Issue ot Tender Documents Base Date 286 Tender perod Submsson of the Tender (sue of the 8.1 Leterc! Commencement Acceptance Oate 8.2 Time for Completion < «289 A 4.2 issue of Performance Secutty Delay attebutable tothe Contactor 9.1 Tests on > Completion ‘Typical sequence of Principal Events during Contracts for Construction 1 any extensions of time under Sub-Ciause 8.4. 2. failing to comply with Sub-Clause 8.2. 3 added any extensions under Sub-Clause 11.3 10.1 Issue of Taking-Over Conte 11.9 ssve of the Pertxmance Cartfcate Detects Notticabon Period < > 11 Rotting = 210 of Detects Remedng = of Detects 4.2 Return of the Performance Seourty ‘The Time for Completion is to be stated (in the Anpendix to Tender) as @ number of days. to which is added In order to indicate the sequence of events, the above diagram is based upon the example of the Contractor The Defects Notification Period is to be stated (in the Appendix to Tender) as a number of days. to which is 4.6 Engneer 4.7 Employ submits Staten issues interim tne payment to the ment Ceriicate _Contracto to the Engineer Each of the monthly (or otherwise) interim payments, The final Engneor ventes tne payment statement. Contractor submis information 14.11 Cont tractor submits 14.13 Engineer issues drat inal statement to the Fea Statement and the Final Payment 12 discharge Conticate ts 14.11 Engnee ‘Typical sequence of Payment Events envisaged in Clause 14 8 20.2 Parties 20.4 A Pany refers 2068 Party Commencement anpaint a dspute ta the may siiate Date pap AaB artaration Panies present Amable submissions to the DAB. settlement

You might also like