Vision Energy and Power Pvt. Ld.
[Nupehe Likhu Hydropower Project (57.5 MW)
Detail Engineering Design Report-Draft
Volume I: Main Report
SALIENT FEATURES
1. Project Location
Province No.
Development Region
Zone
District
Intake Site
Powerhouse Site
Geographical Co-ordinates
Latitude
Longitude
2. General
‘Name of River
Type of Scheme
Gross Head
Net rated Head
Installed Capacity
Average Annual Energy after Outage
Average Annual Dry Energy
Average Annual Wet Energy
3. Hydrology
Catchment Area
Mean Annual Discharge
Design Discharge (at 45 % PoE)
Riparian Release
Design Flood Discharge (At Nupche HW)
Design Flood Discharge (At Likhu HW)
Design Flood Discharge (At Powerhouse)
Average Annual Precipitation
4, Nupche Diversion Weir
Type of Weir
Length of Primary Weir
Crest Elevation
Length of Secondary Weir
Crest Elevation
5. Nupehe Intake Structure
Type of Intake
|. Maven Pvt Lid
3 (Three)
Eastern Development Region
Janakpur
Ramechhap
‘Umakunda Rural Municipality
Umakunda Rural Municipality
27°40'37" N - 27°43°43" N
86°26'30" E - $6°30'30" E
‘Nupche & Likhu Khola
Run-of- the-River
1003.50 m
968.46 m
57.50 MW
381.612 GWh
139.821 GWh (36.64 %)
241.791 GWh (63.36 %)
150 km?
(Nupehe: 82 km? and Likhu: 68 km?)
14.25 ms
7.11 mis
0.344 m/s
76 mils
63 mis
178 m/s
2776 mm
Boulder line weir
20m
3338.00 m
10m
3339.00 m
Orifice type, Side intakeVision Energy and Power Pvt. Ld.
[Nupehe Likhu Hydropower Project (57.5 MW)
Detail Engineering Design Report-Draft
Volume I: Main Report
No. of Openings
Size of Intake (W x H)
Intake Sill Level (Invert Level)
6. Nupehe Bed Load Trap
Length of Bed Load Trap
Width of Bed Load Trap
Overall depth
Particle size to be trapped
Flushing Channel
7. Nupche Gravel Trap
Type
Length of Gravel Trap
Width of Gravel Trap (Avg.)
Overall depth
Particle size to be trapped
Flushing Channel
8. Nupche Approach Culvert
Type
Length before bifurcation
Length after bifurcation
Size of Approach Culvert (W x H)
9. Nupche Settling Basin
Type
No. of Chambers
Dimension (L x B x H)
Inlet Transition Length
Particle Size to be settled
Trapping
10, Nupehe Headrace Pipe
Type
Internal Diameter
Length
Steel Thickness/Type of Lining
No. of Anchor Blocks
11. Likhu Diversion Weir
Type of Weir
Efficiency
Length of Weir
Crest Elevation
|. Maven Pvt Lid
2
3.0m x 2.0m (each)
(Design opening 3.0 mx 0.75 m)
3337.00 m
2.3m
5.65 m
4.0 m (with free board)
300 mm or less
1.0m x 1.0 m (Bx H)
Single, Dufour Type
9.5m
45m
5.65 m (with free board)
>5mm
1.0m x 1.0 m (Bx H)
Box Culvert
24,50 m
27.09 mx 2 numbers
2.20m x 1.20m
Closed Dufour Type
2 (Two)
82 mx 84m x 7.2 m (each)
18m
0.15 mm
97%
Headrace pipe (Buried)
1.60 m
243.91 m
8mm
7
Boulder line weir
215m
3338.00 mVision Energy and Power Pvt. Ld.
[Nupehe Likhu Hydropower Project (57.5 MW)
Detail Engineering Design Report-Draft
Volume I: Main Report
12, Likhu Intake Structure
Type of Intake
‘No. of Openings
Size of Intake (W x H)
Intake Sill Level (Invert Level)
13. Likhu Bed Load Trap
Length of Bed Load Trap
Width of Bed Load Trap
Overall depth
Particle size to be trapped
Flushing Channel
14. Li
Type
Length of Gravel Trap
Width of Gravel Trap (Avg.)
Overall depth
Particle size to be trapped
Flushing Channel
15, Likhu Approach Culvert
Type
Length before bifureation
Length after bifurcation
Size of Approach Culvert (W x H)
16. Likhu Settling Basin
Type
No. of Chambers.
