LEVEL DETAILS :

Formation level = 50.950 m


Ground Level = 48.100 m Taken at A1 location
Highest flood Level = 47.100 m (As per Hydrological Calculation)
Pile Cap Top Level = 48.009 m
Thickness of Pile Cap = 1.80 m
Pile Cap Bottom Level = 46.209 m
Length of pile below pile cap bottom = 18.00 m
Pile Founding Level = 28.210 m

MSL = 44.544 m

Pile Diamenter = 1.2 m

Pile capacity = 250.00 Tonne */(Non-Seismic case)


= 312.50 Tonne */(Seismic Case)

14.8

0.2 1.5 0.45 10.5 0.45 1.5 0.2


thick WC 0.065
FRL : 50.95
2.5%

1.42

0.5 Cap Top : 48.809

1.5 2.95

Nos. of Girder = 5 Nos.


C/c of Girder = 2.95 m