This document provides a summary of work projects and their associated costs totaling over 29 trillion rupiah. It outlines 3 construction projects, including pile foundations for structures, soil improvements, and hydrolic fracturing. It lists the scope of each project in meters or units, along with unit costs and total costs in rupiah. The largest project was pile foundation work for 750 meters at a cost of over 469 billion rupiah.
This document provides a summary of work projects and their associated costs totaling over 29 trillion rupiah. It outlines 3 construction projects, including pile foundations for structures, soil improvements, and hydrolic fracturing. It lists the scope of each project in meters or units, along with unit costs and total costs in rupiah. The largest project was pile foundation work for 750 meters at a cost of over 469 billion rupiah.
This document provides a summary of work projects and their associated costs totaling over 29 trillion rupiah. It outlines 3 construction projects, including pile foundations for structures, soil improvements, and hydrolic fracturing. It lists the scope of each project in meters or units, along with unit costs and total costs in rupiah. The largest project was pile foundation work for 750 meters at a cost of over 469 billion rupiah.
i 11. (Rp.) L&fm' 29,931,982.269.2 I PEK ERJA \ PO D \ SI 6 I Ptl\tri1a n Sou n Pitt fiot PC I 186.055....9.... Pcn11:tcb3n Soun Pile 0SO cm' 4(X) m' f\25.900 () 25()..360.0() ()() 56 Pcm:inc3n 3n (j3ckinA h drohc}+ lCC 400 m' ()()(),()()() ().24 .000.00.0 Pckcrj:tan plfon 8 40 m . 00 47.·137 39X.47Ci PckcrJ:ln n urul!3n Ulnnh kcmb:ili 3.3( I Ci(J ll ,4SX 00Jl< .SOO m Pcmb13n urup:in p3<bt tcum • 33 ()CJ 34,375 <M> 27500 m Pcmbwnan lan13a kCfJ' Q 0 40 m ' 1.0 I l ,67X 00 ,671.3 4().t Pckcrj:t m bcton Piie Cap 1% 7 20 m I 2S 3.701.341< 0 3.70 ,26 Pcmoton u:in <Un Pcnuo.:a\:ln \Ima Pile 715 9S u11k 26 74i,OOO ()(I 71.34X l :?S ,(M) 2 Pt9'trj1an Sou n Pilt Tiot PC2 OOO 78.20 Pcn11;icb:tn Soun Pa le 0SO cm' 100 m' 62S,9f KI 62.590,00 ,lMJ Pnc:mn C1ackan h\drolic) · l"\1cc 100 m' ( .()()(} () 0(>,000,000 Pct..crj n g:slian 2 CJ () 47.4 37 00I 31<.0X7 m Pckcrj:inn urulf:in tnn:th kcmb:ili II 16 IJ so I l .4 SX 6013.341.X m Pcmbt:in uruµn p;i<bt 0. 25 mJ 33 34,375 00 OK,701 .1 Pcmbtnn lanta i kcrja 0. I 1.0 I I .ft 7K 12l<.040.S73 m Pckcn:ia n bcton Pile Cap JOX 922 13 2 S3 I 25 J,653.61 . 9 .241<.205,80 m Pcmotoniz:in <Un Pcn11.uro<.an \hni Pile LOO titit.: 2 7S,OUO17 7S.()(M). J Ptktri1an Sou n Pilt Tiot PCS 00 (Xl 514.425.000.0 Pcn11:icb:sn Soun Pa le 0SO cm' 7SO m' 625,900.0 469.425.00 <Ml 0 0.