You are on page 1of 1

Response-2000 v 1.0.

5 Cross Section Longitudinal Strain Shrinkage & Thermal Strain


Pile top top
2022/3/16 - 2:25 pm
Control : M-ex
9345.9

-3.25 14.65

bot bot

Crack Diagram Long. Reinforcement Stress Long. Reinf Stress at Crack


top top
-0.1 12.1
0.64
Control : M-Phi
9345.9
3.18
-302.5 302.5 302.5
5.82

10.44
bot bot
7.24
Longitudinal Concrete Stress Internal Forces N+M
top
28.4 C: 8941 kN M: 9346 kNm

εx0 = 5.70 mm/m 812 mm

φ = 9.04 rad/km
γxy(avg) = 0.00 mm/m -27.2 306 mm T: 6830 kN N: -2111 kN
991 mm

Axial Load = -2111.1 kN


Moment:= 9345.9 kNm
Shear = 0.0 kN
bot

You might also like