[Soot aggreko Aggreko (Middle East) Limited @injsyey Health & Safe! Clien for and Environment (HSE) Plan Name to be updated Consultant: [Name to be updated) for The installation and commissioning of the Temporary Prepared By Approved By Name ‘Area Manager/ Business Service Team Leader! Project Job Title Manager or its equivalent DevelopmentManager or its Depot/Project Name) equivalent ( (DepotProject Name) Signature Date dd-Mmm-yyyy dd-Mmmeyyyy 25,04,2021 Page 1 of 18 gS} > I Aggreko (Middle East) Limited aggreko Contents 1, Purpose 2. Scope of Work 3. References 4. Acronyms, Abbreviations, Terms and Definitions 5. Roles and Responsibilities 6. Skills of Electrician(s) Involved 7. Fitness for Work (FFW) Policy 8. Site Induction (Aggreko) 9. Site Induction (Customer) 10. Accident Reporting and Investigation 11. Key Performance Indicators (KPIs) / HSE Performance 12.First aid arrangements 13.Fire safety arrangements 14,Personal Protective Equipment (PPE) 15.Procedure 16,Health, Safety, and Environment (HSE) 17.Emergency Preparedness and Response 18.Waste Management 19. Risk Assessments (RAs) 20. Method Statements (MSs) / Job Safety Analysis (JSAs) 21. Attachments (HSE and Technical) 25.04.2021 Page 2 of 18 [Soot Aggreko (Middle East) Limited @injsyey Health & Safety and Environment (HSE) Plan 1. Purpose The purpose of Aggreko Health & Safety and Environment (HSE) Plan is to identify the site-specific procedures to be adopted by the site personnel to protect employees, customers and other subcontractors working at site from potential hazards associated with the workplace. This plan contains most of the HSE requirements that are applicable to this contract in conjunction with customer's HSE requirements. 2. Scope of Work (Sample below) The Microsoft project for proposed Data Center at Mesaimeer Annex Building is currentlyunderconstruction. Asper the schedule the Facilityisto be ready for service by July 2021, To achieve this milestone, itis required that the Kahramaa commercial power is made available latest by end of March 2021. However, the scheme works for commercial power is under initiation by Kahramaa and is expected not to be completed as per required. So, based on the discussion and agreement with MSFT it is decided to have temporary power system implemented so as to provide continuous power to the facility until commercial power is made available. The technical details accordingly is developed and agreed with MSFT. This proposal is for the Implementation of Temporary Power Supply facility for the MSFT Data Center. The requirement is to provide a temporary solution supplying continuous power of 4.7 MW to the [Customer] Data Center Facility at Mesaimeer. The system shall be of N+1 capacity and with redundant distribution path. The solution shall provide a redundant source of power to the LV distribution system of the facility. The solution shall be procured, installed, tested and commissioned to specified standards. The solution shall be designed o run 24 x7 for the total required duration including operation and maintenance downtime with N redundancy available at all stages. Design Parameters Value Duration 90 days Capacity 47 MW Project Start Date xx ‘System Voltage THKV, Voltage Accuracy 15% ‘System Frequeno 50 Hz Frequency Accura +-0.5% Rating ‘Continuous Site Ambient Temperature 45 Deg C Site Altitude 25m ASL 25.04.2021 Page 3 of 18 gS} > I Aggreko (Middle East) Limited aggreko Deliverables: * Diesel Generators 11kV Switchgear Step Up Transformers LV Distribution System Cabling Works Grounding Transformers Fuel Distribution System Discrimination Study Arc Flash Study Engineering Review Project Plan Drawings: Kindly find attached herewith (if applicable). Exclusions: Fuel Supply * Earthing Grid * Diesel + Civil works * The clientorits consultant must ensure that no other activities are simultaneously taking place such as work at heights, hot works, excavations, etc. inside the area where Aggreko is doing the activities related to the mobilisation, set up, installation, commissioning, maintenance and servicing of the power package. Aggreko shall be responsible in controlling the activities occurring within their scope of work and within their perimeter only. . References a) Aggreko HSE Management System (Standard Zero) b) Aggreko Orange Rules. ©) Aggreko Risk Assessments. d) Aggreko Method Statements ) Aggreko