You are on page 1of 9

Line clear Requested

Sl No Circle Division Sub Divn O& M Unit Station Feeder Name & No DTC Nos Category
on

DAVANAGERE 66/11 KV
1 Davanagere Davanagere DV1 UNIT-3 F02-MCCB 24.06.2022 6 Domestic
MUSS

DAVANAGERE 66/11 KV
2 Davanagere Davanagere DV1 UNIT-3 F02-MCCB 24.06.2022 8 Domestic and Commerial
MUSS

DAVANAGERE 66/11 KV
3 Davanagere Davanagere DV1 UNIT-4 F02-MCCB 24.06.2022 8 Commerial
MUSS

4 Davanagere Hariahara HH1 Nazeer Nagara 66/11kV Benenhalli F7 NAGARAKONDA 11 KV Feeder 68 NJY

5 East SND E9 Kothanur GEDDALAHALLI F06-KOTHANUR

6 WEST Kengeri K1 Kengeri PROVIDENT MUSS F6-Doddabele feeder

VRUSHABHAVATHY
7 WEST Kengeri K1 Kengeri F12 RV College Feeder
MUSS

8 WEST Kengeri K1 Kengeri SIR MV MUSS F2 Maruthi Nagara

9 WEST Kengeri K1 Kengeri SIR MV MUSS F13 SIRMV 6th Block

66/11 KV Byadarahalli
10 WEST Kengeri K1 Kengeri F02 UAPAKER
MUSS

F04 D GROUP
66/11 KV Byadarahalli
11 WEST Kengeri K1 Kengeri LAYOUT,
MUSS
VIDYAMANAGAR

220/66/11 KV
12 WEST Kengeri K1 Kengeri SOMANAHALLI MUSS F03-VEDA-VIGNANA

66/11 KV NG HALLI F-8


13 WEST Kengeri K1 Kengeri
MUSS KORIOBANAHALLI

66/11 KV NG HALLI
14 WEST Kengeri K1 Kengeri F12 THIPPENEHALLI
MUSS

66/11 KV BRIGADE F09-AYURVEDA


15 WEST Kengeri K1 Kengeri
MEADOWS MUSS HOSPITAL
16 North Jalahalli C9 Veerupakshapura Sahakaranaga F13

17 North Jalahalli C9 Veerupakshapura Yelahanka F8

18 North Jalahalli C3 - Gokula F4

19 North Jalahalli N9 BAGALAGUNTE Widia F-6, Manjunathanagara

DF-11 EMVEE
20 BRC Nelamangala DPT Dabaspete Dabaspete
SOLAR

21 BRC Hosakote VD1 Vidyanagar Vidyanagar F07-LOCAL

F08-
22 BRC Hosakote VD1 Vidyanagar Vidyanagar
BETTAHALASUR

23 BRC Hosakote VD1 Vidyanagar Vidyanagar F09-M-V-SOLAR

24 BRC Hosakote VD1 Vidyanagar Vidyanagar F10-THE-RETRET

25 BRC Hosakote VD1 Sadahalli Vidyanagar F11-UTHOPIA

Soladevanahalli/F
26 North Jalahalli N9 Soladevanahally
4:Express

Soladevanahalli/F
27 North Jalahalli N9 Soladevanahally
8:S.Gatta

28 Tumkur Tiptur TP1 O&M-2 Tiptur F7 Town


29 Tumkur Tiptur TP1 O&M-2 Tiptur F15 Maranagere

30 Tumkur Tiptur TP1 O&M-2 Tiptur F16 Shivara NJY


Date of availing Line
Nomenclature WO No- & Date From To Duration Areas Affected
clear

Jalasiri 24*7 Water Supply Work _ 15.07.2022 10:00 16:00 06:00 Behind Gundi chowtry,MCCB block

Jalasiri 24*7 Water Supply Work _ 15.07.2022 10:00 16:00 06:00 Bapuji school to K V Shetty park area

S S LAYOUT A BLOCK ,GLASS HOUSE


AREA , BATTALY BUILDING ,
PIPE LAYING _ 15.07.2022 10:00 16:00 06:00
MAHANANDI PETROL BUNK AND
SURRONDING

Nagarakonda Village,Aladahalli, Mattihalli,


11kv Maintenance and jungle cutting - 15.07.2022 10:00 17:00 07:00 N Siranahalli, Hagari
Siranahalli ,Sasvihalli,huneasehalli

1. Termination of UG Cable works under OH to UG


2. Over Head Wire Releasing Work Tree Trimming, 11KV jump 15.07.2022 11:00 17:30 06:30 Kothanur Main , Byrathi Bande
Replacement

1. Termination of UG Cable works under OH to UG


2. To carry out the special design transformer work of tc Number-
3. Fixing of RTUs, RMU's and tree trimmng at DTC's
15.07.2022 10:00 17:00 07:00 Doddabele Road, Good darth Road
4. Dismantling works

