‘Typical sequence of Principal Events during Contracts for Construction
1
any extensions of time under Sub-Ciause 8.4.
2.
failing to comply with Sub-Clause 8.2.
3
added any extensions under Sub-Clause 11.3
10.1 Issue of
Taking-Over
Conte
11.9 ssve of the
Pertxmance
Cartfcate
Detects
Notticabon
Period
< >
11 Rotting = 210
of Detects
Remedng =
of Detects
4.2 Return of
the Performance
Seourty
‘The Time for Completion is to be stated (in the Anpendix to Tender) as @ number of days. to which is added
In order to indicate the sequence of events, the above diagram is based upon the example of the Contractor
The Defects Notification Period is to be stated (in the Appendix to Tender) as a number of days. to which is4.6 Engneer 4.7 Employ
submits Staten
issues interim tne payment to the
ment Ceriicate _Contracto
to the Engineer
Each of the
monthly (or
otherwise)
interim
payments,
The final Engneor ventes tne
payment statement. Contractor
submis information
14.11 Cont tractor submits 14.13 Engineer issues
drat inal statement to the Fea Statement and the Final Payment
12 discharge Conticate
ts 14.11
Engnee
‘Typical sequence of Payment Events envisaged in Clause 14
8 20.2 Parties 20.4 A Pany refers 2068 Party
Commencement anpaint a dspute ta the may siiate
Date pap AaB artaration
Panies present Amable
submissions to the DAB. settlement