Service Manual. (Maintenance Schedule — Service Manual) . Acronyms, Abbreviations, Terms and Definitions FFW- Fitness For Work RA - Risk Assessment MS ~ Method Statement 25.04.2021 Page 4 of 18 [Soot Aggreko (Middle East) Limited @injsyey 5. Roles and Responsibilities It is the responsibility of all personnel involved in the works to implement this Site Specific HSE Plan and in accordance with the Risk Assessments, Method Statements, and project safety rules and regulations. The personnel will be the following and mostif notall of them will be involved closely during all stages of the project operations including installation and commissioning stage. The personnel will have two (2) operational shifts as below during operational phase while more personnel with will be involved during the installation and ‘commissioning phase which operation will be supervised closely by the Project/Site Supervisor/Technician, The shifts also cover “Ramadan” and "Summer’ working timings considerations and arrangements as agreed and approved Shift4 (12-hour shift)-if applicable to the tender requirement * 1x Project Operations Lead * 1x Project HSE Officer * 1x Technician © 1x3" Party Helper Shift2 (12-hourshitt) if applicable to the tender requirement * 1x Project HSE Officer * 1x Technician * 1x3" Party Helper The four(4) minimumrequirements detailed below mustbe applied withoutexception. Please refer to annexure 21.n for more details. * Maximum 14 hours working per shift + Minimum 10 hours rest between shifts * Maximum 84 hours per 7-day period © Minimum 1 day off ina 14-day period Sample below are the names of the personnel appointed for the specific site/ project to be updated SN Name Role Company] Contact Number 51 ‘Area Manager ‘Agareko 52 Sales Engineer ‘Agareko 5.3 Service Lead Aggreko 54 QHSE Support ‘Agareko Technician 55 (Support) Aggreko Technician 88 (Support) Aasreko 25.04.2021 Page 5 of 18 [Soot Aggreko (Middle East) Limited @injsyey 5.1 Area Manager! Operations Manager (Project Manager) + Implement and maintain a successful completion of the work. * Communicate this HSE Plan to his subordinates, * Provide his subordinates with the information they need, to carry out their responsibilities. * Enforce the application of this document once it is approved. * Stop all unsafe work activities. + Ensure the Health and Safety of the personnel on the site. + Ensure that the requirements of the Project specifications are followed and implemented in the entire duration of the project. 5.2 Business Development Manager! Sales Engineer (Key Account) * Supports the Project Manager and is responsible for the regular communication with the Clienton finance issues and contract tracking. + Participates in meeting with the clientin terms of the Contract. * Coordinates and ensures that relevant documentations are submitted in a timely fashion to the Clientand the relevantinterested parties. * Coordinates and ensures that relevant requirements are met as per agreed timelines. 5.3 Operations Supervisor/ Service Lead (Project/Site Supervisor) * Directly supervise and monitor all construction activities at site, * Directly coordinate with section technicians. + Ensure availability of all required tools to maintain a safe working environment * Ensure compliance with procedures with respect to equipment and related certification and permits + Ensure that the workers under his command fully understand the hazards and risks involved in the job and are responsible to ensure they work in a safe environment. * Make sure that the personnel under his supervision are adequately trained and are qualified to carry out the work. Ensure a safe working environment for the workforce. Provide the site workers with the required PPE for the job. Provide the necessary the material, equipment, and machinery for the job. Ensure the work area is safe for the activities being performed Ensure Aggreko and/or Customer HSE Policies are complied with. Conductsafety inspections in line with the HSE Management System (Standard Zero), Conduct safety inductions for Aggreko and sub-contract employees. Coordinate with the Customer regarding Permit to Work system if required Report all accidents and incidents. Participate in meetings with the Customer. Maintain high standard of housekeeping of work. 25.04.2021 Page 6 of 18 gS) >I Aggreko (Middle East) Limited [Soot \ggreko (Middle East) Limite @injsyey + Ensure thatworking areas are properly covered with work permits. * Provide all necessary tools, equipment, and materials required at site: * Make sure that site personnel are adequately trained to do the job. 5.5 Project/Site HSE Officer (in the event an appointed HSE officer for the job) + Ensure thatthe entire work is carried out safely and in an environmental-friendly manner. * Identify and demonstrate compliance with all applicable legal/regulatory requirements and the client requirements related to HSE. * Ensure the Site Specific HSE Plan is implemented and followed for each activity. * Monitor the implementation of this HSE Plan. * Stop all unsafe work activities * Ensure thattoolbox talks are conducted regularly. * Regularly pay site visits to ensure that safety is being exercised at site as per requirement. * Monitor the implementation of this HSE Plan. * Monitor and advise the required training for the site personnel involved. * Monitor and advise all requirementfor tools to ensure they are safe for use. * Monitor the compliance with procedures with respect to equipment's and related certifications and permits. Monitor and ensure a safe working environmentto site supervisors. + Stop all unsafe work activities, + Ensure Aggreko and/or Customer HSE Policies are complied with. * Conduct safety inspections in line with the HSE Management System (Standard Zero). * Conductsafety inductions for Aggreko and sub-contract employees. * Coordinate with the Customer regarding Permit to Work system when required. + Reportall accidents and incidents to both Aggreko and the Customer. * Participate in meetings of the Customer and share the relevant information to the team on site as well as escalate any concems that cannotbe resolved on site * Maintain high standard of housekeeping of work. + Ensure thatworking areas are properly covered with work permits. 5.6 Technician * Ensure thatthis HSE Plan is being implemented correctly at site. + Ensure that sufficient resources are allocated to enable full compliance with this document * Ensure that all works are being carried out as per project specifications and approved drawings. * Ensure the quality of work is as per approved standards. 25.04.2021 Page 7 of 18 [Soot Aggreko (Middle East) Limited @injsyey + Ensure that the required work inspection requests are issued to the Clients relevant representatives and coordinate the necessary inspection to be carried out by them. * Monitor the work and be in charge of the overall site activities * Monitor the progress and induce corrective and remedial provisions whenever required. + Ensure the proper implementation of contractor/subcontractor quality systems at site. * Ensure safe practices are always adhered to by subcontractors. * Identify new risks and ensure they are controlled and communicated with the team. * Ensure that safety awareness at site is continuously maintained through daily toolbox talks. * Reporton the spot any non-conformance to the supervisor. * Stop all unsafe work activities, * Assist the supervisorin carrying out his responsibilities. * Coordinate the work with the supervisor. * Directly monitor activities at site. * Ensure that the quality of the works meets the requirements of the project specifications. 6. Skills of Electrician(s) Involved The electrician (s) involved during installation and commissioning stage will be skilled in the following activities: * Installation practices. * Complying with electrical drawings, pre-commissioning checks and operational tests. * Verification of extemal supply setting. * Transformer tap settings and emergency shutdown device, intertrip logic checks. * Cabling and protection of cable with respect to rating With specific reference to HSE Standard 01 — Working with Energy, the electrician will also have the following competence requirements: * Suitable knowledge and experience of Aggreko equipment. * Suitable electrical knowledge and experience. * Suitable knowledge and experience in the type of work carried out on power station project sites. All electricians considered for authorisation will be reviewed for suitability with regard to the above competencies by the Service Team Leader (STLy/Area Manager (AM) 25.04.2021 Page 8 of 18 [Soot Aggreko (Middle East) Limited @injsyey or its equivalentin conjunction with the Electrical Authorising