You are on page 1of 1

A B C D E F

1 PLANILLA DE MOVIMIENTO DE TIERRAS


2
3 PROYECTO JR TARAPOTO C5
4
5 AREAS (m²) VOLUMENES (m³)
6 KM DIST. CALZADA
7 AC AR VC VR
8
9 0+000.00 2.57 0.00 0.00 0.00
10 0+020.00 20 3 0.00 55.70 0.00
11 0+040.00 20 3.07 0.00 60.70 0.00
12 0+060.00 20 2.67 0.00 57.40 0.00
13 0+075.49 15 3.3 0.00 46.24 0.00
14 220.04 0.00