BILL OF QUANTITY

(BOQ)

PROYEK : PEMBANGUNAN GEDUNG PENDIDIKAN BERBASIS KOMPETENSI SMK SMTI


LOKASI : YOGYAKARTA
PEKERJAAN : PLUMBING
HRG SATUAN JML HARGA
NO. URAIAN PEKERJAAN SAT VOL
Rp. Rp.

A Bangunan Gedung SMK SMTI


BANGUNAN SMK SMTI
1 INSTALASI PIPA AIR BERSIH
- Instalasi Pipa Air Bersih Lt. Dasar
Pipa PVC AW ( 10 kg/cm²)
diameter 40 mm m 5,00 - -
diameter 32 mm + diameter 32 mm (Pipa tegak di shaft) m 93,00 - -
diameter 25 mm (Pipa Looping di Toilet) m 31,00 - -
diameter 20 mm m 27,00 - -
diameter 15 mm m 41,00 - -

Fitting pipa ( Elbow, Tee, Tee reducer, dll ) Ls 1,00 - -


Bobokan & Plesteran kembali Ls 1,00 - -
Test & Commisioning Ls 1,00 - -
- Accessories
Gate Valve diameter 32 mm bh 1,00 - -

- Instalasi Pipa Air Bersih Lt. Satu


Pipa PVC AW ( 10 kg/cm²)
diameter 32 mm (Pipa tegak di shaft) m 8,00 - -
diameter 25 mm (Pipa Looping di Toilet) m 31,00 - -
diameter 20 mm m 27,00 - -
diameter 15 mm m 41,00 - -

Fitting pipa ( Elbow, Tee, Tee reducer, dll ) Ls 1,00 - -


Bobokan & Plesteran kembali Ls 1,00 - -
Test & Commisioning Ls 1,00 - -
- Accessories
Gate Valve diameter 32 mm bh 1,00 - -

- Instalasi Pipa Air Bersih Lt. Dua


Pipa PVC AW ( 10 kg/cm²)
diameter 32 mm (Pipa tegak di shaft) m 8,00 - -
diameter 25 mm (Pipa Looping di Toilet) m 16,00 - -
diameter 20 mm m 9,00 - -
diameter 15 mm m 24,00 - -

Fitting pipa ( Elbow, Tee, Tee reducer, dll ) Ls 1,00 - -


Bobokan & Plesteran kembali Ls 1,00 - -
Test & Commisioning Ls 1,00 - -
- Accessories
Gate Valve diameter 32 mm bh 1,00 - -

Total A.1 -
2 INSTALASI PIPA AIR KOTOR & BEKAS
- Instalasi Pipa Air Kotor & Bekas Lt. Dasar
a. Air Kotor
Pipa PVC AW ( 10 kg/cm²)
diameter 100 mm + diameter 100 mm (Pipa tegak di shaft) m 40,00 - -
diameter 50 mm m 3,00 - -
diameter 40 mm m 1,00 - -

b. Air Bekas
HRG SATUAN JML HARGA
NO. URAIAN PEKERJAAN SAT VOL
Rp. Rp.
Pipa PVC AW ( 10 kg/cm²)
diameter 65 mm + diameter 65 mm (Pipa tegak di shaft) m 32,00 - -
diameter 50 mm m 10,00 - -
diameter 40 mm m 4,00 - -
c. Vent
Pipa PVC AW ( 5 kg/cm² )
diameter 50 mm (Pipa tegak di shaft) m 8,00 - -
diameter 40 mm m 39,00 - -
diameter 32 mm m 15,00 - -

Fitting : Elbow, Tee-Y, Reducer, dll Ls 1,00 - -


Bobokan & Plesteran kembali Ls 1,00 - -
Galian & Urugan Kembali Ls 1,00 - -
Bioseptictank kap.2 m3 bh 2,00 - -
Test & Commisioning Ls 1,00 - -

- Accessories
Floor Drain Ø 50 bh 10,00 - -
Clean Out Ø 100 bh 1,00 - -
Clean Out Ø 65 bh 1,00 - -

- Instalasi Pipa Air Kotor & Bekas Lt. Satu


a. Air Kotor
Pipa PVC AW ( 10 kg/cm²)
diameter 100 mm + diameter 100 mm (Pipa tegak di shaft) m 18,00 - -
diameter 50 mm m 3,00 - -
diameter 40 mm m 1,00 - -

b. Air Bekas
Pipa PVC AW ( 10 kg/cm²)
diameter 65 mm (Pipa tegak di shaft) m 8,00 - -
diameter 50 mm m 21,00 - -
diameter 40 mm m 4,00 - -

c. Vent
Pipa PVC AW ( 5 kg/cm² )
diameter 50 mm (Pipa tegak di shaft) m 8,00 - -
diameter 40 mm m 31,00 - -
diameter 32 mm m 15,00 - -

