You are on page 1of 2

Project: Garden Court Residences - Tower B & C

Package: Fire Protection System


Location: Arca South, Taguig
Contractor: SF Salazar Construction
Subject: Cost Proposal for Sleeving

TOWER B
SLEEVE SIZE/ BLOCK GROUND 2ND - 5TH
ITEM NO. TOTAL LM MATERIAL
OUT FLOOR FLOOR

1 150mm Dia. 1 4 5 2.25 1,858.00


2 75mm Dia. 3 44 47 21.15 719.00
3 50mm Dia. 8 112 120 54 404.00
4 40mm Dia. 12 108 120 54 309.00
5 600mmx300mm 1 4 5 27 (PCS) 1,300.00

TOWER C
SLEEVE SIZE/ BLOCK GROUND 2ND - 5TH
ITEM NO. OUT FLOOR FLOOR TOTAL LM MATERIAL

1 150mm Dia. 1 4 5 2.25 1,858.00


2 75mm Dia. 3 36 39 17.55 719.00
3 50mm Dia. 5 172 177 79.65 404.00
4 40mm Dia. 11 90 101 45.45 309.00
5 600mmx300mm 1 4 5 27 (PCS) 1,300.00
LABOR TOTAL AMOUNT

640.00 2,498.00 5,620.50


230.00 949.00 20,071.35
160.00 564.00 30,456.00
120.00 429.00 23,166.00
120.00 1,420.00 38,340.00
TOTAL: 117,653.85

LABOR TOTAL AMOUNT

640.00 2,498.00 5,620.50


230.00 949.00 16,654.95
160.00 564.00 44,922.60
120.00 429.00 19,498.05
120.00 1,420.00 38,340.00
TOTAL: 125,036.10