Professional Documents
Culture Documents
Results of Train at Tunnel Exit (Speed 16.6667)
Results of Train at Tunnel Exit (Speed 16.6667)
Head of train
Tail of train
V. X/L = 0.8
2. Velocity contours
Head of train
Tail of train
V. X/L = 0.8
3. Turbulent kinetic energy contours
Top view of train
Tail of train
Turbulent kinetic energy distribution along the train (YZ - Plan)
I. X/L = 0.1
V. X/L = 0.8