Fitting : Elbow, Tee-Y, Reducer, dll Ls 1,00 - -


Bobokan & Plesteran kembali Ls 1,00 - -
Test & Commisioning Ls 1,00 - -

- Accessories
Floor Drain Ø 50 bh 10,00 - -
Clean Out Ø 100 bh 1,00 - -
Clean Out Ø 50 bh 3,00 - -

- Instalasi Pipa Air Kotor & Bekas Lt. Dua


a. Air Kotor
Pipa PVC AW ( 10 kg/cm²)
diameter 50 mm m 3,00 - -
diameter 40 mm m 1,00 - -

b. Air Bekas
Pipa PVC AW ( 10 kg/cm²)
diameter 50 mm m 10,00 - -
diameter 40 mm m 1,00 - -
HRG SATUAN JML HARGA
NO. URAIAN PEKERJAAN SAT VOL
Rp. Rp.
c. Vent
Pipa PVC AW ( 5 kg/cm² )
diameter 50 mm (Pipa tegak di shaft) m 8,00 - -
diameter 40 mm m 7,00 - -
diameter 32 mm m 7,00 - -

Fitting : Elbow, Tee-Y, Reducer, dll Ls 1,00 - -


Bobokan & Plesteran kembali Ls 1,00 - -
Test & Commisioning Ls 1,00 - -

- Accessories
Floor Drain Ø 50 bh 5,00 - -
Clean Out Ø 50 bh 2,00 - -

Total A.2 -
4 INSTALASI FIRE FIGHTING UNIT
- Tata Letak Fire Extinguisher
- Fire Extinguisher
a Lantai Dasar
Fire Extinguiser kap.3,5 kg bh 4,00 - -
b Lantai Satu -
Fire Extinguiser kap.3,5 kg bh 4,00 - -
c Lantai Dua
Fire Extinguiser kap.3,5 kg bh 4,00 - -

Total A.4 -

SUB TOTAL -
PEKERJAAN MEKANIKAL

IV. PIPA PVC D

1 Memasang 1 m' Pipa PVC ø 1/2" (15 mm)


Bahan Analisa Harga
1,000 m' Pipa PVC ø 1/2" @ Rp. - = Rp -
35 % Perlengkapan = Rp -
Sub total : = Rp -
Upah Analisa Harga
0,054 Oh Pekerja @ Rp. - = Rp -
0,090 Oh Tukang @ Rp. - = Rp -
0,009 Oh Kepala tukang @ Rp. - = Rp -
0,027 Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

2 Memasang 1 m' Pipa PVC ø 3/4" (20 mm)


Bahan Analisa Harga
1,000 m' Pipa PVC ø 3/4" @ Rp. - = Rp -
35 % Perlengkapan = Rp -
Sub total : = Rp -
Upah Analisa Harga
0,054 Oh Pekerja @ Rp. - = Rp -
0,090 Oh Tukang @ Rp. - = Rp -
0,009 Oh Kepala tukang @ Rp. - = Rp -
0,027 Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

3 Memasang 1 m' Pipa PVC ø 1" (25 mm)


Bahan Analisa Harga
1,000 m' Pipa PVC ø 1" @ Rp. - = Rp -
35 % Perlengkapan = Rp -
Sub total : = Rp -
Upah Analisa Harga
0,054 Oh Pekerja @ Rp. - = Rp -
0,090 Oh Tukang @ Rp. - = Rp -
0,009 Oh Kepala tukang @ Rp. - = Rp -
0,027 Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

4 Memasang 1 m' Pipa PVC ø 1 1/4" (32 mm)


Bahan Analisa Harga
1,000 m' Pipa PVC Med ø 1 1/4" @ Rp. - = Rp -
35 % Perlengkapan = Rp -
Sub total : = Rp -
Upah Analisa Harga
0,108 Oh Pekerja @ Rp. - = Rp -
0,180 Oh Tukang @ Rp. - = Rp -
0,018 Oh Kepala tukang @ Rp. - = Rp -
0,0054 Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

5 Memasang 1 m' Pipa PVC ø 1 1/2" (40 mm)


Bahan Analisa Harga
1,000 m' Pipa Pipa PVC ø 1 1/2" @ Rp. - = Rp -
35 % Perlengkapan = Rp -
Sub total : = Rp -
Upah Analisa Harga
0,108 Oh Pekerja @ Rp. - = Rp -
0,180 Oh Tukang @ Rp. - = Rp -
0,018 Oh Kepala tukang @ Rp. - = Rp -
0,0054 Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

6 Memasang 1 m' Pipa PVC ø 2" (50 mm)


Bahan Analisa Harga
1,000 m' Pipa PVC ø 2" @ Rp. - = Rp -
35 % Perlengkapan = Rp -
Sub total : = Rp -
Upah Analisa Harga
0,108 Oh Pekerja @ Rp. - = Rp -
0,180 Oh Tukang @ Rp. - = Rp -
0,018 Oh Kepala tukang @ Rp. - = Rp -
0,0054 Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

