14'0"

6"
OF BUNGALOWS .

3'-6"

3'-6"

3'-6"

3'-6"
3'-6"

3'-6"

3'-6"

3'-6"

3'-6"
4'-6"

3'-10"

3' 2' 3' 2'


VILLAGE - GHOLWAD TALUKA - DAHANU
4'-6"

11'-6"
DISTRICT - PALGHAR FOR.__
12'
PLINTH LEVEL +2'0"
12'

W5 D2
3'

6'

6'

V W6
8'-6"

8'-6"

8' W4
MD
RUSTOMJEE TRUST
2'-6" 1'-6"

D2

7'
7'

3'-6"
4'

4'
2'-8"

2'-6"

3'
sit-out Kitchen Toilet Bedroom Sit out Dining Living hall Lobby OWNER'S SIGNATURE JOB NO._ 860 / 2019
verandah
4'

6"
PLINTH LEVEL +2'0"
2' 6"

1'-6"
6"

2' 4' DRAWING NO.- 01 / 02

6"
2' MADE UP PLOT LEVEL +0'6"
MADE UP PLOT LEVEL +0'6"
1'-6"
1'-6"

EXTERNAL ROAD LEVEL +0'0" EXTERNAL ROAD LEVEL +0'0" WORKING DRAWING
DATE :- 05 - 11 - 2019
SECTION-'AA' SECTION-'BB'
MAKARAND KARANDIKAR
A R C H I T E C T.
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
DAHANU ROAD DIST. PALGHAR PIN._ 401 602
NOTE :

PARAPET LEVEL + 26'6"


water proofing layer
SECOND FLOOR LEVEL + 26'0"

2'
3'-6"
4'
2'

12'

12'

12'

3'
W3 V
TREAD NOS- 18+2 STEP MID L.

8'-6"
TREAD WIDTH = 10" TOILET
MID STEP WIDTH = 3'0''
21 NOS RISER

26' [7.92M]
4'
PER RISER HT = 6.86"

2'
FIRST FLOOR LEVEL +14'0"
8" sunk SCHEDULE OF DOORS :
water proofing layer

LIFT
MID-LANDING
SHAFT
4'-6"
3'

11'-6"
12'

12'

13'-6"
W3
SCHEDULE OF WINDOWS :

10'
5'-9"
Parking

3'
PLINTH LEVEL +2'0"

1'-6"
2'
MADE UP PLOT LEVEL +0'6"
EXTERNAL ROAD LEVEL +0'0"

SECTION-'DD'

PARAPET LEVEL + 26'6"


2' 6"

2' 6"
6"

6"
SECOND FLOOR LEVEL + 26'0"

3'

3'
2' 2'
6'

6'
3'

3'

3'
W3 V V W3
12'

12'
W4 D1 D2 W4 D1 D2 D2 D1 W4
8'

8'

8'
10'

10'

10'
8'-6"

8'-6"

8'-6"
5'-6"

5'-6"
Passage
26' [7.92M]

Staircase
4'

4'
Passage Toilet Toilet
2'

2'

2'
FIRST FLOOR LEVEL +14'0"
3'-6"

3'-6"
3'
4'-4"

4'-4"

4'-4"
WORKING DRAWING SHOWING
12'

12'
6'

6'

6'

6'

6'
3'

3'

3'
W3 W2 D1 D2 V W2 D1 D2 V D2 D1 W2 W3
OF BUNGALOWS .
8'-6"

8'-6"

8'-6"
7'

7'

7'
VILLAGE - GHOLWAD TALUKA - DAHANU
4'

4'

4'
2' 6"

2' 6"
2'-6"

2'-6"

2'-6"
6" Staircase Living Toilet Duct Living Toilet Toilet Living Staircase 6"
PLINTH LEVEL +2'0"
DISTRICT - PALGHAR FOR.__

1'-6"
MADE UP PLOT LEVEL +0'6"
1'-6"

EXTERNAL ROAD LEVEL +0'0"


RUSTOMJEE TRUST
SECTION-'CC' OWNER'S SIGNATURE JOB NO._ 860 / 2019
DRAWING NO.- 01 / 02
WORKING DRAWING
DATE :- 06 - 11 - 2019

MAKARAND KARANDIKAR
A R C H I T E C T.
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
DAHANU ROAD DIST. PALGHAR PIN._ 401 602
NOTE :

D B A ELEVATION-'AA'
2' 10'-3" 8' 10'-6" 2' 2' 10'-6" 8' 9' 2' 2' 4' 11'-9" 2'
6" up
7' 6" 6" up
7' 6"
6" 5'up 7'-6"
1 1 1
parapet wall parapet wall location for parapet wall parapet wall parapet wall parapet wall
2 2 2 SCHEDULE OF DOORS :
3 meter 3 3 verandah
5'

5'

5'

5'
slab projection slab projection slab projection slab projection

6'-6"
6'6"x5'0"

2'
at first floor level 7'0"x3'0" at first floor level at first floor level 7'0"x3'0" at first floor level 5'6"x3'0"
2'

2'

2'

2'
3'-6" 3'-3" 3' 6' 1'-6" 3'-9" 1'-6" 4'-6" 1'-6"

2'
1'-6" 6' 3' 3'-6" 3'-3"
1'-6"

1'-6"

14 13 12
9"

1'
MD 2'-9" W6 6' 2'-9" 2'-9" W6 6' 2'-9" MD MD W2

4'-6"
Lobby 3" 3" 3" 3" Lobby SCHEDULE OF WINDOWS :
2'

2'

2'

2'

3'-6"
W1 7'0"x4'0" 7'0"x4'0" W1
1'

1'

3'-6"

1'

1'
7'-9" 4'-6" 4'-6" 13'
4' 6'
2'

4'-6" 4' 3'-6" 4'-6"


