Professional Documents
Culture Documents
APPROVED BY:
ACCU
BUILDING OFFICIAL DATE
UNIT E
UNIT D
UNIT F
UNIT C
UTILITY RM.
ACCU
SE / PE PE
UNIT B
UNIT L
UNIT G UNIT H UNIT J UNIT K
PE PE
UNIT M
UNIT A
DRAWN BY: SARAH CARDO OWNER: PROJECT TITLE: HAVING REVIEWED THE SHEET CONTENTS: SHEET NO:
MAKATI DEVELOPMENT CORPORATION DATE: 01/07/2022 SUBMITTAL,WE CERTIFY
NAME SOUTHPORTAL PROPERTIES, INC. THAT IT CONFORMS TO 8TH FLOOR AIR-CONDITIONING AND
THE ALCOVES
CHECKED BY: TEDD PLANCO, MEPF SUPERVISOR PROFESSIONAL
TOMMY E. UY VENTILATION LAYOUT M1-10
DATE: 01/10/2022 PROJECT MANAGER THE CONTRACT
PRC NO.: TIN NO.:
BV: R.B. FLORES, SR. MEPF
VALIDATED BY:
BV: G.M. JORDAN, MEPF INSPECTOR PTR NO.: DATE:
GEORGE B. BAUTISTA CONDITIONS IN ALL
DATE: 01/31/2022 ISSUED AT :
ALI-ALP HEAD
LOCATION: LUZON AVE., BRGY. MABOLO CEBU BUSINESS PARK, CEBU CITY ASPECT. AS-BUILT PLAN 12 61
66