6 Memasang 1 m' Pipa PVC ø 2-1/2" (80 mm)


Bahan Analisa Harga
1,000 m' Pipa PVC ø 2-1/2" @ Rp. - = Rp -
35 % Perlengkapan = Rp -
Sub total : = Rp -
Upah Analisa Harga
0,108 Oh Pekerja @ Rp. - = Rp -
0,180 Oh Tukang @ Rp. - = Rp -
0,018 Oh Kepala tukang @ Rp. - = Rp -
0,0054 Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -
PEKERJAAN MEKANIKAL

IV. PIPA PVC AW

1 Memasang 1 m' Pipa PVC ø 1/2" (15 mm)


Bahan Analisa Harga
1,000 m' Pipa PVC ø 1/2" @ Rp. - = Rp -
35 % Perlengkapan = Rp -
Sub total : = Rp -
Upah Analisa Harga
0,054 Oh Pekerja @ Rp. - = Rp -
0,090 Oh Tukang @ Rp. - = Rp -
0,009 Oh Kepala tukang @ Rp. - = Rp -
0,027 Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

2 Memasang 1 m' Pipa PVC ø 3/4" (20 mm)


Bahan Analisa Harga
1,000 m' Pipa PVC ø 3/4" @ Rp. - = Rp -
35 % Perlengkapan = Rp -
Sub total : = Rp -
Upah Analisa Harga
0,054 Oh Pekerja @ Rp. - = Rp -
0,090 Oh Tukang @ Rp. - = Rp -
0,009 Oh Kepala tukang @ Rp. - = Rp -
0,027 Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

3 Memasang 1 m' Pipa PVC ø 1" (25 mm)


Bahan Analisa Harga
1,000 m' Pipa PVC ø 1" @ Rp. - = Rp -
35 % Perlengkapan = Rp -
Sub total : = Rp -
Upah Analisa Harga
0,054 Oh Pekerja @ Rp. - = Rp -
0,090 Oh Tukang @ Rp. - = Rp -
0,009 Oh Kepala tukang @ Rp. - = Rp -
0,027 Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

4 Memasang 1 m' Pipa PVC ø 1 1/4" (32 mm)


Bahan Analisa Harga
1,000 m' Pipa PVC Med ø 1 1/4" @ Rp. - = Rp -
35 % Perlengkapan = Rp -
Sub total : = Rp -
Upah Analisa Harga
0,108 Oh Pekerja @ Rp. - = Rp -
0,180 Oh Tukang @ Rp. - = Rp -
0,018 Oh Kepala tukang @ Rp. - = Rp -
0,0054 Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

5 Memasang 1 m' Pipa PVC ø 1 1/2" (40 mm)


Bahan Analisa Harga
1,000 m' Pipa Pipa PVC ø 1 1/2" @ Rp. - = Rp -
35 % Perlengkapan = Rp -
Sub total : = Rp -
Upah Analisa Harga
0,108 Oh Pekerja @ Rp. - = Rp -
0,180 Oh Tukang @ Rp. - = Rp -
0,018 Oh Kepala tukang @ Rp. - = Rp -
0,0054 Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

6 Memasang 1 m' Pipa PVC ø 2" (50 mm)


Bahan Analisa Harga
1,000 m' Pipa PVC ø 2" @ Rp. - = Rp -
35 % Perlengkapan = Rp -
Sub total : = Rp -
Upah Analisa Harga
0,108 Oh Pekerja @ Rp. - = Rp -
0,180 Oh Tukang @ Rp. - = Rp -
0,018 Oh Kepala tukang @ Rp. - = Rp -
0,0054 Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

7 Memasang 1 m' Pipa PVC ø 2,5" (65 mm)


Bahan Analisa Harga
1,000 m' Pipa PVC ø 2,5" @ Rp. - = Rp -
20 % Perlengkapan = Rp -
Sub total : = Rp -
Upah Analisa Harga
0,135 Oh Pekerja @ Rp. - = Rp -
0,225 Oh Tukang @ Rp. - = Rp -
0,0225 Oh Kepala tukang @ Rp. - = Rp -
0,0068 Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

8 Memasang 1 m' Pipa PVC ø 3" (80 mm)


Bahan Analisa Harga
1,000 m' Pipa PVC ø 3" @ Rp. - = Rp -
20 % Perlengkapan = Rp -
Sub total : = Rp -
Upah Analisa Harga
0,135 Oh Pekerja @ Rp. - = Rp -
0,225 Oh Tukang @ Rp. - = Rp -
0,0225 Oh Kepala tukang @ Rp. - = Rp -
0,0068 Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -
9 Memasang 1 m' Pipa PVC ø 4" (100 mm)
Bahan Analisa Harga
1,000 m' Pipa PVC ø 4" @ Rp. - = Rp -
35 % Perlengkapan = Rp -
Sub total : = Rp -
Upah Analisa Harga
0,135 Oh Pekerja @ Rp. - = Rp -
0,225 Oh Tukang @ Rp. - = Rp -
0,0225 Oh Kepala tukang @ Rp. - = Rp -
0,0068 Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

