You are on page 1of 6
R@CKSPEED ELEVATOR AND ESCALATOR CORPORATION EXCLUSIVE DISTRIBUTOR OF FUsJI ELEVATS March 8, 2022 Ref. No.: REEC-032022-RP00020B MR. LUIS V. VEGA VP OPERATIONS (ORA REALTY CORPORATION) Casino Filipino Ronquillo. 561 Ronquillo St, Santa Cruz, Manila, 1003 Metro Manila Subject REDESIGNING OF CASINO FILIPINO RONQUILLO INTERIOR ELEVATOR CABIN Dear Ma'am/Sir, We are pleased to offer our proposal for your above subject equipment for your acceptance and approval with details as follow: No. ems ary Unit Price Total Price SUPPLY AND INSTALLATION OF CABIN WALL 1 | miRRoRZeD 1 Php 320,000.00 Php 320,000.00 Note: Ceiling not included 2__| PAINTING OF CAR DOOR ol Php 1700000 Pap 750000 [3 | REPLACEMENT OF VINYL THES o Php 12,000.00 Php 12,000.00 2 an eee ‘ Penoceres roe SUBTOTAL AMOUNT Php 559,000 00. LESS DISCOUNT Php 17 950.004 TOTAL AMOUNT 347,050.00 VAT 12% Ph TOTAL AMOUNT VATINGLUSIVE Teper ere ‘AY Terms of Payment {30% Down payment upon acceptance ofthis proposal ‘50% Progress Billing payment upon Completion of work B) Delivery & Completion: Sixty (60) to Ninety (90) working days, NOTE: = 1) All works are to be performed on our regular working hours and on regular working days. if overtime work is required, the customer will be charged extra for such work at Php 256.00 per hour. 2) The above job completion time frame is estimated and may be extended accordingly should there be parts required that is not speatied in the contract and isnot in stock ‘Thank you andif the above propasal meets your approval and acceptance, kindly sign atthe space provided below and all pages to give full force and effect ofa valid agreement between us. Very truly yours, Print Name over Signature Date REAR PANEL FRONT PANEL RIGHT AND LEFT SIDE PANEL MMIRRORIZE STAINLESS STEEL VINYL TILE CAR INTERIOR PERSPECTIVE N T IMIRRORIZE STAINLESS | \ STEEL Sb VINYL TILE March 10, 2022 Gpotoll 10000-10009646-RO ZZQ6 QT-Repair Sales (Mi ORA REALTY CORPORATION #113 Roxas Bivd., Baclaran, Paraiiaque, City Attention: MR. LUIS VEGA Subject Chief Administrator : HITACHI Elevator 1 Madame/Gentleman: HITACHI Inspire the Next During our regular servicing of your HITACHI Elevator, we found the following defective parts; ‘The main rope and governor rope are already rusty and abraded which are signs of wearing-out. These must be replaced to ensure the safety of the riding public and to prevent the unexpected breakdown of the clevators. Scope of | Works: 1. Suspend the cage and counterweight Dismantle old main ropes Install new main ropes Dismantle old governor rope Install new governor rope Remove cage Testing and adjustment NAWAYN id counterweight from suspension For the above findings, the cost of supply and replacement as follows: Item Parts/Description Qty | Unit Price | Cur | Total Amount 1 _| Main Rope aL. 12,220.00 | PHP 48,880.00 |-~ 2_ | Govemor Rope IL 15,600.00 | PHP 15,600.00 3__| Metal Babbit 2 1,500.00 | PHP 3,000.00) 4 _| Ball Bearing 6205-22 1 500.00 | PHP. 500.00 S| Ball Bearing 6208-22 1 800,00 | PHP 800.00 6 _| Ball Bearing 6308-22 i 1,200.00 | PHP, 1200.00) ‘Labor Charge (Dismantling, Installation & Adjustment) PHP 166,000,004 TOTAL AMOUNT —— PHP 135,980.00, “Above Quotation Price is VAT(12%) included. HITACHI Inspire the Next ipon Acceptance and 50% TERMS OF PAYMENT 77 DELIVERY TIME month upon rcpt of P.O, ‘This oer valid unl April 31,2022 oly. Quoted price may increase fer validity date Kindly isuue PO. oF sign atthe space provided below to indicate your approvl of his quotation and

You might also like