Officer (EAO) prior to becoming involved with installation and commissioning of Aggreko equipment, * Letter of Electrical Authorisation (LEA) as per Energy Safety Rules (ESR) as attached herewith. © Other relevant training records report from Kahuna system. + Remote assistance of Authorised Person — High Voltage (AP-HV) LEA are attached herewith. ‘Sample below to be updated based on Aggreko/ Customers requirement Project/Site LOTO Organisational Chart Name Role Contact Number Matthew Scott Electrical Authorising Officer(EAO) | +971 50 554 8769 ‘Operations Support Billy Wharton een +971 56 506 0583 Herman Breytenbach tea Support +974 6684 0769 ‘Authorised Person —High Vollage (PAKV to 45kV) Authorised Person —High Voltage (PAKV to 45kV) amy iglamo LOTO Low Voltage (250V AC/ 120V DC to 1kV) Antonio Beleganio | LOTO Low Voltage (50V AC/ 120V DC to 1kV) LOTO Low Voltage (50V AC/ 120V DC to 1kV) LOTO Low Voltage (°50V AC/120V DC to 1kV) Stewart Fuentes +971 56 686 1074 Elmer Mago +971 50 658 3280 +974 5585 7144 +974 5585 3817 Jonjon Canoy +974 5586 6543 +974 5557 3061 Leo Aguanito 7. Fitness for Work (FFW) Policy a) Employees with (country/ location) contract: b) Pre-employment medical examination conducted to ensure fitness of the employee. c) Aggreko employee shall not possess, consume, distribute or sell alcohol or illegal drugs at Customer's site. d) Sub-contractor employees will hold required documents necessary to perform the work 8. Site Induction (Aggreko) Induction includes following topics: 25.04.2021 Page 9 of 18 aieisTeI gS} > I Aggreko (Middle East) Limited aggreko a) Anexplanation of Aggreko HSE Management System (Standard Zero). b) Global Quality Policy. c) Group Health and Safety Policy d) Group Environment Policy e) Use of Personal Protective Equipment (PPE) — in case of this site hard hat, safety glasses, coverall with high visibility, safety shoes, ear defenders/plugs and hand gloves shall be used. f) Emergency contact numbers of Aggreko and the customer. g) Risk and accident reporting procedure including interface with the customer. h) Permit to Work system including interface with the customer when required. i) An overview of the customer's HSE policies specificto the site j) Hazards associated with Aggreko activities. k) Emergency evacuation routes — the customer's emergency assembly points will be explained. |) Location of Safety Data Sheets (SDS). 9, Site Induction (Customer) Where applicable, a site induction is to be organised by Aggreko with the Customers representative. 10.Risk, Positive Safety Observation (PSO), Stop Work Authority (SWA), and Accident Reporting and Investigation Aggreko's Risk, PSO, SWA, and Accident reporting forms are applicable to the following. Report categories/classifications Risk PSO SWA_| Accident Workplace Injury v NA v v ‘Occupational lines v NA v v Road Traffic Accident v NA Zz Zz Property Damage v NA v v Environmental Incident v NA v v High Potential Incident WA NA WA Vv 41. Key Performance Indicators (KPIs) / HSE Performance Key Performance Indicators monitored by Aggreko in 2022 Leading Indicators * Risk Reporting - 3iperson * Product Safety Campaigns — 90% of M01 campaigns closed within 90 days & 100% with 180 days 25.04.2021 Page 10 of 18 ar Aggreko (Middle East) Limited | Soerteo ggreko (Middle East) Limite aintste] + Management Safety Walks (CEO, CEO -1 and Business Unitanagement CEO -2 & CEO -3) - 4lyear + HSE Audits - 100% of planned audits completed and 85% Score against Standards Audit controls © Working with Energy © Lifting Operations © Lone Working Working at Height Driving at Work Transportation of Equipment Work Equipment Fitfor Work Occupational Health and Welfare Working with Harmful Substances Waste Management Pollution Prevention Use of Natural Resources eo 000000 ooo Lagging Indicators ae aataation Formula 20a Target) FottTearinssae 20008 Lost Tine uy Freie Rate (iP) PRS 000 Tota ReconobeinheyRete TAR) —_ [yes Hot ues CAW000 08 Pevoleun Release Rate PRR) os of eel HS, SPORE oot Toa rte eed 5 F Gas Release Rato(FGRR) ‘Average kW for Temperature control (TC) Equipment x 1,000, 02.22 aes ASSO Rio" aU? WARY [# oP au Vane ReSeen COMBE 00.00 om (Wosraatad ni ‘ats Dra Nee Act Sie "TORP WAR) [i Toa Vette RSSaS Tor COPSER S000 om ‘Woreraetd RlonesDiNen 12. First aid arrangement First aid is the provision of initial care for an injury. It is usually performed by non- expert, but trained personnel to an injured person until definitive medical treatment can be accessed. A first aider shall provide assistance until the professional medical assistance is provided. Generally, Aggreko shall provide one (1) trained first aider per shifton site. A first aid kit and an eye wash is usually provided and available in the control room on site. Relevant safety signs in appropriate areas and equipmentare also displayed. The customer's site first aid facility may also be used, if available and allowed by the customer. 