Dimension (L. x B x H)
Inlet Transition Length
Particle Size to be settled
Trapping Efficiency
17, Likhu Headrace Pipe
Type
Internal Diameter
Length
Steel Thickness/Type of Lining
No. of Anchor Blocks
18, Headrace Tunnel
‘Nupche Inlet portal to Junction
chu Gravel Trap
|. Maven Pvt Lid
Orifice type, Side intake
2
2.7m x 2.0m (each)
3337.00 m
2.3m
53m
4.0 m (with free board)
300 mm or less
1.0m x 1.0 m (Bx H)
Single, Dufour Type
7.0m
45m
5.3 m (with free board)
>Smm
1.0m x 1.0 m (Bx)
Box Culvert
22.04 m
24.01 mx 2 numbers
2.20 m x 1.20m
Dufour Type
2 (Two)
75 mx 8.0 mx 7.45 m (cach)
16.7m
0.15 mm
95%
Headrace pipe (Buried)
1.60 m
899.86 m
8mm
26
1677.32 mVision Energy and Power Pvt. Ld.
[Nupehe Likhu Hydropower Project (57.5 MW)
Detail Engineering Design Report-Draft
Volume I: Main Report
Likhu Inlet portal to Junetion
Outlet Inlet portal to Junction
Adit Tunnel Length
Tunnel Size
19, Surge Shaft
Type
Diameter
Height
Effective Depth
Up Surge Level
Down Surge Level
Normal Operation Level
20. Buried Steel Penstock
Type
Material (Steel)
Internal Diameter
Length
Steel Thickness
No. of Anchor Blocks
21. Vertical Shaft
Type
Shaft Excavation Diameter
Material (Steel)
Penstock Internal Diameter
Length
Steel Thickness
22, Penstock Tunnel
Type
Tunnel Size
Material (Steel)
Penstock Internal Diameter
Total Length
Steel Thickness
21, Powerhouse
Type
|. Maven Pvt Lid
1435.95 m
3205 m
362.39 m
3.2.x 3.8 m (Excavation Size)
Underground, Circular
6.0/6.3 m
45.55 m
36.40 m
3349.48 m
3326.21 m
3334.92 m
Penstock pipe (Buried)
1S 2062: E 350 or Equivalent
Varies from 1.95 m to 1.6 m
1594.16 m (Actual Length)
8 t0 45 mm
a
Vertical shaft tunnel with steel penstock of
ing from 1.4 m to 1.25 m
led with MIS concrete
2.9m
IS 2062: E 350 or Equivalent
Varies from 1.40 m to 1.25 m
299.51 m (Actual Length)
Varies from 8 to 45 mm
Tunnel with steel penstock of diameter
varying from 1.25 m to 0.72 m infilled
with M15 concrete extended vertical shaft
to powerhouse outlet portals
3.2.x 3.5 m (Excavation Size)
1S 2062: E 350 or Equivalent
Varies from 1.25 m to 0.72 m
1596.16 m (Actual Length)
Varies from 40 to 50 mm
Surface PowerhouseVision Energy and Power Pvt. Ld.
[Nupehe Likhu Hydropower Project (57.5 MW)
Detail Engineering Design Report-Draft
Volume I: Main Report
Size (Lx W)
Height
Turbine Axis Level
2, Tailrace
Type
Tailrace Length
Size (Wx D)
Tailrace Water Level
23, Turbine
Type
Number
Rated Output
Turbine Axis Level
‘apacity per unit
Gross Head
Net Head
Discharge per Unit
Efficiency
24, Governor
Type
Adjustment for Speed Drop
25, Generator
Type
Rated Output Capacity per Unit
Power Factor
Voltage
Frequency
No of Units
Excitation System
Efficiency
26. Transformer
Type
Rated Capacity
Voltage Ratio
‘No of Units
Vector Group
Efficiency
27. Transmission Line
Voltage Level
|. Maven Pvt Lid
52m x 20.20 m
18.00 m
2334.50 m
Box Culvert
100 m (approximate)
2.0mx 2.2m
2328.61 m
Pelton, horizontal axis
3
57.5MW
2334.50 m
1003.5 m
964.5 m
2.37 mV/s
90%
Solid state, PID control
Between 0 to 10%
Solid State, PID Governor
5.3 MVA
0.85
IkV
50 Hz.
3
Brushless Type
96%
Outdoor, Oil immersed, Three phase
8 MVA (1-Phase)
132/V3/1L kV
10
YNdI1, Solidly Earthed
99%
132 kV, Double circuitVision Energy and Power Pvt. Ld.
Length
Conductor Type
From
To
28. Construction Period
29, Power and Energy
Installed Capacity
Estimated Annual Sellable Energy
Dry
Wet
istimated Annual Revenue
30, Financial Indicator
Interest During Construction (IDC)
Project Cost Including IDC
NPV
BC Ratio
FIRR (RoE)
|. Maven Pvt Lid
[Nupehe Likhu Hydropower Project (57.5 MW)
Detail Engineering Design Report-Draft
Volume I: Main Report
24 km (Aerial Length)
ASCR “Bear”
Nupche Likhu Switchyard, Lahaksewar
Garjyang Substation, Ramechhap
4 years
57.5 MW
381.612 GWh
139.821 GWh (36.64 %)
241.791 GWh (63.36 %)
3,335 MNPR
9,533.93 MNPR
12%
10,975.20 MNPR
5,602.68 MNPR
1.61
23.44%