Work Order Description Site Work Type Is UBH Status Location

202124170 Pemel. Bulanan Bangunan Sipil Serandang Hub MRC PM N CLOSE PJ01ANK10GS200-SAA00


ung/Switchyard PJKL

202123971 PEMEL. RUTIN SISTEM AIR PENDINGIN PJKL MRC PM N CLOSE PJ01PAC10AP100-CWA00

202123762 PEMEL. RUTIN SISTEM PENDINGIN PLTA WDL 2 MRC PM N CLOSE WD00PAC10AT200-CWA00

202123787 PEMEL. RUTIN SISTEM KONTROL TURBIN PLTA  MRC PM N CLOSE PJ01MEA10-TFA00


PJKL

202123788 PEMEL. RUTIN SISTEM KONTROL GENERATOR  MRC PM N CLOSE PJ01BAA10GA100-SAA00


PJKL

202123789 PEMEL. RUTIN PERALATAN BENGKEL PJKL MRC PM N CLOSE PJ01ZAA10AW500-WSA00

202123790 PEMEL. RUTIN SISTEM PELUMAS BANTALAN T MRC PM N CLOSE PJ01MVA10AH200-TFA00


URBIN PJKL

202123791 PEMEL. RUTIN SISTEM PELUMAS BANTALAN SP MRC PM N CLOSE PJ01MEA10-TFA00


EED INCREASER PJKL

202123792 PEMEL. RUTIN GENSET PJKL MRC PM N CLOSE PJ01XJA10AG100-DSA00

202123793 PEMEL. RUTIN SISTEM KONTROL MAIN TRAFO  MRC PM N CLOSE SP01BAT10-TMA00


SEMPOR
202123794 PEMEL. RUTIN MAIN TRAFO SEMPOR MRC PM N CLOSE SP01BAT10-TMA00

202123795 PEMELIHARAAN RUTIN JARINGAN 20 KV GB 3 MRC PM N CLOSE SP01AJA10GA100-EKS01

202123796 PEMEL. RUTIN GENSET SEMPOR MRC PM N CLOSE SP01XJA10AE100-DSA00

202123797 PEMEL. RUTIN PERALATAN BENGKEL SEMPOR MRC PM N CLOSE SP01ZAA10AW600-WSA00

202123798 PEMEL. RUTIN GD. KANTOR, BENGKEL, DAN PR MRC PM N CLOSE SP01UYA10BF100-PHA00


ASARANA HALAMAN SEMPOR
202123799 PEMEL. RUTIN DRAINAGE SYSTEM SEMPOR MRC PM N CLOSE SP01LSL10AP100-IVA00
202123800 PEMEL. RUTIN SISTEM KONTROL TURBIN UNIT  MRC PM N CLOSE WD01MEA10-TFA01
1 PLTA WDL
202123801 PEMEL. RUTIN SISTEM KONTROL TURBIN UNIT  MRC PM N CLOSE WD02MEA10-TFA02
2 PLTA WDL
202123802 PEMEL. RUTIN SISTEM KONTROL GENERATOR  MRC PM N CLOSE WD01BAA10GA100-CDA00
#1 WDL
202123803 PEMEL. RUTIN SISTEM KONTROL GENERATOR  MRC PM N CLOSE WD02BAA10GA100-CDA00
#2 WDL
202123804 PEMEL. RUTIN SISTEM KONTROL MAIN TRAFO  MRC PM N CLOSE WD01BAT10GA100-TMA00
#1 WDL

