This document is a bill of quantities for charging room forklift civil works at PT SORINI A. A. Corp. in Pandaan, Pasuruan. It includes quantities, units, unit rates, and total rates for various civil work items across five areas - the warehouse PFL area, warehouse 44 area, warehouse 27 area, and warehouse chemical area. However, all unit and total rates are listed as "-" or not provided, so the total cost of the civil works cannot be determined from this document.
This document is a bill of quantities for charging room forklift civil works at PT SORINI A. A. Corp. in Pandaan, Pasuruan. It includes quantities, units, unit rates, and total rates for various civil work items across five areas - the warehouse PFL area, warehouse 44 area, warehouse 27 area, and warehouse chemical area. However, all unit and total rates are listed as "-" or not provided, so the total cost of the civil works cannot be determined from this document.
This document is a bill of quantities for charging room forklift civil works at PT SORINI A. A. Corp. in Pandaan, Pasuruan. It includes quantities, units, unit rates, and total rates for various civil work items across five areas - the warehouse PFL area, warehouse 44 area, warehouse 27 area, and warehouse chemical area. However, all unit and total rates are listed as "-" or not provided, so the total cost of the civil works cannot be determined from this document.
No Description Qty Unit (Rp) (Rp) A Preparation Work 1 Rapid test antigen 1.00 ls - - 2 Safety & K 3 1.00 ls - - 3 Cleaning from early until end project 1.00 ls - - Sub Total A - B. CIVIL WORK AREA WAREHOUSE PFL 1 Marking & stake out 1.00 Ls - - 2 Epoxy floor 20.00 m2 - - 3 Installs Pipe 5" (include painting) 16.00 m' - - 4 Base plate thick 4 mm (200 MM X 200 MM) 6 UNIT 0.24 m2 - - 5 Pengadaan angkur bolt Steel M 13 (L = 120 mm) 24.00 pcs - - 6 Bor angkur bolt with chemical hilty to Floor 24.00 nos - - Sub Total B - C. CIVIL WORK AREA WAREHOUSE 44 1 Marking & stake out 1.00 Ls - - 2 Epoxy floor 20.00 m2 - - 3 Installs Pipe 5" (include painting) 16.00 m' - - 4 Base plate thick 4 mm (200 MM X 200 MM) 6 UNIT 0.24 m2 - - 5 Pengadaan angkur bolt Steel M 13 (L = 120 mm) 24.00 pcs - - 6 Bor angkur bolt with chemical hilty to Floor 24.00 nos - - Sub Total C - D. CIVIL WORK AREA WAREHOUSE 27 1 Marking & stake out 1.00 Ls - - 2 Epoxy floor 20.00 m2 - - 3 Installs Pipe 5" (include painting) 16.00 m' - - 4 Base plate thick 4 mm (200 MM X 200 MM) 6 UNIT 0.24 m2 - - 5 Pengadaan angkur bolt Steel M 13 (L = 120 mm) 24.00 pcs - - 6 Bor angkur bolt with chemical hilty to Floor 24.00 nos - - Sub Total D - E. CIVIL WORK AREA WAREHOUSE CHEMICALL 1 Marking & stake out 1.00 Ls - - 2 Galian Tanah 0.14 m3 - - 3 Cor foot lantai kerja 0.03 m3 - - 4 Cor foot plat include rebar & form work 0.11 m3 - - 5 Painting floor 20.00 m2 - - 6 Installs Pipe 5" (include painting) 16.00 m' - - 7 Base plate thick 4 mm (200 MM X 200 MM) 6 UNIT 0.24 m2 - - 8 Pengadaan angkur bolt Steel M 13 (L = 120 mm) 24.00 pcs - - 9 Bor angkur bolt with chemical hilty to Floor 24.00 nos - - Sub Total E - TOTAL - PPN 10% - TOTAL + PPN -