25.04.2021 Page 11 of 18 [Soot Aggreko (Middle East) Limited @injsyey 13. Fire safety arrangement Fire marshal must be competent, adequately trained and qualified to deal with emergenciesin the eventof a fire, Upon hearing the (fire) alarm, fire marshal shall immediately (but safely) take the following actions: . Stop their activities at that point. + Take the portable fire extinguishers/fire hose reel from the nearest points. + Proceed to the location of the emergency. + Extinguish the fire, ONLY if itis safe to do so. + Instruct all personnel to evacuate to the nearest designated Assembly Point. + Sweeps the area of the responsibility to ensure all personnel have been evacuated + Proceed to the Assembly point. . Activate alarm or the applicable fire alarm system + Ensure that personnel do not re-enter the site until the “All Clear’ signal is given. + Cary out a head countimmediately and report to the ERC/ ERM and QHSE personnel. Generally, Aggreko shall provide one (1) trained firefighter per shift on site, Appropriate fire extinguishers are also provided in each equipment such as generator, fuel tank, transformer, etc. and in the control room on site. As examples, each Aggreko generator regardless of its capacity is usually provided with a 6Kg Dry Chemical Powder (DCP) type fire extinguisher, 6Kg DCP type fire extinguisher with Loadbanks, while each Aggreko 5,000L fuel tank or below is provided with a 9L Foam type fire extinguisher to name a few. A bigger size and a different type of fire extinguisher may also be provided if specified in the signed contract, Suitable spill kits are also provided with fuel tanks as part of the Emergency Response Plan. Relevantsafety signs in appropriate areas and equipmentare also displayed. The customer's site fire safety arrangementmay also be used, if available and allowed by the customer. 14, Personal Protective Equipment (PPE) Following PPE shall be used + Safety eye protection (Safety spectacles, Safety goggles) * Coverall with high visibility 25.04.2021 Page 12 of 18 [Soot Aggreko (Middle East) Limited @injsyey Safety shoes. Ear defenders. Hand gloves. Chemical gloves, apron and face shield if battery charging is required Hard hats. Others 15. Procedure 15.1 Plant and Equipment The following plantand equipmentwill be required + Chillers Air handling units Pumps Generators Fuel tanks. ClientName/Aggreko to provide cranes, forklift trucks and powered access as required. 15.2. Materials The following Materials will be required: . Hoses . Duct . Cable 15.2 Site Planning & Preparation {CLIENTNAME] to supply suitable level and compacted ground in areas detailed in SLO drawing with reference number Q-187504-D28. The area should also be suitable and safe for Aggreko to cary out the activities related to the supply of temporary power solutions. The area for Aggreko will be barricaded/cordoned off considering site conditions to ensure that the area where we work is exclusively used by Aggreko personnel and its sub-contractors. The site should be exclusively used by personnel authorised by Aggreko. The area will also be risk assessed and work related to supply of temporary power solutions will be supervised by the Operations Manager! Sales/ Service Team Leader/ Business Development Manager. 15,3 Site Handover Aggreko to ensure thatthe site is handed over back to the customer to the same state as how it was originally received from the client, 25.04.2021 Page 13 of 18 [Soothe I Aggreko (Middle East) Limited aggreko 15.4 Sequence of Works ‘Sequence Activity/Stage 01 __| Mobilise to Site 02 | Setup Site Area 03 | Lay Cable Ladders (04 | Install, Terminate (Connect) Cables 05 | Place Exhaust Stacks in Position (06 | Installation of Fuel System 07__| Test LV Cables 08 | Commissioning of Generators (09 | Commissioning of Transformers 10__| Energise the System 11__| "A" Service 12 ‘Sample 13, Service 14 Health Check 15.5 Work Methodology 15.5.1 Equipmentwill be delivered on trucks, to be offloaded on site by a mobile crane arranged by Aggreko. 