You are on page 1of 1

MEGA LIFT IRRIGATION PROJECTS, CLUSTER NO.

-XIII
TRENCHING DETAILS
DI / HDPE PIPE L-SECTION OF AMODI LIFT IRRIGATION SCHEME
MIN 1.0M MIN 1.0M
BRANCH-1/ FROM CH. 0 m TO 1020 m

OD OD
TOTAL LENGTH OF PIPELINE: 1020 m SHEET 1 6
0.15M OD
OD 0.20M 0.20M
0.20M 0.20M

211
213
219 212
90
208
215

BR-86
60
218 AP-2
413.325m

3
217 30

P-
222.14
05 252
J-181 257

BR-3
@69 T
0 332
225 9
P-2

4413
20
216 390

450
.32
BR- 13m

7.O
236

1m
AP-3

480
AP-4 259

@4
596.708m
B

510
86.O
233 R-
563 227 360 235 691.359m 57.5
1 251
4

540
258
J-185

P-5
0 232

570
P-10

T
330 0 30

59060
AP-5

6
566 562
30 P-7

P-2

630
231 740.431m

.71

660
234 90
12 J-183

691
30

BR
291
300 333 0
Proposed

720
331

0.36
250
60

11
0

9
39.58 333

P-
3.74

740
VRB 2

750
292

-1
285 -1 P-4 60

BR-91.O
8
315

780
.43
P-
PH .9

@740m
124
56
90 1 270 2M AP-6

810
BR-37
558

120
60

.46
237 970.732m

840
567 336 249
0 294 2 30
P-3 95 314

90

870
0 229 313
0 12 240 J-18337

60

900
324
150 90 334
8
0 296 52
323
557

930
559

30
15
0
210 BR-94
.OT 0 297

960 3
299 298

970
248

0
30 312

990
322
-191
0
@191m
293
P-1

.7
5J
0 300

102
60 18
0 5 56 306 7 325 326

105
311

191.65

0
60 310
30 AP-1 243 327

108
0
308
0191.649m
301 305 307 BR-

BR-95

111
3 1

0
309 330
90

114
BR
60

0
0
60

117
0
304 332

P-3
-96

120

7 4
0
90 335 30

BR P-2
90 47

0
334 333 329 .3328
5

3
0
12 TA

-8
47 IL

P-32
554
FLOW .35
331
m
DIRECTION
594 553

BR-94;BR-95;BR-96

BR-83;BR-89
BR-1;BV-1

VRB-1

BR-86

BR-37

BR-91
OL-12
344
343
342
341
340
339
338

FLOW 292
291
DIRECTION SR.
290 PARTICULARS SYMBOL SR. PARTICULARS SYMBOL
NO. NO.
289 1 INVERT R.L. OF PIPE 14 SURVEY BOUNDARY
2 H.G.L. 15 SURVEY NUMBER 42
288 3 GROUND LEVEL 16 BORE WELL / WELL
287 4 MAJOR / B T ROAD 17 MAIN DISTRIBUTORY
286 5 CARTRACK / METAL ROAD 18 MINOR
6 BUTTERFLY VALVE 19 SUB MINOR
285 7 AIR VALVE 20 VILLAGE POND FEEDING PIPE LINE
284 8 SCOUR VALVE 21 DISNET NOMENCLATURE RM 1
9 VILLEGE BOUNDARY 22 IRRIGATION WATER OUTLET
283
Datum:282 10 TANK / POND 23 VILLAGE POND WATER OUTLET
11 H T LINE 24 OUTLET NUMBER 23
J-191

J-181

J-185

J-183

J-187
12 VILLAGE AREA 25 JUNCTION NUMBER
Node
R-2

176
13 THRUST/ANCHOR BLOCK 26 CHAK NUMBER & AREA 3.64
12

DI-K7 DI-K7 1. Special crossings such as National Highway crossing, Railway crossing etc. should
Diameter (mm) be got approved from competent authority.
750MM 700MM 2. Other minor crossings and provision of specials shall be as per approved typical drawing.
3. Vertical bends below 10 deg. should be taken care of by bending the pipes during
343.21