3'-3"

3'-3"

3'-3"
14'-6"

14'-6"
W2 W2

13'-9"
9"

14'-6"

14'-6"
14'-6"

14'

14'
12'
9 3' 3' 6" 6" 3' 3' 3' 3' 6"
10

ELEVATION-'BB'
8
11 Living hall
10'-6"
ELEVATION-'DD'

7
12 Bedroom Bedroom 12'0"x14'0"
9'-3"

6
12'0"x14'0" 12'0"x14'0"
7'-3"

14'-6"
14'-6"
5
4
Living
12' hall 12' 2'-6" 2'-6" 12' Living hall
3 12'
D1 8'-6" 1' 8'-9" D1
2 12'0"x14'6" 1'-3" 2' 1'-3" 12'0"x14'6"
12'

1'-3" 2' 1'-3"

2'-6"

9" 2' 1' 6"


9" 3' 8'-9"

1'-6"
6" 1 Toilet Toilet
2'-6"

2'-6"
up up up
9" 2'-6" 9"

7'-6"
37'-6"

D2 D2
6" 2'-6" 6"

7'6"x4'6"

4'-6"
7'6"x4'6" V
C 4'0" wide 4'0" wide 4'0" wide C
4'

4'

4'

2'
W3 V V Toilet

6" 2'-6"
landing landing landing
2'

2'

2'
D2
7'6"x4'6"

3"

1'-6"
1' 4'-6" 7'-6" 7'-6" 4'-6" 1' 1'
6"
1'-6"

Dining Dining
2'-6" 3"

6" 6" 7'-9" 6" 6" 6" 6" 7'


1'

1'

2'-6"
12'0"x9'6" 12'0"x9'6"
4'-6"

4'-6"

4'-6"
4'

lift shaft 9" D1 D1 lift lift


Dining
4'

4'

4'

4'

4'
4'6"x4'0" 4'6"x4'0" 4'6"x4'0"
9"
4'-6" 1'-6" 8' 4'-6" 4'-6" 10'6"x12'0"
1'-6" 2'
9'-6"

9'-6"
Maid's Room+ Maid's room+
6"

6"

6"
2'

Kitchen Kitchen
9'

9'

9'

9'
9"

Utility Utility 6' 7' W5


6'-3"

2' 5'-3" 8'0"x9'0" 6'-3" 8'0"x9'0"


3'-6"

3'-6"

3'-6"

3'-6"
6'

W8

4'

4'
6'6"x9'0" 6'6"x9'0" W8
Kitchen
6'-5" 9" 11'-9"
12' 9" 7'-9" 7'0"x7'6"

7'-6"
6'-6"
1'-6"

1' 4' W5 1'-9"

1'-6"
6' W4 W5 4' W5 1'-5" 1'-4" 4' W5 1' 2' W4

8'
1'

3'
1'

1'

1'
1'

1'
3' 1'-9" 4' 2' 3' 6' 2'-9"

3'

4'-6"
13'-3" 1' 1' 4' 3'-6" 4' 3'-6" 4' 3'-6" 4' 1' 1' 13'
dn dn
4' wide sit out 4' wide sit out 4' W5
W4
4'

4'

1'
1' 4' 6' 2'
WORKING DRAWING SHOWING
16'-6" 1' 1'
3' wide sit out dn OF BUNGALOWS .

3'
15'
15'

18'-6" VILLAGE - GHOLWAD TALUKA - DAHANU


89'-3"
D B A
ELEVATION-'CC' DISTRICT - PALGHAR FOR.__

RUSTOMJEE TRUST
ground floor plan OWNER'S SIGNATURE JOB NO._ 860 / 2019
DRAWING NO.- 01 / 03
WORKING DRAWING
DATE :- 10 - 11 - 2019

MAKARAND KARANDIKAR
A R C H I T E C T.
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
DAHANU ROAD DIST. PALGHAR PIN._ 401 602
NOTE :

D B A

SCHEDULE OF DOORS :

ELEVATION-'AA' 13'

balcony 4'0" wide

4'

4'
m.s. railing on 12" upstand m.s. railing on 12" upstand
12'-6" 3'-6" 6' 3'-6" 3'-6"
3'-6" 6' 3'-6" 12'-6" 6' 3'-6"
SCHEDULE OF WINDOWS :

6"
2'-9" 6' 2'-9"
1'

1'
2'-9" 6' W6 2'-9" W6 W4
4'-6"

4'-6"

4'-6"
3"
8'-6"

slab projection 2'-9" 6' 2'-9" 3"


12' 12' slab projection 12'
at second floor level at second floor level
6'-6" 12'-6"
2'

2'
pergola as per
8'

8'
pergola as per
3'-3"

3'-3"

3'-3"
detail Bedroom

14'-6"

14'-6"
detail
4'

4'
9"

14'

14'

14'

15'
9
3' 3' 3' 3' 3' 3' 12'0"x14'0"
10 10'-6" 1'-6" Bedroom 1'-6" 10'-6" 10
9 9
10
8 8 8
12'0"x14'0"
10'

10'
11'-3"

11 11 11
7
12 Terrace Bedroom 12
7 7
12

ELEVATION-'BB'
6 6 6
12'0"x14'0"
5'-6"

5'-6"
13 12'0"x14'0" 13 13
Terrace
4'

4'
14'-6"
ELEVATION-'DD'

5 W7 W7 5 5
14 14 14
4
15
12'0"x14'0" 15
4 4
15
3
2'-6" 2'-6" 3 3
D1
16 2'-6" 4'-9" 4'-9" 2'-6" 16 16 3' 1'-6" 4' 1'

19'-6"

19'-6"
D1 D1
2' 2 2 2
1 17 17 1 1 17
6"

6"
6" W4 7'-6" 7'-6" W4 1' 2'-6" 5'
1'