15.5.2 The clientwill provide a suitable plot of level ground, to be made in advance of delivery of plantlequipment/materials. 15.5.3 Riggers/Banksmen should be made available to assist the reversing of trucks, mobile crane, on site as and when required 15.5.4 Aggreko Technicians will assist in the offloading and positioning of ‘equipment, as per SLO drawing with reference number Q-187504-D28 15.5.5 All major equipment will be laid on applicable and suitable form of flooring/paving protection such as rubber, plasticiwooden blocks, plywood wrapped with plastic sheet, to preventdamage to permanent fiooring/paving. All major equipment and its major connections will also be fully bunded. All major equipment shall also be installed with leak detection devices, to prevent contamination of permanent flooring/paving 15.5.6 Aggreko Technicians will fit ancillaries which include bolting of hoses and plugs for electrical connections. 15.5.7 Hoses and cables are to be laid in a neatand tidy fashion. 25.04.2021 Page 14 of 18 [Soot Aggreko (Middle East) Limited @injsyey 15.5.8 The client will provide a clear route for cabling and hoses from the generatorffuel tanks farms to each transformer. The client to provide ramps or scaffolds as and when required so as not to impede walkways or cause trip hazards on site 15.5.10 All electrical connections will be tested on site by competent Aggreko electricians prior to commissioning using calibrated instruments. All cables will be secured to bus bars with nutand bolt, and checked for tightness prior to energisation. If connection is to mains supply, the customer will be responsible for final termination to their transformers, if connection is to Aggreko generators this will be the responsibility of Aggreko. 15.5.11 Cables and hoses connections will be checked for integrity to ensure that there are noleakages. 15.5.12 If there is any leakage, eliminate leaks by tightening, repairing or replacing the cables and hoses with leakage and/or its components. 15.5.13 During testing stage, all electrical connections, phase rotation, etc. and cables and hoses will be re-checked. 15.5.14 If there is any leakage, after eliminating leaks by tightening, repairing or replacing the cables and hoses with leakage and/or its components, repeat the same test procedure again until itis assured that there are no leaks in the system. 15.5.15 Installation on site will be as per Aggreko standards. 155.16 Temporary power solutions package will comprise of generators, switchgears, transformers, and fuel tanks synched with each other as per Aggreko standards. 15.5.18 Aggreko will escalate to the customer any issues that hinders the safe completion of the tasks. 15.5.19 Fuel tanks supplied will be of a bunded type (i.e. fully bunded with leak detection), and hose connections will be fitted with Quick Release Couplings, which will auto close in case of inadvertentrelease to prevent any fuel spillages. 25.04.2021 Page 15 of 18 tea Aggreko (Middle East) Limited @injsyey 16. Health, Safety, Environment (HSE) 16.1 Activity Risk Assessment A tisk assessment analysing potential risks and their mitigation measures is enumerated in Section 17 of this HSE Plan. 16.2 HSE General Precautions & General Mitigation MeasuresiControls 16.2.4 Activity to be adequately supervised by competent staff. 16.2.2 All PersonneliWorkforce involved in the activity to be inducted, and received the required training/competencies BEFORE commencing the activity. 16.2.3 Supervisor/Technician In-Charge to prepare relevantdocuments and discuss itwith the workforce BEFORE commencing the activity (documents and discussion to be in the language understood by the workforce) 16.2.4 Required Permits/NOCs (including Permits To Work, as applicable) to be obtained ahead of time (BEFORE commencing the activity). 16.2.5 All Plants/Machines/Vehicles/Equipment used in the activity to be pre- inspected and approved by the competent authorised personnel. 16.2.6 HSE Procedures relevant/applicable to the activity to be reviewed by the Supervisor/Technician In-Charge, and specific precautions to be conveyed to the team and the customer. 