202123805 PEMEL. RUTIN SISTEM KONTROL MAIN TRAFO  MRC PM N CLOSE WD02BAT10GA100-TMA00


#2 WDL

202123806 PEMEL. RUTIN GENERATOR #1 WDL MRC PM N CLOSE WD01BAA10-GFA01

202123807 PEMEL. RUTIN GENERATOR #2 WDL MRC PM N CLOSE WD02MKA10HB100-GFA02


202123808 PEMEL. RUTIN MAIN TRAFO #1 WDL MRC PM N CLOSE WD01BAT10GA100-TMA00

202123809 PEMEL. RUTIN MAIN TRAFO #2 WDL MRC PM N CLOSE WD02BAT10GA100-TMA00

202123810 PEMEL. RUTIN  BATTERY DAN CHARGER WDL MRC PM N CLOSE WD00ANK10GS100-BRA00

202123811 PEMEL. RUTIN TURBIN #1 WDL MRC PM N CLOSE WD01MEA10-TFA01

202123812 PEMEL. RUTIN TURBIN #2 WDL MRC PM N CLOSE WD02MEA10-TFA02

202123813 PEMEL. RUTIN GOVERNOR #1 WDL MRC PM N CLOSE WD01MEX10-IVA01

202123814 PEMEL. RUTIN GOVERNOR #2 WDL MRC PM N CLOSE WD02MEX10-IVA02

202123815 PEMEL. RUTIN SISTEM PENDINGIN PLTA WDL 1 MRC PM N CLOSE WD00PAC10BR100-CWA00

202123816 PEMEL. RUTIN MIV #1 WDL MRC PM N CLOSE WD01MEB10-IVA01


202123817 PEMEL. RUTIN MIV #2 WDL MRC PM N CLOSE WD02MEB10-IVA02

202123818 PEMEL. RUTIN 3 BULANAN CRANE WDL MRC PM N CLOSE WD00SMA10AE100-SBA00


202123819 PEMEL. RUTIN JALAN MASUK SENTRAL PLTA W MRC PM N CLOSE WD00UZA10BF300-ETA00
DL
202123820 PEMEL. RUTIN KABEL DUCT WDL MRC PM N CLOSE WD00UYA10BF100-PHA00

202123821 Pemel. Bulanan Sarana Jalan dan DAM MRC PM N CLOSE WD00UZA10BF300-ETA00


Asset Description Nomor SR WO Report Date
PJ01ANK10GS200-001 [ASSET] LOW- 12/21/21 8:01 AM
VOLTAGE SWITCHGEAR 380/220 V, AC/DC (1)

PJ01PAC10AP100-001 [ASSET] WATER PUMPS 12/14/21 4:02 PM

WD00PAC10AT200-001 [ASSET] WATER STRAINER 2 12/8/21 10:36 AM

PJ01MEA10HA100-001 [ASSET] TURBINE CASE 12/8/21 10:37 AM

PJ01BAA10GA100-001 [ASSET] BUS BAR 12/8/21 10:37 AM

PJ01ZAA10AW500-001 [ASSET] WORKSHOP TOOLS 12/8/21 10:37 AM

PJ01MVA10AH200-001 [ASSET] TURBINE BEARING LUBRICANT SUPPLY 12/8/21 10:37 AM


 SYSTEM

PJ01MEA10AU100-002 [ASSET] SPEED INCREASER (SUMITOMO) 12/8/21 10:37 AM

PJ01XJA10AG100-001 [ASSET] POWER HOUSE DIESEL ENGINE PLANT 12/8/21 10:37 AM

SP01BAT10GT200-003 [ASSET] 1,25 MVA MAIN TRANSFORMER (BAM 12/8/21 10:37 AM


BANG DJAJA)
SP01BAT10GT200-003 [ASSET] 1,25 MVA MAIN TRANSFORMER (BAM 12/8/21 10:37 AM
BANG DJAJA)
SP01AJA10GA100-001 [ASSET] Feeder Express 20 KV GB3 12/8/21 10:37 AM

SP01XJA10AE100-001 [ASSET] POWER HOUSE DIESEL 12/8/21 10:37 AM

SP01ZAA10AW600-001 [ASSET] WORKSHOP TOOLS 12/8/21 10:37 AM

SP01UYA10BF100-001 [ASSET] POWER HOUSE 12/8/21 10:37 AM

SP01LSL10AP100-001 [ASSET] WATER PUMPS 12/8/21 10:37 AM


WD01MEA10HA100-001 [ASSET] TURBINE CASE 12/8/21 10:37 AM

WD02MEA10HA100-001 [ASSET] TURBINE CASE 12/8/21 10:37 AM

WD01BAA10GA100-001 [ASSET] BUS BAR 12/8/21 10:37 AM

WD02BAA10GA100-001 [ASSET] BUS BAR 12/8/21 10:37 AM

WD01BAT10GA100-001 [ASSET] JUNCTION BOX, CABLE AND BUSH PEN 12/8/21 10:37 AM


ETRATIONS BUSHING CABLE COVERS

WD02BAT10GA100-001 [ASSET] JUNCTION BOX, CABLE AND BUSH PEN 12/8/21 10:37 AM


ETRATIONS BUSHING CABLE COVERS

WD01BAA10-001 [SYSTEM] GENERATOR LEADS 12/8/21 10:37 AM

WD02MKA10HB100-001 [ASSET] ROTOR 12/8/21 10:37 AM


WD01BAT10GA100-001 [ASSET] JUNCTION BOX, CABLE AND BUSH PEN 12/8/21 10:37 AM
ETRATIONS BUSHING CABLE COVERS

WD02BAT10GA100-001 [ASSET] JUNCTION BOX, CABLE AND BUSH PEN 12/8/21 10:37 AM


ETRATIONS BUSHING CABLE COVERS

WD00ANK10GS100-001 [ASSET] SYSTEM 110 VDC DISTRIBUTION 12/8/21 10:37 AM

WD01MEA10-001 [SUBSYSTEM] TURBINE (CASING, SHAFT, RUNN 12/8/21 10:37 AM


ER, ETC.)

