Segment 3

DAILY FIELD
INSPECTION /
PROGRESS REPORT
WEATHER: FAIR (F) LIGHT RAIN (L) RAINY (R) STORMY (S) DATE:

24 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

NAME OF PROJECT: NLEX Widening SEGMENT: ___ 2 ___ 3


AREA:
__ Roadway/Drainage ___ Structural ___ L&G ___QA/QC ___ FOE/Non-FOE ___ESH
LOCATION / REMARKS /
ITEM NO ACTIVITY
STATION STATUS

EQUIPMENT USED: (Note: Use Equipment body number)


Operational Inactive

MANPOWER: (Note: Indicate specific trade)


Present Absent

PROBLEMS ENCOUNTERED ACTION TAKEN

PREPARED BY: NOTED BY: CONCURRED BY:

FIELD INSPECTOR SECTION HEAD PROJECT MANAGER


Attachments: Progress photos per activity