5. Any other works

1. Termination of UG Cable works under OH to UG


2. To carry out the special design transformer work of tc Number-
3. Fixing of RTUs, RMU's and tree trimmng at DTC's Harsha layout, Vidyapit Road, BGS Hospital
15.07.2022 10:00 17:00 07:00
4. Dismantling works Road, Mysore Hyway

5. Any other works

1. Termination of UG Cable works under OH to UG


2. To carry out the special design transformer work of tc Number-
3. Fixing of RTUs, RMU's and tree trimmng at DTC's
7/15/2022 10:00 17:00 07:00 Ullal Nagar, Maruti nagar
4. Dismantling works

5. Any other works


Estimate FOR CONVERSION OF 11KV OH
LINE INTO UG
1. Termination of UG Cable works under OH to UG
CABLE SYSTEM OF EXISTING F-9
2. To carry out the special design transformer work of tc Number-
FEEDER(RHCS
3. Fixing of RTUs, RMU's and tree trimmng at DTC's
7/15/2022 10:00 17:00 07:00 LAYOUT) FEEDING FROM SIR M V
4. Dismantling works
MUSS IN
ANJANANAGARA O&M UNIT-1, K-4
5. Any other works
SUB DIVISION ON
RATE CONTRACT BASIS
1. Charging of UG Cable.
2. Master Testing of RTUs, RMU's and tree trimmng at DTC's
2. OH Conductor Releasing.
Herohalli,Madhuramma temple,Nagrahalli
3. Laying of LT AB cable.
7/15/2022 10:00 17:00 07:00 circle,Prasana layout,Nagrahalli
4. To carry out the special design transformer work
Circle,Darbey,Madheshwara,Herohalli Lake.
5. Any other works

1. Charging of UG Cable.
2. Master Testing of RTUs, RMU's and tree trimmng at DTC's
2. OH Conductor Releasing. D Group L/O,1st Block near park,Eastern
3. Laying of LT AB cable. school,Vidyamanya Nagar,Anupama school
7/15/2022 10:00 17:00 07:00
4. To carry out the special design transformer work road,Munishwara road,Near shiva temple
andrahalli main road,Peenya 2 stage,
5. Any other works

2. GOS Reconditioning work


KAGGALIPURA , VASUDEVAPURA,
KUNCHIGARAPALYA, THARALU,
3. Jump Replacement work 7/15/2022 11:00 14:00 03:00 NALLAKKANADODDY, THARALU
4. Tree Triming Work ESTATE, GOPALPURA,
5. DTC's Preventive Maintenance work (DTC Abhiyana) NAGANAKUNTE, GUTTEPALYA
6. Self Execution/ other Feeder Maintenance works if any.
1. Charging of UG Cable.
2. Master Testing of RTUs, RMU's and tree trimmng at DTC's
2. OH Conductor Releasing.
Nandagokula L/O,SLV Industrial road,SLV
3. Laying of LT AB cable.
7/15/2022 10:00 17:00 07:00 Industry,TG Palya road,Annapurneshwari
4. To carry out the special design transformer work
L/O
5. Any other works

1. Charging of UG Cable.
2. Master Testing of RTUs, RMU's and tree trimmng at DTC's
2. OH Conductor Releasing.
3. Laying of LT AB cable. Panchakukha Ganesh arch,Mangula
7/15/2022 10:00 17:00 07:00
4. To carry out the special design transformer work enclave,Thippnahalli circle

5. Any other works

2. GOS Reconditioning work

3. Jump Replacement work Udipalya, OB Choodahally, OB Choodahally


7/15/2022 11:00 14:00 03:00
4. Tree Triming Work BM Kaval,
5. DTC's Preventive Maintenance work (DTC Abhiyana)
6. Self Execution/ other Feeder Maintenance works if any.
PART OF CANARA BANK
1. 11kv feeder Maintenance,UG Cable raising & Commissioning , LT L/O,SONNAPA L/O,INDIAN EXPRESS
7/15/2022 10:00 17:00 07:00
ABC Laying & Charging and other works. L/O ,GANESHNAGARA ,TELECOM
L/O,KEMPEGOWDA NAGARA

PART OF CANARA BANK


1. 11kv feeder Maintenance,UG Cable raising & Commissioning , LT L/O,SONNAPA L/O,INDIAN EXPRESS
7/15/2022 10:00 17:00 07:00
ABC Laying & Charging and other works. L/O ,GANESHNAGARA ,TELECOM
L/O,KEMPEGOWDA NAGARA

1. 3 GOS CONVERSION WORK,


7/15/2022 10:00 16:00 06:00 RAMACHANDRAPURA
2. Feeder Maintenance work

1. UG Cable raising & Commissioning , Conversioning & Charging MANJUNATHA NAGARA, SOAP
and other works , 2. 11kv LINE maintainance, GOS maintainance, & 7/15/2022 10:00 17:00 07:00 FACTORY LAYOUT, MANJUNATHA
tree trimming NAGARA NEW EXTENTION

OH TO UG CABLE CONVERSION WORK 7/15/2022 10:30 18:30 08:00 Sompura KIADB Industrial Area,

1. Shifting of electrical Utilities from A2B Hotel to Chikjala Police


Station Phase-2B of BMRCL Project.
2. Tree Trimming Work for entire feeders. Sonnappanahalli, Vidyanagar
7/15/2022 11:00 17:00 06:00
3. TV/DIsh/FOC cable removing passing over 11kv LINE. cross,chikkajala
4. 11KV GOS maintenance work in the trunk Line.
5. Replacement of 11kv derriorated Jumps.