WD02MEA10HB100-001 [ASSET] TURBINE SHAFT & RUNNER 12/8/21 10:37 AM

WD01MEX10AA100-001 [ASSET] GOVERNOR ACTUATOR, MAIN CONTR 12/8/21 10:37 AM


OL SYSTEM
WD02MEX10-001 [SUBSYSTEM] FLUID SUPPLY SYSTEM FOR CON 12/8/21 10:37 AM
TROL AND PROTECTION EQUIPMENT
WD00PAC10BR100-001 [ASSET] PIPEWORKS FOR UNIT 1 12/8/21 10:37 AM

WD01MEB10AA100-001 [ASSET] MAIN INLET VALVE 12/8/21 10:37 AM


WD02MEB10AA100-001 [ASSET] MAIN INLET VALVE 12/8/21 10:37 AM

WD00SMA10AE100-001 [ASSET] OVERHEAD CRANE 12/8/21 10:37 AM


WD00UZA10BF300-001 [ASSET] JALAN [LINGKUNGAN] 12/8/21 10:38 AM

WD00UYA10BF100-001 [ASSET] POWER HOUSE 12/8/21 10:38 AM

WD00UZA10BF300-001 [ASSET] JALAN [LINGKUNGAN] 12/8/21 10:38 AM


WO Report By Target Finish Sistem Owner Seksi Sub Seksi NO. Gangguan Pronia Priority
MRC.RENVALHAR1 1/20/22 10:00 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/10/22 10:00 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/4/22 11:05 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/4/22 10:00 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/3/22 9:45 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/5/22 1:00 PM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/6/22 11:00 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/6/22 10:00 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/5/22 9:55 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/3/22 9:45 AM SPS.PLTA WDL 3


MRC.RENVALHAR1 1/3/22 9:00 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/6/22 11:30 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/5/22 9:55 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/4/22 3:30 PM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/4/22 1:25 PM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/3/22 2:45 PM SPS.PLTA WDL 3


MRC.RENVALHAR1 1/4/22 10:00 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/4/22 10:00 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/3/22 9:45 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/3/22 9:45 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/6/22 9:45 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/6/22 9:45 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/3/22 9:00 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/3/22 9:00 AM SPS.PLTA WDL 3


MRC.RENVALHAR1 1/6/22 11:50 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/6/22 11:50 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/3/22 9:00 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/4/22 9:30 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/4/22 9:50 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/5/22 11:35 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/5/22 11:35 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/4/22 10:05 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/5/22 11:00 AM SPS.PLTA WDL 3


MRC.RENVALHAR1 1/5/22 11:00 AM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/4/22 1:00 PM SPS.PLTA WDL 3


MRC.RENVALHAR1 1/4/22 1:00 PM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/6/22 12:00 PM SPS.PLTA WDL 3

MRC.RENVALHAR1 1/6/22 11:25 AM SPS.PLTA WDL 3


Duration Scheduled Start Scheduled Finish Actual Start Actual Finish Unit Last Wellness Failure Code
2:00 1/6/22 8:00 AM 1/6/22 10:00 AM 1/6/22 8:00 AM 1/6/22 10:00 AM PJKL HIJAU

1:00 1/6/22 10:00 AM 1/6/22 11:00 AM 1/6/22 10:00 AM 1/6/22 11:00 AM PJKL HIJAU

1:05 1/4/22 2:25 PM 1/4/22 3:30 PM 1/4/22 2:25 PM 1/4/22 3:30 PM WDLC HIJAU

1:00 1/3/22 8:45 AM 1/3/22 9:45 AM 1/3/22 8:45 AM 1/3/22 9:45 AM PJKL HIJAU

0:45 1/3/22 8:00 AM 1/3/22 8:45 AM 1/3/22 8:00 AM 1/3/22 8:45 AM PJKL HIJAU

5:00 1/4/22 8:00 AM 1/4/22 8:00 AM 1/4/22 7:51 AM 1/4/22 1:00 PM PJKL HIJAU

1:00 1/5/22 9:00 AM 1/5/22 10:00 AM 1/5/22 8:47 AM 1/5/22 10:00 AM PJKL HIJAU

1:00 1/5/22 8:00 AM 1/5/22 9:00 AM 1/5/22 8:00 AM 1/5/22 9:00 AM PJKL HIJAU

0:55 1/3/22 9:45 AM 1/3/22 10:40 AM 1/3/22 9:45 AM 1/3/22 10:40 AM PJKL HIJAU

0:45 1/3/22 9:00 AM 1/3/22 9:45 AM 1/3/22 9:40 AM 1/3/22 10:30 AM SMPR HIJAU
1:00 1/3/22 8:00 AM 1/3/22 9:00 AM 1/3/22 9:00 AM 1/3/22 10:00 AM SMPR HIJAU

