You are on page 1of 1

SWITCHGEAR

PROJECT: Date:
Discipline:
Area:
Equipment: Drawing No:
System: WIR Ref no:
Location: Service:
Material Approval Inspection:
no:

Y N

1 Check the material used in installation as approved, correct type and size

2 Check the the installation as per approved Drawing

3 Check the Elevation, orientation, Plumpness, alignment are correct


Check the Switch gear / MDB assembly and installation according to
4
manufacturer instructions.
Check the Switch gear / MDB supported rigidly with footings and grouted if
5
required
6 Check the component rating, size and type as per requirements

7 Check wiring system as per schematic diagram

8 Check proper torque as per manufacturers recommendations

9 Check the bus bar phasing and clearances

10 Check the accessibility for Operation and maintenance

Remarks / Comments

BK GULF ELP MIRK

Signature:

Name:

Title:

Date:

E16