Professional Documents
Culture Documents
+ 2.500
BLOCK VENTILATION
150
150 6000 21000 9000 150
200
500
Ø 10 - 200 c/c Ø 10 - 200 c/c
1000
Ø 10 - 200 c/c 2xPIPA PVC 150
+ 250 Ø 4" AW POTONGAN -A-A
± 0.00
Ø 10 - 200 c/c
1 4 Ø 10 - 200 c/c
250 500
+0.00 +0.00 ±0.00 +0.00
-250 -250 -250
100
50
50
400 500 COR BETON 1 : 2 : 3 COR BETON Ø 10 - 200 c/c 400
Ø 10 - 200 c/c LANTAI KERJA
Ø 10 - 200 c/c LANTAI KERJA 1:2:3 1400
1400 SIRTU (PEMADATAN 45% CBR) 1:3:5
1:3:5
3000 3000 6000 6000 6000 6000
TIANG PANCANG
MINI PILE UK 25 x 25 x 7 M
550 3000 3000 3000 3000 3000 6000 3000 3000
3000
200 1000 TANGGA
1000
TANGGA
400
200
150
400
200
150
150
2500
2500
400
150
200
2500
2500
± 0.00
+ 0.00
10000
600
600
600
200
- 250 - 250 - 250
600 600 600
2500
2500
1200
DENAH
NO. REVISION DATE
CLIENT
200
1200
PIPA Ø 8"
PIPA Ø 4"
2500
2500
1200
200 500
+ 0.00
550
+ 0.00
DESIGN ENGINEERING DEVISION DATE SIGNED
7000
150
DRAWN BY
6000 CHECKED BY
150
APPROVED BY
PROJECT
15000
9000
VENTILASI BLOCK
DRAWING TITLE
4000 1500
FOUNDATION
WATER SETTLING BASIN
DRAWING NO.
SSB/C-79.0/2013
SCALE SHEET PROJECTION
A3 ISO - Menthod E
1