Vision Energy and Power Pvt. Ld. [Nupehe Likhu Hydropower Project (57.5 MW) Detail Engineering Design Report-Draft Volume I: Main Report SALIENT FEATURES 1. Project Location Province No. Development Region Zone District Intake Site Powerhouse Site Geographical Co-ordinates Latitude Longitude 2. General ‘Name of River Type of Scheme Gross Head Net rated Head Installed Capacity Average Annual Energy after Outage Average Annual Dry Energy Average Annual Wet Energy 3. Hydrology Catchment Area Mean Annual Discharge Design Discharge (at 45 % PoE) Riparian Release Design Flood Discharge (At Nupche HW) Design Flood Discharge (At Likhu HW) Design Flood Discharge (At Powerhouse) Average Annual Precipitation 4, Nupche Diversion Weir Type of Weir Length of Primary Weir Crest Elevation Length of Secondary Weir Crest Elevation 5. Nupehe Intake Structure Type of Intake |. Maven Pvt Lid 3 (Three) Eastern Development Region Janakpur Ramechhap ‘Umakunda Rural Municipality Umakunda Rural Municipality 27°40'37" N - 27°43°43" N 86°26'30" E - $6°30'30" E ‘Nupche & Likhu Khola Run-of- the-River 1003.50 m 968.46 m 57.50 MW 381.612 GWh 139.821 GWh (36.64 %) 241.791 GWh (63.36 %) 150 km? (Nupehe: 82 km? and Likhu: 68 km?) 14.25 ms 7.11 mis 0.344 m/s 76 mils 63 mis 178 m/s 2776 mm Boulder line weir 20m 3338.00 m 10m 3339.00 m Orifice type, Side intake Vision Energy and Power Pvt. Ld. [Nupehe Likhu Hydropower Project (57.5 MW) Detail Engineering Design Report-Draft Volume I: Main Report No. of Openings Size of Intake (W x H) Intake Sill Level (Invert Level) 6. Nupehe Bed Load Trap Length of Bed Load Trap Width of Bed Load Trap Overall depth Particle size to be trapped Flushing Channel 7. Nupche Gravel Trap Type Length of Gravel Trap Width of Gravel Trap (Avg.) Overall depth Particle size to be trapped Flushing Channel 8. Nupche Approach Culvert Type Length before bifurcation Length after bifurcation Size of Approach Culvert (W x H) 9. Nupche Settling Basin Type No. of Chambers Dimension (L x B x H) Inlet Transition Length Particle Size to be settled Trapping 10, Nupehe Headrace Pipe Type Internal Diameter Length Steel Thickness/Type of Lining No. of Anchor Blocks 11. Likhu Diversion Weir Type of Weir Efficiency Length of Weir Crest Elevation |. Maven Pvt Lid 2 3.0m x 2.0m (each) (Design opening 3.0 mx 0.75 m) 3337.00 m 2.3m 5.65 m 4.0 m (with free board) 300 mm or less 1.0m x 1.0 m (Bx H) Single, Dufour Type 9.5m 45m 5.65 m (with free board) >5mm 1.0m x 1.0 m (Bx H) Box Culvert 24,50 m 27.09 mx 2 numbers 2.20m x 1.20m Closed Dufour Type 2 (Two) 82 mx 84m x 7.2 m (each) 18m 0.15 mm 97% Headrace pipe (Buried) 1.60 m 243.91 m 8mm 7 Boulder line weir 215m 3338.00 m Vision Energy and Power Pvt. Ld. [Nupehe Likhu Hydropower Project (57.5 MW) Detail Engineering Design Report-Draft Volume I: Main Report 12, Likhu Intake Structure Type of Intake ‘No. of Openings Size of Intake (W x H) Intake Sill Level (Invert Level) 13. Likhu Bed Load Trap Length of Bed Load Trap Width of Bed Load Trap Overall depth Particle size to be trapped Flushing Channel 14. Li Type Length of Gravel Trap Width of Gravel Trap (Avg.) Overall depth Particle size to be trapped Flushing Channel 15, Likhu Approach Culvert Type Length before bifureation Length after bifurcation Size of Approach Culvert (W x H) 16. Likhu Settling Basin Type No. of Chambers. Dimension (L. x B x H) Inlet Transition Length Particle Size to be settled Trapping Efficiency 17, Likhu Headrace Pipe Type Internal Diameter Length Steel Thickness/Type of Lining No. of Anchor Blocks 18, Headrace Tunnel ‘Nupche Inlet portal to Junction chu Gravel Trap |. Maven Pvt Lid Orifice type, Side intake 2 2.7m x 2.0m (each) 3337.00 m 2.3m 53m 4.0 m (with free board) 300 mm or less 1.0m x 1.0 m (Bx H) Single, Dufour Type 7.0m 45m 5.3 m (with free board) >Smm 1.0m x 1.0 m (Bx) Box Culvert 22.04 m 24.01 mx 2 numbers 2.20 m x 1.20m Dufour Type 2 (Two) 75 mx 8.0 mx 7.45 m (cach) 16.7m 0.15 mm 95% Headrace pipe (Buried) 1.60 m 899.86 m 8mm 26 1677.32 m Vision Energy and Power Pvt. Ld. [Nupehe Likhu Hydropower Project (57.5 MW) Detail Engineering Design Report-Draft Volume I: Main Report Likhu Inlet portal to Junetion Outlet Inlet portal to Junction Adit Tunnel Length Tunnel Size 19, Surge Shaft Type Diameter Height Effective Depth Up Surge Level Down Surge Level Normal Operation Level 20. Buried Steel Penstock Type Material (Steel) Internal Diameter Length Steel Thickness No. of Anchor Blocks 21. Vertical Shaft Type Shaft Excavation Diameter Material (Steel) Penstock Internal Diameter Length Steel Thickness 22, Penstock Tunnel Type Tunnel Size Material (Steel) Penstock Internal Diameter Total Length Steel Thickness 21, Powerhouse Type |. Maven Pvt Lid 1435.95 m 3205 m 362.39 m 3.2.x 3.8 m (Excavation Size) Underground, Circular 6.0/6.3 m 45.55 m 36.40 m 3349.48 m 3326.21 m 3334.92 m Penstock pipe (Buried) 1S 2062: E 350 or Equivalent Varies from 1.95 m to 1.6 m 1594.16 m (Actual Length) 8 t0 45 mm a Vertical shaft tunnel with steel penstock of ing from 1.4 m to 1.25 m led with MIS concrete 2.9m IS 2062: E 350 or Equivalent Varies from 1.40 m to 1.25 m 299.51 m (Actual Length) Varies from 8 to 45 mm Tunnel with steel penstock of diameter varying from 1.25 m to 0.72 m infilled with M15 concrete extended vertical shaft to powerhouse outlet portals 3.2.x 3.5 m (Excavation Size) 1S 2062: E 350 or Equivalent Varies from 1.25 m to 0.72 m 1596.16 m (Actual Length) Varies from 40 to 50 mm Surface Powerhouse Vision Energy and Power Pvt. Ld. [Nupehe Likhu Hydropower Project (57.5 MW) Detail Engineering Design Report-Draft Volume I: Main Report Size (Lx W) Height Turbine Axis Level 2, Tailrace Type Tailrace Length Size (Wx D) Tailrace Water Level 23, Turbine Type Number Rated Output Turbine Axis Level ‘apacity per unit Gross Head Net Head Discharge per Unit Efficiency 24, Governor Type Adjustment for Speed Drop 25, Generator Type Rated Output Capacity per Unit Power Factor Voltage Frequency No of Units Excitation System Efficiency 26. Transformer Type Rated Capacity Voltage Ratio ‘No of Units Vector Group Efficiency 27. Transmission Line Voltage Level |. Maven Pvt Lid 52m x 20.20 m 18.00 m 2334.50 m Box Culvert 100 m (approximate) 2.0mx 2.2m 2328.61 m Pelton, horizontal axis 3 57.5MW 2334.50 m 1003.5 m 964.5 m 2.37 mV/s 90% Solid state, PID control Between 0 to 10% Solid State, PID Governor 5.3 MVA 0.85 IkV 50 Hz. 3 Brushless Type 96% Outdoor, Oil immersed, Three phase 8 MVA (1-Phase) 132/V3/1L kV 10 YNdI1, Solidly Earthed 99% 132 kV, Double circuit Vision Energy and Power Pvt. Ld. Length Conductor Type From To 28. Construction Period 29, Power and Energy Installed Capacity Estimated Annual Sellable Energy Dry Wet istimated Annual Revenue 30, Financial Indicator Interest During Construction (IDC) Project Cost Including IDC NPV BC Ratio FIRR (RoE) |. Maven Pvt Lid [Nupehe Likhu Hydropower Project (57.5 MW) Detail Engineering Design Report-Draft Volume I: Main Report 24 km (Aerial Length) ASCR “Bear” Nupche Likhu Switchyard, Lahaksewar Garjyang Substation, Ramechhap 4 years 57.5 MW 381.612 GWh 139.821 GWh (36.64 %) 241.791 GWh (63.36 %) 3,335 MNPR 9,533.93 MNPR 12% 10,975.20 MNPR 5,602.68 MNPR 1.61 23.44%

You might also like