16.27 All PersonnelWorkforce involved in the activity to fully comply with PPE requirement (Personal Protective Equipment). 16.28 Use adequate and visible HSE signage, posters and board to promote awareness. 16.2.9 Ensure adequate rest areas (welfare facilities) are accessible 16.2.10 Supervisor/Technician In-Charge to be familiar with Emergency Response Plan and Contact Numbers. Emergency contact numbers to be posted on site, 16.2.11 Aggreko will supply welfare facilities such as toilets at the vicinity of the activities prior to commencementof works. 25.04.2021 Page 16 of 18 [Soot Aggreko (Middle East) Limited @injsyey 47. Emergency Preparedness and Response 17.1 Emergency Contacts The Project Supervisor/Technician (PS/T) will have overall responsibility to coordinate and manage emergency response actions. Following the initial site meeting, the PS/T will assign emergency responsibilities to various project personnel and fill outtheir contact details in the Emergency Contact List. The PS/T in liaison with the Site HSE Officer will identify and make contact with external mutual aid agencies such as fire rescue services, ambulance evacuation services and a nearby medical facility. Once all potential external emergency responders have been identified, the emergency contacts list will be updated and displayed in prominentlocations on site and communicated to project personnel through the toolbox talks 17.2 Emergency Response Plans The four (4) high potential emergency situations which could occur during project construction, installation and commissioning phases include: + Medical emergency, personal injury including electrocution, + Fire emergency and explosion, + Environmental spill such as lubricating oils and/or diesel fuels, + Fortuitous events/Acts of God/Force Majeure (e.g.storms,earthquake,flood,etc.). Specific plans have been established to outline response protocols to be followed should any of these emergencies materialise in HSE Plan covering actions to be taken in case of the above-mentioned emergencies are covered in the Emergency Response Procedure and Plan. These emergency response plans will form part of induction briefing given to Project personnel and visitors. Aggreko stresses the cardinal rule of first and foremost protecting human life in the event of an emergency, which mustbe observed at all times. 18. Waste Management All hazardous (solid and/or liquid)and general wastes generated during any phase of the project, shall be segregated according to waste stream and accumulated in appropriately labelled skips/bins/containers then will be collected internally and taken to Aggreko [Country/location]which will be disposed of in accordance with applicable 25.04.2021 Page 17 of 18 gS) >I Aggreko (Middle East) Limited [Soot \ggreko (Middle East) Limite @injsyey local environmental regulationsby the waste managementcompany through Aggreko local sponsor/ customer [Name of the Sponsor/ customer]. 19, Risk Assessments (RAs) The RAs have been prepared analysing the potential risks and their mitigation measures. Hazards and controls associated with each of these tasks are also stated in the RAs. The RAs are genericas they are focused on the activities that we do 20. Method Statements (MSs) / Job Safety Analysis (JSAs) The MSs/JSAs have been classified into three main categories being Generator, Loadbank, and Temperature Control which also have been split into individual activityitask from “mobilising to site" to “setting up and starting up” to “commissioning and servicing of the package" to have more focus on each activitytask rather than making one complex and lengthy document. In this approach, the MSs/JSAs offer convenience in terms of review and for better understanding. Hazards and controls. associated with each of these tasks are also stated in the MSs/JSAs, The MSs/JSAs are genericas they are focused on the activities that we do. 21. Attachments (HSE and Technical) a) Enumerate all the attachments here such as Risk Assessments, Method Statements, Energy Safety Rules (ESR), Drawings, Equipment Data Sheet, Generator User Manual, Chiller User Manual, Safety Data Sheet (SDS), etc. b) Enumerate all the attachments here such as Risk Assessments, Method Statements, Energy Safety Rules (ESR), Drawings, Equipment Data Sheet, Generator User Manual, Chiller User Manual, Safety Data Sheet (SDS), etc, 25.04.2021 Page 18 of 18

You might also like