NATIONAL TRANSMISSION & DESPATCH CO. LTD,
CHIEF ENGINEER T/LINE DESIGN (NTDC)
No. CED/NTDC/MTL-1/P-147/0.5 Jb — Date: 69/11/2021
Project Director (EHV-!) NTDC
Islamabad
SUBJECT: Contract No. TLS-O6R-2021 :
Detailed Survey and Sub-soil Investigation for 220kV D/C Twin Bundle
Transmission Line from 500/220kV Nowhsera G/S to 220kV Swabi G/S
APPROVAL OF DIGITIZED ROUTE ALIGNMENT REPORT
APPROVAL OF DIGITIZED ROUTE ALLIGNMENT REPORT
Your letter no, 4714-17/CE/EHV-I/ISD dated 15.10.2021 enclosing M/s.
EnMasse, Lahore “Digitized Route Alignment Report”
Toute alignment drawings of subject T/Line route submitted vide letter referred
been checked and the same is hereby approved with the following parameters
Description
Route Length (up to loose point)
Angle Points (excluding terminal location) [a
‘Survey of the T/Line, on the basis of approved route alignment should be initiated
The detailed survey should be carried out in accordance with the requirements
cifications with particular focus on the following:
ppite alignment to reduce the number of angles to the extent possible
isle locations are flexible enough to be shifted within 100m radius
nd profile to be created in PLS-CADD shall be 25m on either side of the
Bey data should be collected carefully to ensure that accurate ground
i Patticularly so where lateral clearance is critical
Bp ove Passes through dense brick kiln region. Maximum effort
tower spotting to avoid passing nearby these brick kilns.
Bir Passes through dense population in some areas where iti
piso involves river crossing, highway crossing and rallway
mended clearances must be maintained.
ee
tan, Tel: +92-42-99202199 Fax. +92-42-99202502
I:ce.tld@ntdc.com pkWi, The transmission line route passes through orange gardens in some areas where it is
fecommended to maintain clearance without tree cutting. Furthermore, maximum
effort must be made during tower spotting to avoid nearby orange gardens.
Moreover, it should be noted that any changes in the route alignment, if any, during detailed
Survey shall be incorporated in the final digitized route alignment drawings.
4)
ma,
(Sajjad Haider See)
Addl, Chief Engineer (T/Line Design) NTOC
(EHV-1) North NTOC, Islamabad
itive Engineer (EHV-I) Peshawar
EnMasse-Decon Consortium, 326-G Ill, Johar Town, Lahore oe
ster file/Relevant file