1'

1'

1'
18 dn 3' 6' 3'-9" 3' 9" D2 Toilet Toilet D2 9" 3' 3'-9" 6' 3' dn 18 18
dn Toilet
passage 6' 6" D2
2'-6" 6"

6' 6" V V 6" 6' V


4'-6"

4'-6"

4'-6"

4'-6"

4'-6"
passage 7'6"x4'6"
2'

2'

2'

2'
second floor6" level

C 4'0" wide 4'6"wide 7'6"x4'6" 7'6"x4'6" C

4'
W3 4'6"wide 4'0" wide 4'0" wide

at second floor level


landing
slab projection

6" 1'

6" 1'

6" 1'
1' 2'-11" 11'-4" 3' 3' 11'-4" 2'-11" 1' landing landing 1'

2'
9" 9" 2'-6"

slab projection
6"
6" 6" 6" 6"
9"

9"
6" 6" 3' 9'-6" 1'
D1 D1 D1 D1 lift lift
lift shaft D1
4'6"x4'0" 4'6"x4'0"
4'

4'
4'

4'

4'
4'6"x4'0" 4'-6" 9'-9" 9" 9" 9'-9" 4'-6"
9" 4'-6" 4'-6" 4'-6"
pergola as per pergola as per
9"
at

detail detail
9'-9"

9'-9"
Bedroom
13'-3"

2'-6"

2'-6"

2'-6"

11'

12'-6"
D2 D2 D2

12'
4'

4'
W7 W7 13'6"x12'0"
7'-6"

7'-6"

7'-6"
Bedroom Bedroom
Toilet 12'6"x12'0" 12'6"x12'0" Toilet Toilet
5'

5'

5'
4'6"x7'6" 4'6"x7'6"
4'

4'
4'6"x7'6" Terrace Terrace 12'-6"
4'-6" 4'-6" 6' 3' 3' 6' 4'-6" 4'-6" 4'-6" 4'-3" 6' 2' WORKING DRAWING SHOWING
6" 1' 15'0"x12'0" 15'0"x12'0" 2' 1' 6" 6" 1' 2' 1'
2'

2'

2' 1' 1'

1'
W6 W6 W6
OF BUNGALOWS .
6"

6"
9"

9"

V V V
9"
2'

2' 2' 6' 6' 3'-6" 15' 6" 15' 9" 3'-6" 2' 3'-6" 2' 5'-9" 6' 2'-9"
slab projection slab6'projection 6' slab projection
at second floor level at second floor level
VILLAGE - GHOLWAD TALUKA - DAHANU

D
at second floor level
B A
ELEVATION-'CC' DISTRICT - PALGHAR FOR.__

FIRST floor plan RUSTOMJEE TRUST


OWNER'S SIGNATURE JOB NO._ 860 / 2019
DRAWING NO.- 01 / 02
WORKING DRAWING
DATE :- 06 - 11 - 2019

MAKARAND KARANDIKAR
A R C H I T E C T.
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
DAHANU ROAD DIST. PALGHAR PIN._ 401 602
NOTE :

ELEVATION-'AA' SCHEDULE OF DOORS :


balcony 4'0" wide

SCHEDULE OF WINDOWS :
2'

2'
pergola as per pergola as per

14'-6"

14'-6"
4'

4'
detail detail
10'-6" 1'-6" 1'-6" 10'-6"
10'

10'

ELEVATION-'BB'
Terrace below Terrace below
5'-6"

5'-6"
ELEVATION-'DD'

12'0"x14'0" 12'0"x14'0"
2'-6" 2'-6"

water atnk water atnk water atnk


3150 ltrs 3150 ltrs 3150 ltrs
9"

9"
9'-9" 9" 9" 9'-9"

pergola as per pergola as per


4'-6"
9'-9"

9'-9"
detail detail

Terrace below Terrace below


15'0"x12'0" 15'0"x12'0" WORKING DRAWING SHOWING
6"

6"

6" OF BUNGALOWS .

VILLAGE - GHOLWAD TALUKA - DAHANU


ELEVATION-'CC' DISTRICT - PALGHAR FOR.__

RUSTOMJEE TRUST
terrace floor plan OWNER'S SIGNATURE JOB NO._ 860 / 2019
DRAWING NO.- 01 / 03
WORKING DRAWING
DATE :- 10 - 11 - 2019

MAKARAND KARANDIKAR
A R C H I T E C T.
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
DAHANU ROAD DIST. PALGHAR PIN._ 401 602
NOTE :

Terrace floor level : rl +23'0" Terrace floor level : rl +23'

1'-6"
2'

5'
6'

W3 V

1'
1' 1'-6" 6"

2'
First floor level : rl +12'6" First floor level : rl +12'6" SCHEDULE OF DOORS :

1'
23'-6"

23'-6"
2'

2'
4'-6"
W3
W1 W8 W5 V
6'

SCHEDULE OF WINDOWS :

6" 1'-6" 2'-6" 1'-6"


6" 1'-6" 2'-6"

Ground floor level : rl +2'0" Ground floor level : rl +2'0"

Finished plot level : rl +6" Finished plot level : rl +6"

ELEVATION-'DD' ELEVATION-'BB'

Terrace floor level : rl +23'


2'
6'

W4 W4 W6 W6 W4
1' 1'-6" 6"

First floor level : rl +12'6"

23'-6"
2'

WORKING DRAWING SHOWING


OF BUNGALOWS .
6'

W2 MD W2 MD W6 W6 MD W2
VILLAGE - GHOLWAD TALUKA - DAHANU

DISTRICT - PALGHAR FOR.__


6" 1'-6" 2'-6"

Ground floor level : rl +2'0"