10 Memasang 1 m' Pipa PVC ø 6" (150 mm)


Bahan Analisa Harga
1,000 m' Pipa PVC ø 6" @ Rp. - = Rp -
35 % Perlengkapan = Rp -
Sub total : = Rp -
Upah Analisa Harga
0,135 Oh Pekerja @ Rp. - = Rp -
0,225 Oh Tukang @ Rp. - = Rp -
0,0225 Oh Kepala tukang @ Rp. - = Rp -
0,0068 Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

11 Memasang 1 m' Pipa PVC ø 8" (200 mm)


Bahan Analisa Harga
1,000 m' Pipa Pipa PVC ø 8" @ Rp. - = Rp -
35 % Perlengkapan = Rp -
Sub total : = Rp -
Upah Analisa Harga
0,135 Oh Pekerja @ Rp. - = Rp -
0,225 Oh Tukang @ Rp. - = Rp -
0,0225 Oh Kepala tukang @ Rp. - = Rp -
0,0068 Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

12 Memasang 1 m' Pipa PVC ø 10" (250 mm)


Bahan Analisa Harga
1,000 m' Pipa PVC ø 10" @ Rp. - = Rp -
35 % Perlengkapan = Rp -
Sub total : = Rp -
Upah Analisa Harga
0,135 Oh Pekerja @ Rp. - = Rp -
0,225 Oh Tukang @ Rp. - = Rp -
0,0225 Oh Kepala tukang @ Rp. - = Rp -
0,0068 Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -
PEKERJAAN PLUMBING

II. Memasang 1 Buah Floor Drain & CLEAN OUT

- Memasang 1 Buah Floor Drain


Bahan An. SNI T-15-2002
1,000 bh Floor Drain @ Rp. - = Rp -

Sub total : = Rp -
Upah An. SNI ( Revisi ) 6.17.2
Oh Pekerja @ Rp. - = Rp -
0,100 Oh Tukang @ Rp. - = Rp -
0,010 Oh Kepala tukang @ Rp. - = Rp -
Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

- Memasang 1 Buah Clean Out 50 mm


Bahan An. SNI T-15-2002
1,000 bh Clean Out @ Rp. - = Rp -

Sub total : = Rp -
Upah An. SNI ( Revisi ) 6.17.2
Oh Pekerja @ Rp. - = Rp -
0,100 Oh Tukang @ Rp. - = Rp -
0,010 Oh Kepala tukang @ Rp. - = Rp -
Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

- Memasang 1 Buah Clean Out 65 mm


Bahan An. SNI T-15-2002
1,000 bh Clean Out @ Rp. - = Rp -

Sub total : = Rp -
Upah An. SNI ( Revisi ) 6.17.2
Oh Pekerja @ Rp. - = Rp -
0,100 Oh Tukang @ Rp. - = Rp -
0,010 Oh Kepala tukang @ Rp. - = Rp -
Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

- Memasang 1 Buah Clean Out 80 mm


Bahan An. SNI T-15-2002
1,000 bh Clean Out @ Rp. - = Rp -

Sub total : = Rp -
Upah An. SNI ( Revisi ) 6.17.2
Oh Pekerja @ Rp. - = Rp -
0,100 Oh Tukang @ Rp. - = Rp -
0,010 Oh Kepala tukang @ Rp. - = Rp -
Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

- Memasang 1 Buah Clean Out 100 mm


Bahan An. SNI T-15-2002
1,000 bh Clean Out @ Rp. - = Rp -

Sub total : = Rp -
Upah An. SNI ( Revisi ) 6.17.2
Oh Pekerja @ Rp. - = Rp -
0,100 Oh Tukang @ Rp. - = Rp -
0,010 Oh Kepala tukang @ Rp. - = Rp -
Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

- Memasang 1 Buah Clean Out 150 mm


Bahan An. SNI T-15-2002
1,000 bh Clean Out @ Rp. - = Rp -

Sub total : = Rp -
Upah An. SNI ( Revisi ) 6.17.2
Oh Pekerja @ Rp. - = Rp -
0,100 Oh Tukang @ Rp. - = Rp -
0,010 Oh Kepala tukang @ Rp. - = Rp -
Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

- Memasang 1 Buah Clean Out 50 mm (CCO PVC)


Bahan An. SNI T-15-2002
1,000 bh Clean Out @ Rp. - = Rp -

Sub total : = Rp -
Upah An. SNI ( Revisi ) 6.17.2
Oh Pekerja @ Rp. - = Rp -
0,100 Oh Tukang @ Rp. - = Rp -
0,010 Oh Kepala tukang @ Rp. - = Rp -
Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

- Memasang 1 Buah Clean Out 65 mm (CCO PVC)


Bahan An. SNI T-15-2002
1,000 bh Clean Out @ Rp. - = Rp -

Sub total : = Rp -
Upah An. SNI ( Revisi ) 6.17.2
Oh Pekerja @ Rp. - = Rp -
0,100 Oh Tukang @ Rp. - = Rp -
0,010 Oh Kepala tukang @ Rp. - = Rp -
Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

