You are on page 1of 2
KPCIE-011112022-23/ |0\0 14-Jul-22 Karnataka Power Coporation Limited Raichur Thermal Power Station Shakthinagar, Raichur District, Karnataka 584170. wm: 9731921045 Kind Attn: Mr, Asrar ISTRUCTWEL DESIGNERS |& CONSULTANTS PVT. LTD. ENGINEERS @ PLANNERS @ MEP @ PMC @ R&D @ LABS Head Office & R & D Unit STRUCTWEL, Plot 15, Sector 24, Turbhe, Navi Mumbai - 400 705. © : +91-22-6854 1010 pl +91-22-6854 1007 BE : info@structwel.com @ www.structwel.com 1SO 9001 : 2015 Certified CIN : U74210MH1978PTCO20348 “Intelligence with Integrity” Sub - Consultancy service for the work of Remaining life assessment studies on the unit-3 chimney structure and its rectification works at RTPS. it No Description of item Ratelunit Woe | Total Amount |Rate in words unit | ayy. [Detailed vioual inspection of the structure by experts by| hand held instruments like binoculars/zoom in cameras| letc including taking photographs Nos | 1.00 | 364,00000 | 354,000.00 |Rupees: Three Lakhs! ify Four thousand only [Conducting basic non destructive tests both at field and| in laboratory lc)Core extraction of 2"diameter for chemical analysis and| |carbonation tests, Tocations | 20.00 1300 | 8280.00 [Rupees Eight Thousand [a)USPV test Two Hundred Sixty Only Nes] 10.00 58000] 5,900.00 /Rupees Five Thousand lo)Halt cel potentiometer test INine Hundred Only Nos] 74000 78500 | 44,300.00 Rupees Forly One| lp)Schmidt rebound hammer test ‘Thousand Three| Hundred Only Nos] 600 7180.00 | _7,080,00 [Rupees ‘Seven ‘Thousand Eighty Oniy Nos | 90.00 20500 | 26,580.00 [Rupees Twenty Six) ls)Covermeter test ‘Thousand Five Hundrea| Fifty Only Nos | 600 212400 | 12,744.00 [Rupees TweWve| ynemical analysis (pH,chlorides and sulphates ones Sever} |e)Chemical analysis (pH,chlorides and sulphates) need For Four Ort Nos | 6.00 4713.00 | 2,478.00 |Rupees; Two Thousand| [Four Hundred Seventy} Incarbonation test ght Gnly lg)Patrography of concrete to assess the anatomy off Nos | 3.00 77,800.00 | 35,400.00 |RupessThiry Five] Jconcrete at micro level ‘Thousand Four Hundreq| loniy T [Conducting insitu specialized non destructive tests lay AUTOCLAM fest for assescing In situ air and water} locations | 5.00 77,210.00 | 56,050.00 |Rupees’ Fifty ‘Six lpermeabilty ‘Thousand Fifty Only lb)PERMIT for assessing the chloride ion diffusion} locations | 5.00 7721000 | 66050,00 [Rupees Fifty Sh resistance of the near surface zone of concrete ‘Thousand Fifty Only lejSeanning of the chimney surface by GPR survey for] sqm | 600.00 36400 | 2,12,40000 [Rupees: Two Lakhs| lassessing the quality of reinforced concrete [Twelve Thousand Four] Hundred only layRemote sensing survey by lnffa red trermography sn] lorder to identity cold and hot spots in concrete to assess| tne quality of concrete Tocations | 25.00 $850.00 | 227,250.00 |Rupees: Two Lakh] Twenty One Thousang| ITwo Hundred Fifty Only @ MUMBAI @NAVIMUMBAI —@ DUBAI © PUNE @ BENGALURU © NAGPUR STRUCTWEL DESIGNERS & CONSULTANTS PVT. LTD. @ [Providing and erecting steel scaffolding with staging with] lworking platform slong with ladder to reach 40m height or conducting non destructive tests to chimney at RTPS| lusing MS pipes, ciamps/ bolts including cost of welding| Jods, gas! LPG. consumables, T & P, cutting, welding| | ete, for erection and dismanting by adopting all safety| laspects During course of conducting NDT test the| staging workers shall be available at site for rectyng| lany defectsiproblems Dismantling the staging work after ‘completion of non destructive test and clegring the site ‘Sqm 720000 26.00 '3387,20000 Rupees: Nine Lakhs] Ninety One Thousana| [Two Hundred Only =| {ssinvaion oF data. Anajsng the NOT vepons and providing inerences of NDTe Nos 700 7,18,000 00 778000 00 Rupees’ One Lakh Eighteen Thousand Only [Preparation of investigation report based on the eld lstudy covering details of visual inspection,NOTs and] inferences and repair methodology to be suggested including budgetory costs for repairs and submitting six lcopies of detailed report in hard copy and one CO [containing soft copy. Nos 700 265,500.00 2,868,500 00 Rupees’ Two Lakhe| Sixty Five Thousand Five| Hundred Only 7 |Dismantingiremoving and lowering the lit enclosure 8] lany other loose/damaged materials at EL. +0.0m to /+220m of Unit-3 Chimney and shifting the same safely t| tne ground level and disposing off the same with lsufficient care, without —_disturbing/damaging Jequipments/ducts, other structures installed in the Jsurrounaings of chimney area and also the safety of working personnel in the above area, other requirements it any lke condition of ladder or handrail if found unsate| Jsame shail be strengthen before start of work atthe cost Jot agency, deploying specialized skiled labours with Inecessary equipments, tools and tackels, electrical cables of required length, wite rope, cutting machine, consumables etc., including hire charges, transportation charges, mobilization and demobilization of men, material and machineries, providing necessary safety |gadgets to the workers by folowing the safety norms wth] all lead and tits etc,, complete, ob 00 72,38,000.00 ¥2,39,000.00 Rupees’ Twelve Lakhs| [Thity Nine Thousana| Jonly TOTALRs,| 36,53,162.00 [Rupees: Thirty Six] lLakhs Fifty Three| Thousand One| lHundred Sixty Two) lonly Terms and Conditions: followed strictly ‘complete the said work successfully 3. The rates quoted GEA Oh inclusive of PF, al taxes and duties etc, Necessary insurance, safety gadgets for the workers deployed should be provided compulsarily and plant safely norms should be Rates quoted should cover scope of work as per specfication and inclusive of cost of any other addltionallextra works required to

You might also like