Finished plot level : rl +6" RUSTOMJEE TRUST


OWNER'S SIGNATURE JOB NO._ 860 / 2019
ELEVATION-'AA' DRAWING NO.- 01 / 03
WORKING DRAWING
DATE :- 10 - 11 - 2019

MAKARAND KARANDIKAR
A R C H I T E C T.
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
DAHANU ROAD DIST. PALGHAR PIN._ 401 602
NOTE :

Terrace floor level : rl +23'0"


2'
5'

V W6 D1 D1 W6 V V W6
1' 1'-6" 6" 1'

SCHEDULE OF DOORS :
First floor level : rl +12'6"

23'-6"
2'

SCHEDULE OF WINDOWS :
W5 W5 W4
6'

W4 W5 W5 W5 W4
6" 1'-6" 2'-6"

Ground floor level : rl +2'0"

Finished plot level : rl +6"

ELEVATION-'CC'

SECOND FLOOR LEVEL + 23'0"


PARAPET LEVEL + 23'6"
water proofing
laid to slope
PARAPET LEVEL + 23'6"
f.r.p.pergola f.r.p.pergola
2'-6"

2'-6"

2'-6"

2'-6"

2'-6"
r.c.c.facia SECOND FLOOR LEVEL + 23'0"
as per detail as per detail

2'

2'
6"

2' 2' 9" 2'


2'

10'-6"
6'

6'

3'
W6 V
D2

8'-6"

8'-6"
8'

8'

8'

WORKING DRAWING SHOWING

6'
1'-6"
7'
W7 W4 W7 W6
OF BUNGALOWS .
m.s.railing Terrace m.s.railing
2'

2'
Passage Bedroom
2'-6"

2'-6"
4'-6"

8" 2'-6"
upstand Bedroom Toilet Terrace upstand
9" VILLAGE - GHOLWAD TALUKA - DAHANU
1'

1'

1'
6"

6"
6"

FIRST FLOOR LEVEL +12'6" FIRST FLOOR LEVEL +12'6"


6"
2'

2'

2'

2'

2'

2'

2'

2'

2'
DISTRICT - PALGHAR FOR.__

2'-4"

3'
2' 3' 2' 3'

MADE UP PLOT LEVEL +0'6"

PLINTH LEVEL +2'0"


RUSTOMJEE TRUST

4'-6"
D2 W5
6'

6'

3'
W6 V
10'

8'-6"

8'-6"
W4
8'

8'

MD OWNER'S SIGNATURE JOB NO._ 860 / 2019

2'-6" 1'-6"
D2
7'

7'
platform
DRAWING NO.- 01 / 03

4'

4'
2'-8"
2'-6"
3'

Lobby Living hall Dining Sit out Bedroom Toilet Kitchen sit-out WORKING DRAWING
4'

verandah
6"

PLINTH LEVEL +2'0"


2' 6"

6"
1'-6"

8" sunk
DATE :- 10 - 11 - 2019
6"

MADE UP PLOT LEVEL +0'6"


EXTERNAL ROAD LEVEL +0'0" EXTERNAL ROAD LEVEL +0'0"
MAKARAND KARANDIKAR
SECTION-'BB' SECTION-'AA' A R C H I T E C T.
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
DAHANU ROAD DIST. PALGHAR PIN._ 401 602
NOTE :

water proofing
laid to slope
PARAPET LEVEL + 23'6" PARAPET LEVEL + 23'6"
f.r.p.pergola f.r.p.pergola
2'-6"

2'-6"

2'-6"

2'-6"

2'-6"
r.c.c.facia SECOND FLOOR LEVEL + 23'0" SECOND FLOOR LEVEL + 23'0"
as per detail as per detail

2'

2'
6"

2' 2' 9" 2'


2' SCHEDULE OF DOORS :

10'-6"
6'

6'

3'
W6 V
D2

8'-6"

8'-6"
8'

8'

8'

6'
1'-6"
7'
W7 W4 W7 W6

m.s.railing
2'

2'
m.s.railing Terrace Passage Bedroom

2'-6"

2'-6"
4'-6"

8" 2'-6"
Bedroom Toilet Terrace SCHEDULE OF WINDOWS :
upstand 9" upstand
1'

1'

1'
6"

6"
6"

FIRST FLOOR LEVEL +12'6" FIRST FLOOR LEVEL +12'6"


6"
2'

2'

2'

2'

2'

2'

2'

2'

2'
2'-4"

3'
2' 3' 2' 3'

4'-6"
PLINTH LEVEL +2'0"
D2 W5

6'

6'

3'
W6 V
10'

8'-6"

8'-6"
W4
8'

8'
MD

2'-6" 1'-6"
D2
7'

7'
platform

4'

4'
2'-8"
2'-6"
3'

Lobby Living hall Dining Sit out Bedroom Toilet Kitchen sit-out

4'
verandah
6"

PLINTH LEVEL +2'0"

2' 6"

6"
1'-6"

8" sunk
6"

MADE UP PLOT LEVEL +0'6" MADE UP PLOT LEVEL +0'6"


EXTERNAL ROAD LEVEL +0'0" EXTERNAL ROAD LEVEL +0'0"

SECTION-'BB' SECTION-'AA'

PARAPET LEVEL + 23'6"


water proofing layer
2'-6"

2'-6"
SECOND FLOOR LEVEL + 23'0"
2'

2'

2'

WORKING DRAWING SHOWING


10'-6"

10'-6"
3'

V W3
OF BUNGALOWS .
8'-6"

8'-6"

TOILET

TREAD = 12"
RISER = 7" VILLAGE - GHOLWAD TALUKA - DAHANU
4'

9"
FIRST FLOOR LEVEL +12'6" DISTRICT - PALGHAR FOR.__
8" sunk
2'

LIFT
2'

water proofing layer


MID-LANDING
SHAFT
4'-6" 2'
RUSTOMJEE TRUST
OWNER'S SIGNATURE JOB NO._ 860 / 2019
10'-6"