- Memasang 1 Buah Clean Out 80 mm (CCO PVC)


Bahan An. SNI T-15-2002
1,000 bh Clean Out @ Rp. - = Rp -

Sub total : = Rp -
Upah An. SNI ( Revisi ) 6.17.2
Oh Pekerja @ Rp. - = Rp -
0,100 Oh Tukang @ Rp. - = Rp -
0,010 Oh Kepala tukang @ Rp. - = Rp -
Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

- Memasang 1 Buah Clean Out 100 mm (CCO PVC)


Bahan An. SNI T-15-2002
1,000 bh Clean Out @ Rp. - = Rp -

Sub total : = Rp -
Upah An. SNI ( Revisi ) 6.17.2
Oh Pekerja @ Rp. - = Rp -
0,100 Oh Tukang @ Rp. - = Rp -
0,010 Oh Kepala tukang @ Rp. - = Rp -
Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

- Memasang 1 Buah Roof Drain 100 mm Cast Iron


Bahan An. SNI T-15-2002
1,000 bh RD 100 @ Rp. - = Rp -

Sub total : = Rp -
Upah An. SNI ( Revisi ) 6.17.2
Oh Pekerja @ Rp. - = Rp -
0,100 Oh Tukang @ Rp. - = Rp -
0,010 Oh Kepala tukang @ Rp. - = Rp -
Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

- Memasang 1 Buah Roof Drain 150 mm Cast Iron


Bahan An. SNI T-15-2002
1,000 bh RD 150 @ Rp. - = Rp -

Sub total : = Rp -
Upah An. SNI ( Revisi ) 6.17.2
Oh Pekerja @ Rp. - = Rp -
0,100 Oh Tukang @ Rp. - = Rp -
0,010 Oh Kepala tukang @ Rp. - = Rp -
Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

- Memasang 1 Buah Clean Out 150 mm (CCO PVC)


Bahan An. SNI T-15-2002
1,000 bh Clean Out @ Rp. - = Rp -

Sub total : = Rp -
Upah An. SNI ( Revisi ) 6.17.2
Oh Pekerja @ Rp. - = Rp -
0,100 Oh Tukang @ Rp. - = Rp -
0,010 Oh Kepala tukang @ Rp. - = Rp -
Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

- Memasang 1 Grease Trap Stainless Steel


Bahan An. SNI T-15-2002
1,000 bh Clean Out @ Rp. - = Rp -

Sub total : = Rp -
Upah An. SNI ( Revisi ) 6.17.2
Oh Pekerja @ Rp. - = Rp -
0,100 Oh Tukang @ Rp. - = Rp -
0,010 Oh Kepala tukang @ Rp. - = Rp -
Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -

- Memasang 1 Sumur Resapan


Bahan An. SNI T-15-2002
1,000 bh Sumur resapan @ Rp. - = Rp -

Sub total : = Rp -
Upah An. SNI ( Revisi ) 6.17.2
3,200 Oh Pekerja @ Rp. - = Rp -
1,015 Oh Tukang @ Rp. - = Rp -
0,002 Oh Kepala tukang @ Rp. - = Rp -
0,002 Oh Mandor @ Rp. - = Rp -
Sub total : = Rp -
Total upah+bahan : = Rp -
DAFTAR HARGA BAHAN BANGUNAN
HARGA
Kelompok NO. NAMA / JENIS BAHAN SATUAN
SATUAN BAHAN
1 2 3 4 5
A BAHAN PIPA BESI BSP SCH.40
1 Pipa BSP sch. 40 1/2" (15 mm) M' Rp. -
2 Pipa BSP sch. 40 3/4" (20 mm) M' Rp. -
3 Pipa BSP sch. 40 1" (25 mm) M' Rp. -
4 Pipa BSP sch. 40 1 1/4" (32 mm) M' Rp. -
5 Pipa BSP sch. 40 1 1/2" (40 mm) M' Rp. -
6 Pipa BSP sch. 40 2" (50 mm) M' Rp. -
7 Pipa BSP sch. 40 2,5" (65 mm) M' Rp. -
8 Pipa BSP sch. 40 3" (80 mm) M' Rp. -
9 Pipa BSP sch. 40 4" (100 mm) M' Rp. -
10 Pipa BSP sch. 40 6" (150 mm) M' Rp. -
11 Pipa BSP sch. 40 8" (200 mm) M' Rp. -
12 Pipa BSP sch. 40 10" (250 mm) M' Rp. -
13 Pipa BSP sch. 40 12" (300 mm) M' Rp. -
D BAHAN PIPA PVC AW -
1 Pipa PVC AW 1/2" (15 mm) M' Rp. -
2 Pipa PVC AW 3/4" (20 mm) M' Rp. -
3 Pipa PVC AW 1" (25 mm) M' Rp. -
4 Pipa PVC AW 1,25" (32 mm) M' Rp. -
5 Pipa PVC AW 1,5" (40 mm) M' Rp. -
6 Pipa PVC AW 2" (50 mm) M' Rp. -
7 Pipa PVC AW 2,5" (65 mm) M' Rp. -
8 Pipa PVC AW 3" (80 mm) M' Rp. -
9 Pipa PVC AW 4" (100 mm) M' Rp. -
10 Pipa PVC AW 6" (150 mm) M' Rp. -
11 Pipa PVC AW 8" (200 mm) M' Rp. -
12 Pipa PVC AW 10" (250 mm) M' Rp. -
E BAHAN PIPA PPR.PN-10 -
1 Pipa PPR.PN-10 1/2" M' Rp. -
2 Pipa PPR.PN-10 3/4" M' Rp. -
3 Pipa PPR.PN-10 1" M' Rp. -
4 Pipa PPR.PN-10 1,25" M' Rp. -
5 Pipa PPR.PN-10 1,5" M' Rp. -
6 Pipa PPR.PN-10 2" M' Rp. -
7 Pipa PPR.PN-10 2,5" M' Rp. -
8 Pipa PPR.PN-10 3" M' Rp. -
9 Pipa PPR.PN-10 4" M' Rp. -
10 Pipa PPR.PN-10 6" M' Rp. -
F BAHAN PIPA PPR.PN-20 -
1 Pipa PPR.PN-20 1/2" M' Rp. -
2 Pipa PPR.PN-20 3/4" M' Rp. -
3 Pipa PPR.PN-20 1" M' Rp. -
4 Pipa PPR.PN-20 1,25" M' Rp. -
5 Pipa PPR.PN-20 1,5" M' Rp. -
6 Pipa PPR.PN-20 2" M' Rp. -
7 Pipa PPR.PN-20 2,5" M' Rp. -
HARGA
Kelompok NO. NAMA / JENIS BAHAN SATUAN
SATUAN BAHAN
1 2 3 4 5
8 Pipa PPR.PN-20 3" M' Rp. -
9 Pipa PPR.PN-20 4" M' Rp. -
10 Pipa PPR.PN-20 6" M' Rp. -
D BAHAN PIPA PVC D -
1 Pipa PVC AW 1/2" (15 mm) M' Rp. -
2 Pipa PVC AW 3/4" (20 mm) M' Rp. -
3 Pipa PVC AW 1" (25 mm) M' Rp. -
4 Pipa PVC AW 1,25" (32 mm) M' Rp. -
5 Pipa PVC AW 1,5" (40 mm) M' Rp. -
6 Pipa PVC AW 2" (50 mm) M' Rp. -
7 Pipa PVC AW 2-1/2" (80 mm) M' Rp. -
E ACCESSORIES AIR BERSIH (Jis 10-K) -
I Gate Valve -
1 Gate Valve Ø 15 mm (Bronze) Bh Rp. -
2 Gate Valve Ø 20 mm (Bronze) Bh Rp. -
3 Gate Valve Ø 25 mm (Bronze) Bh Rp. -
4 Gate Valve Ø 32 mm (Bronze) Bh Rp. -
5 Gate Valve Ø 40 mm (Bronze) Bh Rp. -
6 Gate Valve Ø 50 mm (Bronze) Bh Rp. -
7 Gate Valve Ø 65 mm (Bronze) Bh Rp. -
8 Gate Valve Ø 80 mm (Cast Iron) Bh Rp. -
9 Gate Valve Ø 100 mm (Cast Iron) Bh Rp. -
10 Gate Valve Ø 150 mm (Cast Iron) Bh Rp. -
II Check Valve -
1 Check Valve Ø 15 mm (Bronze) Bh Rp. -
2 Check Valve Ø 20 mm (Bronze) Bh Rp. -
3 Check Valve Ø 25 mm (Bronze) Bh Rp. -
4 Check Valve Ø 32 mm (Bronze) Bh Rp. -
5 Check Valve Ø 40 mm (Bronze) Bh Rp. -
6 Check Valve Ø 50 mm (Bronze) Bh Rp. -
7 Check Valve Ø 65 mm (Cast Iron) Bh Rp. -
8 Check Valve Ø 80 mm (Cast Iron) Bh Rp. -
9 Check Valve Ø 100 mm (Cast Iron) Bh Rp. -
10 Check Valve Ø 150 mm (Cast Iron) Bh Rp. -
III Strainer -
1 Strainer Ø 15 mm (Bronze) Bh Rp. -
2 Strainer Ø 20 mm (Bronze) Bh Rp. -
3 Strainer Ø 25 mm (Bronze) Bh Rp. -
4 Strainer Ø 32 mm (Bronze) Bh Rp. -
5 Strainer Ø 40 mm (Bronze) Bh Rp. -
6 Strainer Ø 50 mm (Bronze) Bh Rp. -
7 Strainer Ø 65 mm (Cast Iron) Bh Rp. -
8 Strainer Ø 80 mm (Cast Iron) Bh Rp. -
9 Strainer Ø 100 mm (Cast Iron) Bh Rp. -
10 Strainer Ø 150 mm (Cast Iron) Bh Rp. -
IV Fleksible Joint -
1 Fleksible Joint Ø 15 mm Bh Rp. -
2 Fleksible Joint Ø 20 mm Bh Rp. -
HARGA
Kelompok NO. NAMA / JENIS BAHAN SATUAN
SATUAN BAHAN
1 2 3 4 5
3 Fleksible Joint Ø 25 mm Bh Rp. -
4 Fleksible Joint Ø 32 mm Bh Rp. -
5 Fleksible Joint Ø 40 mm Bh Rp. -
6 Fleksible Joint Ø 50 mm Bh Rp. -
7 Fleksible Joint Ø 65 mm Bh Rp. -
8 Fleksible Joint Ø 80 mm Bh Rp. -
9 Fleksible Joint Ø 100 mm Bh Rp. -