1. Shifting of electrical Utilities from A2B Hotel to Chikjala Police


Station Phase-2B of BMRCL Project.
2. Tree Trimming Work for entire feeders. Bettahalasur, tharahunise, thimmasandra, T
7/15/2022 11:00 17:00 06:00
3. TV/DIsh/FOC cable removing passing over 11kv LINE. Agrahara, Narayanapura
4. 11KV GOS maintenance work in the trunk Line.
5. Replacement of 11kv derriorated Jumps.

1. Shifting of electrical Utilities from A2B Hotel to Chikjala Police


Station Phase-2B of BMRCL Project.
2. Tree Trimming Work for entire feeders.
7/15/2022 11:00 17:00 06:00 MV Solar
3. TV/DIsh/FOC cable removing passing over 11kv LINE.
4. 11KV GOS maintenance work in the trunk Line.
5. Replacement of 11kv derriorated Jumps.

1. Shifting of electrical Utilities from A2B Hotel to Chikjala Police


Station Phase-2B of BMRCL Project.
2. Tree Trimming Work for entire feeders.
7/15/2022 11:00 17:00 06:00 N Agrahara,gadenahalli, retreat
3. TV/DIsh/FOC cable removing passing over 11kv LINE.
4. 11KV GOS maintenance work in the trunk Line.
5. Replacement of 11kv derriorated Jumps.

1. Shifting of electrical Utilities from A2B Hotel to Chikjala Police


Station Phase-2B of BMRCL Project.
2. Tree Trimming Work for entire feeders. Channahalli, Bynahalli, kudurugere,
7/15/2022 11:00 17:00 06:00
3. TV/DIsh/FOC cable removing passing over 11kv LINE. tharabanahalli
4. 11KV GOS maintenance work in the trunk Line.
5. Replacement of 11kv derriorated Jumps.

1. Recondutoring work. The Work for arranging power supply to an


extent of 500KVA in favour of CCBF IVF lab in Hesaraghatta O&M
Section of N9 sub division was awarded to Jyothi Electricals vide above
letter cited under reference (2). The awarded works are to be executed
under shutdown as F8 Sasuvegatta & F4 Hesagatta Express feeders are
SOLADEVANAHALLI,
running parallel from sub station which is planned to replace with
THARABANAHALLI,
coyote conductor to F08 feeder for arrange power supply to CCBF IVF
HULICHIKKANAHALLI, T.B. CROSS,
lab. Accordingly the agency has initiated the works at site and requested 7/15/2022 10:00 17:00 07:00
HESARAGHATTA BILIJAJI,
shutdown on the below dates for executing re-conductoring works at
DASENAHALLI, GUDDADAHALLI,
CCBF IVF lab. The works are awarded under DCW and payments
CPDO, DANISH FARM,
were made to BESCOM. Now Honorable Prime minister’s office is
following us to carry out the works on emergency basis. Hence, we are
hereby requesting line clearance in the below dates to execute
reconductoring and spun pole erection works.

1. Recondutoring work. The Work for arranging power supply to an


extent of 500KVA in favour of CCBF IVF lab in Hesaraghatta O&M
Section of N9 sub division was awarded to Jyothi Electricals vide above
letter cited under reference (2). The awarded works are to be executed
under shutdown as F8 Sasuvegatta & F4 Hesagatta Express feeders are
running parallel from sub station which is planned to replace with
coyote conductor to F08 feeder for arrange power supply to CCBF IVF
Sasuveghatta, Part of Soladevanahalli,
lab. Accordingly the agency has initiated the works at site and requested 7/15/2022 10:00 17:00 07:00
BWSSB, Tharabanahalli main road
shutdown on the below dates for executing re-conductoring works at
CCBF IVF lab. The works are awarded under DCW and payments
were made to BESCOM. Now Honorable Prime minister’s office is
following us to carry out the works on emergency basis. Hence, we are
hereby requesting line clearance in the below dates to execute
reconductoring and spun pole erection works.

B.H.Road, Govt Offices, Court, Police


Shifting of 11KV line work in Dr.B R Ambedkar bhavan . 7/14/2022 10:00 18:00 08:00 Quatress, Sharadanagar, Maranagere,
Siddarameshwara Badavane.
Shifting of 11KV line work in Dr.B R Ambedkar bhavan . 7/14/2022 10:00 18:00 08:00 Basavanapura, Basaveshwara nagara

Shivara, Madenur, Siddaramadevarapalya,


Shifting of 11KV line work in Dr.B R Ambedkar bhavan . 7/14/2022 10:00 18:00 08:00
Ayyanabavi
Change over
Notification If Yes, Alternate
Remarks feeders/Alternate Yes/no
required (Yes or No) P/S Details
source

Nill -