W3
10'
8'-6"

12'

DRAWING NO.- 01 / 03
Parking
5'-3"

WORKING DRAWING
3'

PLINTH LEVEL +2'0"


DATE :- 10 - 11 - 2019
1'-6"

2'

MADE UP PLOT LEVEL +0'6"


MAKARAND KARANDIKAR
EXTERNAL ROAD LEVEL +0'0"
A R C H I T E C T.
SECTION-'DD' 'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
DAHANU ROAD DIST. PALGHAR PIN._ 401 602
REMARKS:-

12 11 12 11
1'-0"
0'-6" 0'-6" 0'-9"
10'-6" 9'-0" 20'-6" 4'-0" 2'-0" 6'-6" 2'-0" 9'-0" 2'-6" 6'-0" 2'-3" 6'-0" 1'-9" 4'-0"

b/chejja chejja@sill lvl


beam

1'-0"

1'-0"
0'-9"

0'-9"

1'-0" 0'-9"

0'-9"
0'-9"

0'-9"

0'-9"

0'-9"
4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"
10 10
STILT STILT 11

4'-9"
4'-0"
1'-9" 6'-0" 1'-9" 1'-6" 6'-0"
10 10
1'-6"

1'-6"

1'-6"

1'-6"

1'-6"

1'-6"
4'-0" 2'-6" 4'-0" 2'-6"

2'-0"
2'-0"
11

5'-0"
12'-3"

0'-9"

6" SUNK BAL.


9'-0" 9'-0" 9'-3" 9'-0"

6" SUNK BAL.


9'-0" 9'-0"

10'-3"
0'-9" 0'-9" 0'-9" 0'-9" 0'-9"

4'-9"

9'-6"

3'-6"
10'-0"
1 1 12 4'-0"

13'-0"

11'-6"
BED

18'-0"
9'-6"
6'-9"

6'-9"
2'-9" 4'-0" 2'-9"

3'-0" 1'-6" 2'-0"


12

13'-0"
8'-3"
BED
1 1 BED

7'-6"
1'-6"
KIT

3'-0"
0'-9"

3'-0" 6'-9"
9'-6"
14'-9"

0'-9"
1'-9" 1'-9" 1'-6" 1'-9" 1'-9"

2'-0"

1'-9" 1'-6" 1'-9" 1'-6"


4'-0" 6'-9" 3'-0" 3'-0" 6'-6"
STILT W.C.

3'-0"

3'-0"
6'-3"

2'-6"
1'-0"
3'-0" 0'-9" 4'-0" 4'-0"

0'-6"
1'-6" 8'-3" 9'-0" 8'-9" 9'-9" 8" sunk 0'-9"
W.C.

3'-0"

3'-0"
7'-11"

0'-9" 1'-3"

2'-6"
1'-6" 4'-0"

1'-9" 1'-9" 1'-6" 1'-9"


0'-9"
3'-0"

2'-0" 2'-6"
8" sunk

7'-6"
BATH

3'-0"
4'-0"

4'-0"
9'-0"

1'-3"
3'-0"
2 9'-6" 5'-6"

2'-0" 2'-6"
1'-3"

2 BATH

10'-6"
5'-6" 8" sunk

4'-0"

8'-3"
LIV KIT

2'-3"
1'-3"
5'-6"
28" sunk

1'-6"
14'-0"
3'-0" 3'-0" 10'-0"

5'-0"
3'-0" STILT STILT 2

4'-6"
11'-0"
4'-6"

2'-9" 4'-0" 2'-9"

11'-0"

12'-6"
6'-8"

1'-0"
3 9'-6"
3'-6"

3'-6"

3'-6"

6'-0" 3'-0" 0'-9"


3 4'-6"
3'-0" 13'-0"
10'-9"

4'-0"

11'-0"

8'-0"

8'-0"
1'-6"

3 LIV

3'-6"

3'-6"

3'-6"
0'-9"
4 3 BED 6'-0" 4'-3" 4'-0" 3'-9"

10'-0"
3 2
3'-0"

9'-9" 4'-0"

11'-6"
4'-6" 9'-0" 0'-9"
4'-0"

4'-0"

4'-0"

13'-0"
4

2'-9"
5'-0"

3'-0"
0'-9" 4'-0"
1'-6"

1'-6"
3'-9"

2'-3"
entrance canopy
10'-9"

UP
10'-0"

4'-9"
1'-6" 6'-0" 1'-6"
3'-3"

12" sunk slab


10'-6" 10'-0" 0'-9"

0'-9"
1 2 3 4 5 6 7 8 9 10

1'-6"
8'-0"
4'-0"

7'-0"
0'-9"
UP

6'-0"
4'-0" 3'-3"
3'-3"

1 2 3 4 5 6 7 8 9 10
DN

4'-0"

7'-0"

7'-0"
4'-0"
1'-6"

2'-3" 6'-0" 2'-3" 14'-6"


4 DN
20 19 18 17 16 15 14 13 12 11
6'-9" 3'-3"
4'-0"

2'-6" 2'-0"
4'-9" beam
4

1'-6"
2'-9"
4'-0" 15'-0" 4'-0"

2'-9"
1

2'-0"

2'-0"
4'-0" 3'-6" 4'-6"
10'-0"

10'-0"

11'-6"

5 5 STILT 9'-0"
9 9

7'-0"
BED 0'-9"

10'-0"

10'-0"
6'-3"

6'-0"

6'-0"

6'-0"
5'-6" 5 0'-9" 5 LIV
9 9
19'-6"

12'-0"
0'-9"

0'-9"

3'-0"
2'-0"

2'-0"
8'-6" 3'-0"

2'-6"
4'-0" 1'-6" 12'-0" 1'-6" 4'-0"

2'-9"
PROPOSED RESIDENTIAL BUILDING

2'-6" 1'-6"
1'-9"
6 6
7'-3"

7'-3"

3'-0"
BATH AT VANGAON FOR

4'-0"
4'-0"
8 8

4'-9"
5'-9"
5'-0"

0'-6"
6 6KIT

4'-0"

7'-6"
5'-6" 0'-9" 8" sunk
MR. SURESHBHAI KANSARA
0'-9"

0'-9"

0'-9"
8 8

4'-6"
8'-0" 3'-6"
W.C.