10 Fleksible Joint Ø 150 mm Bh Rp. -
V Pressure Reducing Valve -
1 Pressure Reducing Valve Ø 15 mm Bh Rp. -
2 Pressure Reducing Valve Ø 20 mm Bh Rp. -
3 Pressure Reducing Valve Ø 25 mm Bh Rp. -
4 Pressure Reducing Valve Ø 32 mm Bh Rp. -
5 Pressure Reducing Valve Ø 40 mm Bh Rp. -
6 Pressure Reducing Valve Ø 50 mm Bh Rp. -
7 Pressure Reducing Valve Ø 65 mm Bh Rp. -
8 Pressure Reducing Valve Ø 80 mm Bh Rp. -
9 Pressure Reducing Valve Ø 100 mm Bh Rp. -
10 Pressure Reducing Valve Ø 150 mm Bh Rp. -
VII Clean Out (PVC) Ceiling CO -
1 Clean Out (Brass) Ø 50 mm Bh Rp. -
2 Clean Out (Brass) Ø 65 mm Bh Rp. -
3 Clean Out (Brass) Ø 80 mm Bh Rp. -
4 Clean Out (Brass) Ø 100 mm Bh Rp. -
5 Clean Out (Brass) Ø 150 mm Bh Rp. -
VII Clean Out (Brass) Floor CO -
1 Clean Out (PVC) Ø 50 mm Bh Rp. -
2 Clean Out (PVC) Ø 65 mm Bh Rp. -
3 Clean Out (PVC) Ø 80 mm Bh Rp. -
4 Clean Out (PVC) Ø 100 mm Bh Rp. -
5 Clean Out (PVC) Ø 150 mm Bh Rp. -
VIII Pressure Gauge -
1 Pressure Gauge 0 s/d 8 Bar Bh Rp. -
2 Pressure Gauge 0 s/d 10 Bar Bh Rp. -
3 Pressure Gauge 0 s/d 25 Bar Bh Rp. -
IX Water Level Control -
1 Water Level Control c/w cable Bh Rp. -
X Floating Valve -
1 Floating Valve Ø 50 mm Bh Rp. -
2 Floating Valve Ø 65 mm Bh Rp. -
XI Ball Valve -
1 Ball Valve Ø 15 mm (Bronze) Bh Rp. -
2 Ball Valve Ø 20 mm (Bronze) Bh Rp. -
3 Ball Valve Ø 25 mm (Bronze) Bh Rp. -
4 Ball Valve Ø 32 mm (Bronze) Bh Rp. -
5 Ball Valve Ø 40 mm (Bronze) Bh Rp. -
6 Ball Valve Ø 50 mm (Bronze) Bh Rp. -
7 Ball Valve Ø 65 mm (Bronze) Bh Rp. -
HARGA
Kelompok NO. NAMA / JENIS BAHAN SATUAN
SATUAN BAHAN
1 2 3 4 5
XII Floor Drain -
1 Floor Drain Bh Rp. -
XIII Water Meter -
1 Water Meter diameter 2" Bh Rp. -
XIV GREASE TRAP -
1 Floor Mounted Grease Intercepror Bh Rp. -
XV ROOF DRAIN CAST IRON -
1 Diameter 100 mm Bh Rp. -
2 Diameter 150 mm Bh Rp. -
-
F ACCESSORIES HYDRANT -
Gate Valve Cast Iron (16 Bar) -
1 Gate Valve Ø 40 mm Bh Rp. -
2 Gate Valve Ø 50 mm Bh Rp. -
3 Gate Valve Ø 65 mm Bh Rp. -
4 Gate Valve Ø 80 mm Bh Rp. -
5 Gate Valve Ø 100 mm Bh Rp. -
6 Gate Valve Ø 150 mm Bh Rp. -
7 Gate Valve Ø 200 mm Bh Rp. -
II Check Valve (16 Bar) -
1 Check Valve Ø 50 mm Bh Rp. -
2 Check Valve Ø 65 mm Bh Rp. -
3 Check Valve Ø 80 mm Bh Rp. -
4 Check Valve Ø 100 mm Bh Rp. -
5 Check Valve Ø 150 mm Bh Rp. -
6 Check Valve Ø 200 mm Bh Rp. -
III Strainer -
1 Strainer Ø 50 mm Bh Rp. -
2 Strainer Ø 65 mm Bh Rp. -
3 Strainer Ø 80 mm Bh Rp. -
4 Strainer Ø 100 mm Bh Rp. -
5 Strainer Ø 150 mm Bh Rp. -
6 Strainer Ø 200 mm Bh Rp. -
IV Fleksible Joint (16 Bar) Double -
1 Fleksible Joint Ø 50 mm Bh Rp. -
2 Fleksible Joint Ø 65 mm Bh Rp. -
3 Fleksible Joint Ø 80 mm Bh Rp. -
4 Fleksible Joint Ø 100 mm Bh Rp. -
5 Fleksible Joint Ø 150 mm Bh Rp. -
6 Fleksible Joint Ø 200 mm Bh Rp. -
V Pressure Reducing Valve -
1 Pressure Reducing Valve Ø 50 mm Bh Rp. -
2 Pressure Reducing Valve Ø 65 mm Bh Rp. -
3 Pressure Reducing Valve Ø 80 mm Bh Rp. -
4 Pressure Reducing Valve Ø 100 mm Bh Rp. -
5 Pressure Reducing Valve Ø 150 mm Bh Rp. -
VI Safety Valve -
1 Safety Valve ø 1" (screw) Bh Rp. -
HARGA
Kelompok NO. NAMA / JENIS BAHAN SATUAN
SATUAN BAHAN
1 2 3 4 5
VII Pressure Switch -
1 Pressure Switch Bh Rp. -
G Pompa Air Bersih -
1 Pompa Air Kapasitas 330 Lpm Bh Rp. -
2 Booster Pump Packaged 180 Lpm Bh Rp. -
3 Pompa Submersible Kap 180 Lpm Bh Rp. -
H Pompa Hydrant -
1 Electric Hydrant Pump Kap. 1000 Gpm Bh Rp. -
2 Diesel Hydrant Pump Kap. 1000 Gpm Bh Rp. -
3 Jockey Pump kap. 300 lpm Bh Rp. -
4 Pressure Tank plat 8 mm Bh Rp. -
I SUMUR RESAPAN diameter 1m x 3m -
1 Batu Belah (ketinggian 20cm)@2 Bh Rp. -
2 Ijuk (ketinggian 20cm)@2 Bh Rp. -
3 Batu Apung (Top) Bh Rp. -
4 Buis Beton dengan pembesian Bh Rp. -
5 Tutup Sumur Resapan tebal 10 cm Bh Rp. -
Total -
K STP -
1 STP TANK 16 m 3 Bh Rp. -
Include :
Sedimentation Separation
Anaerobic Contact Media
Aerobic Contact Media (BIO MEDIA)
Pipa Bakcwash PVC AW
Pipa Ciculation PVC AW
Disinfection box FRP (fiberglass)
Chlorine Set FRP (fiberglass)
Manhole
Control Panel
Blower :
Aerasi Blower, Backwash Blower
Submersible effluent pump
Float Switch ( 3 set )
DAFTAR HARGA UPAH KERJA

