The document describes a zone load test conducted on a 600mm diameter pier foundation. The test was conducted over 24 hours, applying incremental loads from 0 to 90 tons, which is 150% of the design load of 60 tons. Soil displacement was measured using 4 gauges, with maximum displacement of 1.73mm recorded at the highest test load. The pier foundation performed satisfactorily under the zone load test.
The document describes a zone load test conducted on a 600mm diameter pier foundation. The test was conducted over 24 hours, applying incremental loads from 0 to 90 tons, which is 150% of the design load of 60 tons. Soil displacement was measured using 4 gauges, with maximum displacement of 1.73mm recorded at the highest test load. The pier foundation performed satisfactorily under the zone load test.
The document describes a zone load test conducted on a 600mm diameter pier foundation. The test was conducted over 24 hours, applying incremental loads from 0 to 90 tons, which is 150% of the design load of 60 tons. Soil displacement was measured using 4 gauges, with maximum displacement of 1.73mm recorded at the highest test load. The pier foundation performed satisfactorily under the zone load test.