INFORMATION REQUIRED FOR PRE-SUBMISSION OF LCP M&E

Client No. Information Remark


1. Anggaran Beban & Source
No. Information Remark 2. Location of PE/PPU/SSU/…, total unit required
1. Surat Lantik Perunding
2. Type of Soil/Soil investigation report
3. Hak Milik (CTC)
4. Laporan geoteknikal (bagi Kawasan kelas iii dan TIA *
iv)
No. Information Remark
1. Traffic flow & TIA design

Surveyor

No. Information Remark EIA *


1. Pelan Kontour/Pelan Ukur
2. Pelan lokasi (linkungan 5km) No. Information Remark
-menandakan tiang KM kilometre post 1. Indeks Kualiti Air, udara, darjah kebisingan dan
3. Precomp plan Kawasan berisiko banjir
2. Langkah-langkah mitigasi

C&S

No. Information Remark Architect*- (KM Pendirian Bangunan)


1. Water Demand & Water Projection& the source
of water No. Information Remark
2. Drainage flow &Inlet and outlet drainage 1. Perspective drawing
3. Total PE, type of sewerage system used
Landscape Architect* (KM Pendirian Bangunan)
4. Sewerage flow& Inlet and outlet sewerage
No. Information Remark
1. landscape plan