NO. URAIAN TENAGA SATUAN UPAH PERHARI


1 MANDOR Org / hr Rp. -
2 KEPALA TUKANG GALI TANAH Org / hr Rp. -
3 KEPALA TUKANG BATU Org / hr Rp. -
4 KEPALA TUKANG KAYU Org / hr Rp. -
5 KEPALA TUKANG BESI Org / hr Rp. -
6 KEPALA TUKANG CAT Org / hr Rp. -
7 KEPALA TUKANG LISTRIK Org / hr Rp. -
8 KEPALA TUKANG PLUMBING Org / hr Rp. -
9 TUKANG GALI TANAH Org / hr Rp. -
10 TUKANG BATU Org / hr Rp. -
11 TUKANG KAYU Org / hr Rp. -
12 TUKANG BESI Org / hr Rp. -
13 TUKANG CAT Org / hr Rp. -
14 TUKANG ASPAL Org / hr Rp. -
15 TUKANG PLITUR Org / hr Rp. -
16 TUKANG LISTRIK Org / hr Rp. -
17 TUKANG PLUMBING Org / hr Rp. -
18 PEKERJA TUKANG GALI TANAH. Org / hr Rp. -
19 PEMBANTU TUKANG BATU Org / hr Rp. -
20 PEMBANTU TUKANG KAYU Org / hr Rp. -
21 PEMBANTU TUKANG CAT Org / hr Rp. -
22 PEMBANTU TUKANG BESI Org / hr Rp. -
23 PEMBANTU TUKANG LISTRIK Org / hr Rp. -
24 PEMBANTU TUKANG PLUMBING Org / hr Rp. -
25 SOPIR TRUK. Org / hr Rp. -
26 PEJAGA API Org / hr Rp. -
27 PEJAGA MALAM Org / hr Rp. -