You are on page 1of 1

SAINOR LABORATORIES PVT LTD, UNIT-III

Page 1 of
DEPARTMENT: ENGINEERING
1
LIST OF EQUIPMENTS

S.No Equipment Name/Description ID.NO MOC Capacity Location


ENVIRONMENT HEALTH & SAFETY
1. Effluent Transfer Pump ETP-01 -- -- ETP 1st Floor
2. Effluent Transfer Pump(Spare) ETP-02 -- -- ETP Terrace
3. Chilling Circulation Pump CCP-03 -- -- ETP Ground Floor
4. Chilling Process Pump CPP-04 -- -- ETP Ground Floor
5. Cooling Process Pump(RT) CPP-05 -- -- ETP Ground Floor
6. Cooling Circulation Pump(Chiller) CCP-06 -- -- ETP Ground Floor
7. Chilling Compressor CC-01 -- 18 TR ETP Ground Floor
8. Chilling Compressor Tank CCT-01 MS 4 KL ETP Ground Floor
9. Cooling Tower CT-01 -- -- ETP Terrace
10. Cooling Tower CT-02 -- -- ETP Terrace
11. Cooling Tower CT-03 -- -- ETP Terrace
12. Raw Water Pump RWP-01 -- -- FHS
13. Raw Water Pump RWP-02 -- -- FHS
14. Jockey Pump JP-01 -- -- FHS
15. Main Pump MP-01 -- -- FHS
16. Diesel Pump DP-01 -- -- FHS

Prepared By: Checked By: Approved By:

Format No.: SLPL/EG-010/F-05/00

You might also like