ITEM # ITEM

1 REMOVAL OF EXISTING STRUCTURE (PCCP)


2 REMOVAL OF EXISTING STRUCTURE (CURB AND GUTTER)
3 REMOVAL OF EXISTING STRUCTURE (MANHOLE)
4 PCCP(28CM)
5 PCCP(23CM)
6 SUB-BASE(20CM)
7 SUB-GRADE PREPARATION
8 RIPRAP
9 CURB AND GUTTER
10 SLAB SIDEWALK(10CM)
11 WHEEL GUARD
12 STRUCTURAL CONCRETE (MAN HOLE W/ COVER)
13 12MM DEFORMED BAR
14 16MM ROUND BAR(CENTER)
15 12MM ROUND BAR(LEF AND RIGHT)
UNIT QUANTITY
CU. METERS
CU. METERS
CU. METERS
SQ. METERS
SQ. METERS
CU. METERS
SQ. METERS
CU. METERS
LINEAR METER
SQ. METERS
CU. METERS
CU. METERS
KGS
KGS
KGS
RIPRAP
STA AREA volume
0+000.00

0+020.00

0+040.00

0+060.00

0+080.00 0.78
5.371665
0+084.89 1.417
25.4528
0+100.00 1.952
32.53984
0+116.67 1.952
4.81185
0+120.00 0.938
2.21368
0+122.36 0.938
4.34757
0+126.99 0.94
6.1147
0+140.00
0
0+146.79 146.79 1467.9
80.8521