Professional Documents
Culture Documents
With reference to your letter at Ref-1 above regarding installation of marking stones
at each angle point or only 30 Nos. as per BOQ. In this regard, it is advised to proceed in the
matter for installation of
marking stones at each angle point as per plan & profile approved by
Chief Engineer (T/L Design) Lahore vide letter at Ref-2 above.
CC:
1. Chief Engineer (EHV-I) North, NTDC, Islamabad.
2. Chief Engineer (T/L Design), NTDC, Lahore.
3. Chief Engineer (MP&M), NTDC, Lahore.
4. Executive Engineer (EHV-1) TLC NTDC, Peshawar.
Master file
WAPDA Mega Hydel Projects Complex, Kashmir Chowk, Club Road, Islamabad
TEL: +92-51-9216494, Fax: +92-51-9216495
| pdehvl isd@ntdc.com.pk