2'-6"

3'-0"
4'-6"

3'-0"
4'-0"

1'-9"
18'-6"

2'-6"

0'-9"
8" sunk

0'-9"
4'-0" 1'-6" 12'-3" 1'-3" OWNER'S SIGNATURE JOB NO._ 859 / 2019
STILT

3'-0"
5'-3" 3'-0" 6'-0" 2'-0" DRAWING NO.- 01 / 02

0'-9"
9'-9"

9'-9"

0'-9"
10'-6"

4'-9"

6" SUNK BAL.


15'-0"
WORKING DRAWING
7 7

10'-0"
10'-6"
BED

10'-0"
1'-6" 12'-3" 1'-3" DATE :- 17 - 09 - 2019

5'-0"
13'-6"
7 7
4'-9" 4'-0" 4'-9"
MAKARAND KARANDIKAR

1'-0"
4'-0"
15'-0"
A R C H I T E C T.
4'-0" 15'-0"
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
DAHANU ROAD DIST. PALGHAR PIN._ 401 602

GROUND FLOOR PLAN TYPICAL FLOOR PLAN


1

3
2
0'-9" 0'-9"
5'-3" 5'-6" 7'-9" 13'-0"

beam

b/chejja
1'-0"
1'-0"
4'-0"
4'-0"
4'-0"

3'-0"
3'-0"

2'-0"
2'-9"

2
0'-9"
0'-9"

3
1
9'-0"
5'-0"

10'-6"
2'-0"

4
b/chejja

4'-0" 3'-9"

4'-9"

TERRACE
4'-0"

2'-0" 2'-0"

12
12

7
6
5
13'-9"

10'-6" 14'-6" 3'-0" 2'-0" 8'-0" 0'-9"


b/chejja

12'-6"
4'-0"

b/chejja

0'-9"
0'-9"
2'-0" 4'-0"

4'-9"

4'-0"
4'-0"
2'-0"

4'-3"
2'-0"

6
7'-0"

0'-9"

3'-5"
b/chejja

7'-3"

3'-0"
4'-0"
4'-0"

1'-0" 3'-0"

DN

bldg line

7
1'-9"

TERRACE

2'-0"
1'-0"

11
11

7'-7"
TERRACE
6'-9"
6'-6"
3'-6" 1'-0"

11'-3"
7'-0"

10'-6"

TERRACE
20 19 18 17 16 15 14 13 12 11

b/chejja
TERRACE
10

1'-3"

3'-3"
3'-3"
1'-6" 4'-0" 1'-6"

4'-0"
b/chejja

9
1'-9"

4'-3"
4'-3"

1'-0"
1'-0"
1'-0"
3'-6"
3'-6"

4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"
4'-0"

4'-9"

b/chejja
2'-0"
2'-0"

0'-9"
0'-9"

0'-9"
0'-9"
beam

2'-0" 2'-0" 5'-0" 3'-9" 5'-0" 1'-6" 2'-3" 7'-0" 11'-0" 9'-0" 1'-9" 2'-9" 3'-0" 2'-0" 10'-3"
1'-3" 1'-0"

8
9
b/chejja
b/chejja
10

TERRACE FLOOR PLAN


10'-0" 10'-0" 10'-0" 10'-0"

10'-0" 10'-0" 10'-0" 2'-0" 7'-8" 2'-4" 1'-8" 6'-0" 2'-4" 1'-8" 6'-0" 2'-4" 1'-8" 6'-0" 2'-4" 4'-0"
10'-0"

2'-0" 7'-8" 2'-4" 1'-8" 6'-0" 2'-4" 1'-8" 6'-0" 2'-4" 1'-8" 6'-0" 2'-4"

4'-9" 2'-0"

1'-6"
3'-0"
3'-0"
3'-0"
3'-0"

4'-0"
4'-0"
4'-0"
4'-0"

0'-6" 0'-6" 0'-6" 0'-6"


3'-9" 0'-6"
3'-9" 0'-6"
3'-9"
3'-3" 1'-6"

sec 7-7
4'-0"
4'-0"
4'-0"
4'-0"
sec 1-1

3'-9" 3'-9" 3'-9"


2'-0" 3'-3" 2'-0" 3'-3" 2'-0" 3'-3" 2'-0"

2'-0" 3'-3" 2'-0" 3'-3" 2'-0" 3'-3" 2'-0"


m.s railling
m.s railling
m.s railling
beam

beam

m.s railling
m.s railling
m.s railling
beam

0'-4" 0'-4" 0'-4"


0'-8"
0'-6" 10'-0" 10'-0" 10'-0"
10'-0" 2'-0" 0'-8" 2'-0" 0'-8" 2'-8"
6'-6" 6'-6" 6'-6"
0'-4" 0'-4" 0'-4" 1'-2" 1'-2" 1'-2"
0'-8" 2'-0" 7'-8" 2'-4" 4'-0" 2'-6" 2'-4" 4'-0" 2'-6" 2'-4" 4'-0" 2'-6" 2'-4" 4'-0"
10'-0" 10'-0" 10'-0"
10'-0" 2'-0" 0'-8" 2'-0" 0'-8" 2'-8"
6'-6" 6'-6" 6'-6"
1'-2" 1'-2" 1'-2" 2'-0"
2'-0" 7'-8" 2'-4" 4'-0" 2'-6" 2'-4" 4'-0" 2'-6" 2'-4" 4'-0" 2'-6" 2'-4" 4'-0" 2'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"