55.13 343.11

54.44 343.02

53.46 342.92

54.36 342.83
54.01 342.79
54.64 342.71

52.48 342.58

53.32 342.45

53.63 342.32

53.71 342.19

54.76 342.06

54.62 341.94
341.84
54.46 341.81

53.12 341.69

54.26 341.57

55.35 341.45

54.04 341.33

54.55 341.21

52.07 340.97

51.34 340.85

50.05 340.73

50.28 340.64
51.55 340.59
51.58 340.56

51.68 340.48

51.77 340.31

50.57 340.23

50.44 340.15

49.79 340.07

49.03 339.98
48.73 339.95

48.44 339.83
execution.
58.07 343.4

55.04 343.3

52.74 341.1

50.57 340.4

339.9
HGL (m) 4. The chainages shown in the drawing may vary during execution as per site condition
and field boundaries.
5. Thrust Block and Anchor block locations are tentatively shown. The actual provision
shall be as per approved detailed drawings for Thrust Blocks and Anchor Blocks.
6. Network under flood zone should be executed with precaution against floatation and
Working Pressure (m)
55.3

54.5

48.7
erosion. If necessary, precautionary measures should be taken.
7. The location of the valves shown in the LS is tentative and it shall be decided as per the
ground condition during execution.
8. Scour valve should be placed 0.3 to 0.5 m above the lowest valley point to avoid
Depth of cutting (m) submergence of scour valve.
285.33 283.39 284.13 2.14

288.26 286.33 287.06 2.14

287.91 285.97 286.71 2.14

287.98 286.04 286.78 2.14

288.58 286.64 287.38 2.14

289.46 287.52 288.26 2.14

288.47 286.53 287.27 2.14


191.65 288.77 286.82 287.57 2.15
289.28 287.33 288.07 2.15

290.1 288.16 288.9 2.14

289.13 287.19 287.93 2.14

288.7 286.76 287.5 2.14

288.48 286.54 287.28 2.14

288.91 286.56 287.3 2.55

288.78 286.58 287.32 2.39


413.32 288.66 286.64 287.34 2.22
288.64 286.62 287.35 2.22

288.57 286.63 287.37 2.14

287.31 285.37 286.11 2.14

287.34 285.36 286.1 2.18

287.29 285.35 286.09 2.14

287.98 285.92 286.66 2.26

288.9 286.96 287.7 2.14

289.51 287.57 288.31 2.14

290.68 288.74 289.48 2.14

290.36 288.42 289.16 2.14


740.43 290.77 288.34 289.04 2.63

290.43 288.07 288.8 2.56

289.82 287.89 288.62 2.14

289.66 287.72 288.46 2.14

289.71 287.77 288.51 2.14

290.28 288.34 289.08 2.14

290.96 289.02 289.76 2.14

2.14

291.39 289.45 290.19 2.14


596.71 288.36 286.46 287.16 2.1

290.94 288.24 288.98 2.9

290.5 287.8 288.54 2.9

970.73 291.23 289.33 290.03 2.1


Pipe top RL (m)

291.2 289.26 290


Pipe invert RL (m)

Ground level (m)


XIII

1020
Chainage (m) G VPR ENGINEERS LIMITED
120

150

180

210

240

270

300

330

360

390

420

450

480

510

540

570

630

660

690

720

750

780

810

840

870

900

930

960

990
30

60

90

ENGINEERS LIMITED
0

ALIGNMENT PLAN & L-SECTION DRAWING FOR


BRANCH-1/ FROM CH. 0 m TO 1020 m
AMODI (ID NO-193)

GVPR/OD-13/193/LS/1005
GVPR/OD-13 SHEET 1 OF 6

You might also like