BILL OF QUANTITY CHARGING ROOM FORKLIFT

PT SORINI A. A. CORP. - PANDAAN, PASURUAN

Volume Unit Rate Total Rate


No Description
Qty Unit (Rp) (Rp)
A Preparation Work
1 Rapid test antigen 1.00 ls - -
2 Safety & K 3 1.00 ls - -
3 Cleaning from early until end project 1.00 ls - -
Sub Total A -
B. CIVIL WORK AREA WAREHOUSE PFL
1 Marking & stake out 1.00 Ls - -
2 Epoxy floor 20.00 m2 - -
3 Installs Pipe 5" (include painting) 16.00 m' - -
4 Base plate thick 4 mm (200 MM X 200 MM) 6 UNIT 0.24 m2 - -
5 Pengadaan angkur bolt Steel M 13 (L = 120 mm) 24.00 pcs - -
6 Bor angkur bolt with chemical hilty to Floor 24.00 nos - -
Sub Total B -
C. CIVIL WORK AREA WAREHOUSE 44
1 Marking & stake out 1.00 Ls - -
2 Epoxy floor 20.00 m2 - -
3 Installs Pipe 5" (include painting) 16.00 m' - -
4 Base plate thick 4 mm (200 MM X 200 MM) 6 UNIT 0.24 m2 - -
5 Pengadaan angkur bolt Steel M 13 (L = 120 mm) 24.00 pcs - -
6 Bor angkur bolt with chemical hilty to Floor 24.00 nos - -
Sub Total C -
D. CIVIL WORK AREA WAREHOUSE 27
1 Marking & stake out 1.00 Ls - -
2 Epoxy floor 20.00 m2 - -
3 Installs Pipe 5" (include painting) 16.00 m' - -
4 Base plate thick 4 mm (200 MM X 200 MM) 6 UNIT 0.24 m2 - -
5 Pengadaan angkur bolt Steel M 13 (L = 120 mm) 24.00 pcs - -
6 Bor angkur bolt with chemical hilty to Floor 24.00 nos - -
Sub Total D -
E. CIVIL WORK AREA WAREHOUSE CHEMICALL
1 Marking & stake out 1.00 Ls - -
2 Galian Tanah 0.14 m3 - -
3 Cor foot lantai kerja 0.03 m3 - -
4 Cor foot plat include rebar & form work 0.11 m3 - -
5 Painting floor 20.00 m2 - -
6 Installs Pipe 5" (include painting) 16.00 m' - -
7 Base plate thick 4 mm (200 MM X 200 MM) 6 UNIT 0.24 m2 - -
8 Pengadaan angkur bolt Steel M 13 (L = 120 mm) 24.00 pcs - -
9 Bor angkur bolt with chemical hilty to Floor 24.00 nos - -
Sub Total E -
TOTAL -
PPN 10% -
TOTAL + PPN -