1'-6"
sec 2-2

2'-0" 5'-0" 1'-4" 2'-4" 2'-8" 5'-0" 2'-4" 5'-0" 1'-4" 2'-4" 2'-8" 5'-0" 2'-4" 2'-0"
0'-6" 0'-6" 0'-6" 1'-0" 0'-4" 1'-0" 0'-4"
4'-0"
4'-0"
4'-0"

sec 8-8
beam

opening as per
opening as per

2'-4" 3'-2" 2'-4" 3'-2" 2'-4" 3'-2" 2'-4" 4'-0"


0'-9"

0'-6" 0'-6" 0'-6"


elevation treatment

0'-6" 0'-6" 0'-6"


elevation treatment

10'-0" 10'-0" 10'-0" 10'-0"

2'-0" 7'-8" 2'-4" 2'-8" 5'-0" 2'-4" 2'-8" 5'-0" 2'-4" 2'-8" 5'-0" 2'-4"
4'-0"
0'-9"
2'-0"
2'-0"
2'-0"

10'-0" 10'-0" 10'-0" 10'-0"


5'-0"
sec 3-3

0'-2" 0'-2" 0'-2" 0'-2" 0'-2" 0'-2"


b/chejja
b/chejja
b/chejja

2'-0" 7'-8" 2'-4" 1'-8" 6'-0" 2'-4" 1'-8" 6'-0" 2'-4" 1'-8" 6'-0" 2'-4" 3'-6" 1'-6"
0'-6" 0'-6" 0'-6"
2'-0"
2'-0"
2'-0"

sec 9-9
0'-9"
0'-9"
0'-9"
0'-9"

2'-4"
beam

0'-2" 0'-2" 0'-2" 0'-2" 0'-2" 0'-2"


b/chejja

b/chejja
b/chejja

0'-6" 0'-6" 0'-6" 10'-0" 10'-0" 10'-0" 10'-0"

2'-0" 7'-8" 2'-4" 1'-8" 6'-0" 2'-4" 1'-8" 6'-0" 2'-4" 1'-8" 6'-0" 2'-4"
4'-0"
1'-6"
2'-0"
2'-0"

0'-9"
0'-9"
0'-9"
0'-9"

2'-4"
2'-4"
sec 4-4

0'-2" 0'-2" 0'-2" 0'-2"


b/chejja

10'-0" 10'-0" 10'-0" 10'-0"


b/chejja

0'-6" 0'-6"
2'-0" 7'-8" 2'-4" 1'-8" 6'-0" 2'-4" 1'-8" 6'-0" 2'-4" 1'-8" 6'-0" 2'-4" 4'-0"

0'-6" 0'-6" 0'-6"


4'-0"
4'-0"
4'-0"
4'-0"

3'-9" 3'-9" 3'-9" 10'-0" 10'-0" 10'-0" 10'-0"


7'-5"

2'-0" 3'-3" 2'-0" 3'-3" 2'-0" 2'-0" 7'-8" 2'-4" 1'-8" 6'-0" 2'-4" 1'-8" 6'-0" 2'-4" 1'-8" 6'-0" 2'-4" 2'-11" 3'-0" 1'-6"
sec 10-10
0'-9"

2'-0" 3'-3"
m.s railling
m.s railling
m.s railling
beam
2'-0"
2'-0"

0'-9"
0'-9"
0'-9"
0'-9"

2'-4"
2'-4"
beam

sec 5-5

0'-2" 0'-2" 0'-2" 0'-2"


b/chejja
b/chejja

0'-6" 0'-6"

10'-0" 10'-0" 10'-0" 10'-0"

2'-0" 7'-8" 2'-4" 1'-8" 6'-0" 2'-4" 1'-8" 6'-0" 2'-4" 1'-8" 6'-0" 2'-4" 4'-0"

10'-0" 10'-0" 10'-0" 10'-0"


5'-11"

2'-0" 7'-8" 2'-4" 3'-8" 4'-0" 2'-4" 3'-8" 4'-0" 2'-4" 3'-8" 4'-0" 2'-4" 4'-5" 1'-6"
0'-9"
1'-0"
1'-0"
1'-0"

2'-4" 1'-2" 6'-0" 3'-0" 6'-0" 3'-3" 6'-0" 5'-10"


b/cheja
b/cheja

0'-6" 0'-6" 0'-6" 0'-6" 0'-6"


0'-3" 0'-6"
sec 11-11
2'-0"
2'-0"

0'-9"
0'-9"
0'-9"
0'-9"

2'-4" 2'-4"
sec 6-6
beam

0'-2" 0'-2" 0'-2" 0'-2"


b/chejja
b/chejja

0'-6" 0'-6"
chejja@ landing lvl
chejja@ landing lvl
REMARKS:-

A R C H I T E C T.
OWNER'S SIGNATURE
AT VANGAON FOR

MAKARAND KARANDIKAR

'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4


MR. SURESHBHAI KANSARA
JOB NO._ 857 / 2019

DAHANU ROAD DIST. PALGHAR PIN._ 401 602


PROPOSED RESIDENTIAL BUILDING

WORKING DRAWING
DATE :- 17 - 09 - 2019
DRAWING NO.- 01 / 03
REMARKS:-

plaster patty

3'-0"

3'-0"

3'-0"

3'-0"

3'-0"
plaster patty 0'-6"

0'-6"
0'-6" 0'-6"

0'-6"

0'-6"

0'-6"
0'-6" 0'-6" 0'-6"

16'-0"
3'-0"

1'-6"
13'-0"

13'-0"

13'-0"

13'-0"

13'-0"

