You are on page 1of 3

MOTHER THERESA INSTITUTE OF ENGINEERING & TECHNOLOGY, PALAMANER – 517408

BRANCH:EEE IV B.TECH I SEM I MID EXAMINATIONS SEP-2018 DATE:22-09-18 AN


SUBJECT & Code: ENERGY AUDITING & DEMAND SIDE MANAGEMENT (15A02706) Type: DESCRIPTIVE
Regd. No: Max. Marks: 20

Answer all Questions


1 a. Define Energy Audit?
b. Explain the following i) load profile ii) energy conservation
c. Differentiate Energy Efficient Motors & Standard Motors
d. Define Power Factor? Explain about Power Triangle
e. Define Voltage Unbalance?

2A) Explain in detail about Energy Conservation Schemes with necessary examples
B) Explain in detail about the Energy situation in world.
OR
3A) What is Energy Audit? Explain the different types of Energy Audit in detail.
B) Explain the following:
i) Pie Chart (ii) Energy Index (iii) Cost Index (iv) Sankey Diagram

4 (a) Explain the Constructional features of energy efficient motors with the help of
analyzing the loss distribution in stranded motors.
(b.) A 40 HP motor is having the following duty cycle; 40 hp --15 min,20 hp – 20min, 10
hp – 5 min, stop – 5 min. Is this motor is efficient for its operation? Discuss the
recommendations.
OR
5 (a) Write the different methods of improving power factor.
(b) Explain the need of power factor improvement with a suitable example.

Name of the faculty: S.R KHASIM Dept. of EEE


MOTHER THERESA INSTITUTE OF ENGINEERING & TECHNOLOGY, PALAMANER – 517408
BRANCH:EEE IV B.TECH I SEM I MID EXAMINATIONS SEP-2018 DATE:22-09-18 AN
SUBJECT & Code: ENERGY AUDITING & DEMAND SIDE MANAGEMENT (15A02706) Type: OBJECTIVE
Regd. No: Max. Marks: 10

1 B.E.E works under __________________________. [ ]


A MINISTRY OF POWER, GOVT OF INDIA B MINISTRY OF POWER, GOVT OF A.P
C MINISTRY OF POWER, GOVT OF T.N D MINISTRY OF POWER, GOVT OF U.P
2 The Government has launched a National Campaign on _______. [ ]
A Energy Conservation 2001 B Energy Conservation 2005
C Energy Conservation 2002 D Energy Conservation 2004
3 Energy is a fundamental part of an ________ In controlling energy costs [ ]
A Energy Maintenance Programme(EMP) B Energy Monitoring Programme(EMP)
C Energy Management Programme(EMP) D Energy Conservation Programme(ECP)
4 The objective of energy management includes. [ ]
A Minimising Energy Costs B Minimising Environmental Degradation
C
\
Minimising Energy waste D Minimising Environmental, Energy Costs&waste
5 The duration of preliminary energy audit (PEA) is ___________. [ ]
A Long Time B Short Time C Medium Time D Normal time
6 Sankey diagram shows in graphics ___________. [ ]
A energy input B energy output
C
{
energy balance D energy input, energy input& energy balance
7 ________are the most commonly used prime mover for various equipments in [ ]
industrial applications
A Induction Motors B Synchronous Motors
C A.C Motors D D.C Motors
8 ___losses are major losses and typically account for 55% to 60% of the total [ ]
losses.
A Core Losses B Cu Losses
C Friction & Windage Losses D Total loss
9 Use of more copper and larger conductors increases cross sectional area of [ ]
windings. This lowers resistance (R) of the windings and reduces losses due to
current flow (I). We can reduce _____.
A Core Losses B Cu Losses
C Friction & Windage Losses D Total loss
10 ________penalty or bonus rates, as levied by most utilities, are to contain [ ]
reactive power drawn from grid
A Power Factor B Apparent Power C Real Power D Reactive Power
11 Cost benefits of PF improvement ________ kVA (Maximum demand) charges [ ]
in utility bill and ________ distribution losses (KWH) within the plant network
A Reduced, Reduced B Reduced, Increased
C Increased, Increased D Increased, Reduced
12 In all industrial electrical distribution systems, the major loads are [ ]
A Resistive And Capacitive B Capacitive And Inductive
C Capacitive. D Resistive And Inductive

13 A ____________ is circular chart divided into sectors.


14 Energy is a fundamental part of an ________ In controlling energy costs [ ]
A Energy Maintenance Programme(EMP) B Energy Monitoring Programme(EMP)

C Energy Management Programme(EMP) D Energy Conservation programme(ECP)

15 The Energy Conservation Act, ___came into force with effect from______. [ ]

A 2001, 1st March, 2002 B 2001, 1st March, 2001


C 2002, 1st March, 2001 D 2002, 1st March, 2002

16 The two types of energy audit are _________________

17 The efficiencies of induction motors remain almost constant between __ [ ]


loading
A 50% to 90% B 60% to 80% C 20% to 70% D 50% to 100%
18 _________ targets high energy end use equipments and appliances to lay [ ]
down minimum energy performance standards
A Standards & Rating Scheme B Standards & Billing Scheme
C Standards & Labelling Scheme Both a and b
19 Devices that draw non-sinusoidal currents when a sinusoidal voltage is applied [ ]
create___________.
A Power Factor B Frequency
C Distortion D Harmonics
20 One unit of electricity is equivalent to ___ kcal heat units [ ]
A 860 B 800 C 680 D 806