13'-0"
0'-6"

4'-6"
4'-0"

4'-0"
plaster grooves

3'-0"
2'-0" 3'-0"
8'-6"

8'-0"

8'-0"

8'-0"

8'-0"
7'-5"

5'-11"
2'-0"

2'-0" 2'-0" 2'-0"


4'-9"
4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"
0'-9" 0'-9"

3'-0"
0'-9"
2'-0"

0'-2"

0'-2"
2'-0"

2'-0"

2'-0"

2'-0"
0'-2"

0'-6"

0'-6"

0'-2"
2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"
0'-6"

0'-2"

0'-6"

0'-6"

0'-6"

0'-2"
0'-6"
4'-0"

0'-6"
2'-0" 4'-0"
0'-2"

1'-3" b/chejja 2'-0" 1'-0" 2'-0" 1'-0"


0'-6" b/chejja
10'-0"

10'-0"

10'-0"

10'-0"
b/chejja 0'-6" b/chejja b/chejja

0'-6"
5'-8"

b/chejja 1'-9" 1'-9" m.s railling b/chejja


m.s railling m.s railling m.s railling m.s railling 2'-0"
1'-9"
1'-3"
1'-0" 5'-0"

1'-6" 0'-9"
2'-6" 2'-6" 2'-6" 2'-3" 2'-3"
3'-0"
3'-3"

3'-3"

3'-3"

3'-3"

3'-2"
2'-8"

2'-0"
0'-9"

0'-9"

0'-6"
0'-2"

0'-2"
2'-0"

2'-0"

2'-0"

2'-0"
0'-2"

0'-6"

0'-6"

0'-6"

0'-6"

0'-2"
2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"
0'-6"

0'-2"

0'-6"

0'-6"

0'-6"

0'-6"

0'-6"

0'-6"

0'-6"

0'-2"
0'-6"
4'-0"
0'-9"

0'-9"

0'-6"
2'-0" 4'-0"
0'-2"

1'-9" b/chejja 1'-0" b/chejja 1'-3" 2'-0" 1'-0"


1'-3" 0'-9" 0'-6" b/chejja 2'-0"
plaster raised design plaster raised design 1'-0" 0'-6" plaster raised design b/chejja
10'-0"

10'-0"

10'-0"

10'-0"
b/chejja b/chejja 0'-6" b/chejja
5'-0"

1'-9" 0'-6" 0'-6" 0'-6" 0'-6" 0'-6"

0'-6"
5'-8"

b/chejja 1'-9" b/chejja m.s railling b/chejja


m.s railling m.s railling m.s railling m.s railling 2'-0"
1'-3"

1'-9"
5'-0"

1'-6" 2'-6" 0'-9"


2'-6" 2'-6" 2'-3" 2'-3"
3'-0"
3'-3"

3'-3"

3'-3"

3'-3"

3'-2"
2'-8"

2'-0"
0'-9"

0'-9"
2'-4" 1'-0"

0'-6"
0'-2"

0'-2"
2'-0"

2'-0"

2'-0"

2'-0"
0'-2"

0'-6"

0'-6"

0'-6"

0'-6"

0'-2"
2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"
0'-6"

0'-2"

0'-6"

0'-6"

0'-6"

0'-6"

0'-6"

0'-6"

0'-6"

0'-2"
0'-6"
4'-0"
0'-9"

0'-6"
4'-0"
0'-9"

2'-0"
0'-2"

b/chejja 1'-0" b/chejja 1'-3" 2'-0" 1'-0"


1'-3" 0'-9" 0'-6" b/chejja 2'-0"
plaster raised design 1'-0" 0'-6" plaster raised design b/chejja
10'-0"

10'-0"

10'-0"

10'-0"
b/chejja b/chejja 0'-6" b/chejja
5'-0"

0'-6" 0'-6" 0'-6" 0'-6" 0'-6"

0'-6"
5'-8"

b/chejja 1'-9" 1'-9" b/chejja m.s railling b/chejja


m.s railling 1'-9" m.s railling m.s railling m.s railling 2'-0"
1'-3"
1'-0" 5'-0"

1'-6" 2'-6" 2'-3" 2'-3" 0'-9"


2'-6" 2'-6"
3'-0"

3'-8"
3'-3"

3'-3"

3'-3"

3'-3"

3'-2"
2'-8"

2'-0"

1'-8"
0'-9"

0'-9"

0'-6"
2'-0"

2'-0"

2'-0"

2'-0"
2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"

2'-4"
4'-0"
0'-9"

0'-2"
0'-9"

1'-9" 4'-0" 4'-9"


0'-9" entrance canopy
plaster raised design plaster raised design 1'-0" PROPOSED RESIDENTIAL BUILDING
10'-0"

10'-0"

10'-0"

10'-0"
5'-0"

plaster raised design

AT VANGAON FOR
7'-8"

1'-9" 1'-6"
5'-0"

1'-6" 0'-9"
9'-8"

9'-8"

9'-8"
3'-0" 0'-9" 0'-9" 1'-3"
1'-9" 6'-3" 3'-0" 0'-9" 1'-3"
1'-0"

1'-6" 0'-9" 1'-6"


ENTRANCE
MR. SURESHBHAI KANSARA
4'-8"

1'-6"
3'-0"

1'-9"
2'-0"

2'-0"

2'-0"

2'-0"

2'-0"
OWNER'S SIGNATURE JOB NO._ 857 / 2019
DRAWING NO.- 01 / 03
WORKING DRAWING
FRONT ELEVATION SIDE ELEVATION DATE :- 17 - 09 - 2019

MAKARAND KARANDIKAR
A R C H I T E C T.
'KETY NAGAR', GALA NO._1 & 2 BLDG. NO. 4
DAHANU ROAD DIST. PALGHAR PIN._ 401 602