3:30 1/6/22 8:55 AM 1/6/22 12:25 PM 1/6/22 9:00 AM 1/6/22 12:30 PM SMPR HIJAU

0:55 1/6/22 8:00 AM 1/6/22 8:55 AM 1/6/22 2:00 PM 1/6/22 2:55 PM SMPR HIJAU

5:00 1/5/22 8:00 AM 1/5/22 1:00 PM 1/5/22 9:00 AM 1/5/22 2:00 PM SMPR HIJAU

3:25 1/4/22 9:45 AM 1/4/22 1:10 PM 1/4/22 11:00 AM 1/4/22 2:15 PM SMPR HIJAU

1:45 1/4/22 8:00 AM 1/4/22 8:00 AM 1/4/22 1:00 PM 1/4/22 2:35 PM SMPR HIJAU
1:00 1/4/22 11:20 AM 1/4/22 12:20 PM 1/4/22 9:00 AM 1/4/22 10:00 AM WDL1 HIJAU

1:00 1/4/22 12:20 PM 1/4/22 1:20 PM 1/4/22 8:00 AM 1/4/22 9:00 AM WDL2 HIJAU

0:45 1/3/22 11:00 AM 1/3/22 11:45 AM 1/3/22 10:00 AM 1/3/22 10:45 AM WDL1 HIJAU

0:45 1/3/22 11:45 AM 1/3/22 12:30 PM 1/3/22 10:45 AM 1/3/22 11:30 AM WDL2 HIJAU

0:45 1/6/22 8:00 AM 1/6/22 8:45 AM 1/6/22 8:00 AM 1/6/22 8:45 AM WDL1 HIJAU

0:45 1/6/22 8:45 AM 1/6/22 9:30 AM 1/6/22 1:00 PM 1/6/22 1:45 PM WDL2 HIJAU

1:00 1/3/22 8:00 AM 1/3/22 9:00 AM 1/3/22 8:00 AM 1/3/22 9:00 AM WDL1

1:00 1/3/22 9:00 AM 1/3/22 10:00 AM 1/3/22 9:00 AM 1/3/22 10:00 AM WDL2 HIJAU
3:50 1/6/22 8:00 AM 1/6/22 11:50 AM 1/6/22 8:00 AM 1/6/22 11:50 AM WDL1 HIJAU

3:50 1/6/22 11:50 AM 1/6/22 3:40 PM 1/6/22 8:00 AM 1/6/22 11:50 AM WDL2 HIJAU

1:00 1/3/22 10:00 AM 1/3/22 11:00 AM 1/3/22 10:00 AM 1/3/22 11:00 AM WDLC MERAH

1:30 1/4/22 8:00 AM 1/4/22 9:30 AM 1/4/22 10:00 AM 1/4/22 11:25 AM WDL1

1:50 1/4/22 9:30 AM 1/4/22 11:20 AM 1/4/22 1:00 PM 1/4/22 2:50 PM WDL2 HIJAU

3:35 1/5/22 10:00 AM 1/5/22 1:35 PM 1/5/22 11:50 AM 1/5/22 3:25 PM WDL1 HIJAU

3:35 1/5/22 8:00 AM 1/5/22 8:00 AM 1/5/22 8:00 AM 1/5/22 11:35 AM WDL2

1:05 1/4/22 1:20 PM 1/4/22 2:25 PM 1/4/22 1:20 PM 1/4/22 2:25 PM WDLC HIJAU

1:00 1/5/22 8:00 AM 1/5/22 9:00 AM 1/5/22 9:00 AM 1/5/22 10:00 AM WDL1 HIJAU
1:00 1/5/22 9:00 AM 1/5/22 10:00 AM 1/5/22 8:00 AM 1/5/22 9:00 AM WDL2 HIJAU

5:00 1/4/22 8:00 AM 1/4/22 1:00 PM 1/4/22 8:00 AM 1/4/22 12:57 PM WDLC HIJAU
2:00 1/4/22 1:00 PM 1/4/22 3:00 PM 1/4/22 8:00 AM 1/4/22 10:00 AM WDLC HIJAU

1:00 1/6/22 12:00 PM 1/6/22 1:00 PM 1/6/22 10:00 AM 1/6/22 12:00 PM WDLC HIJAU

3:25 1/6/22 9:30 AM 1/6/22 12:55 PM 1/6/22 11:00 AM 1/6/22 2:35 PM WDLC HIJAU
Problem Code PM SCHED-OK Statusdate COMP Statusdate CLOSE Statusdate Schedule Commit
PM/PJ/S/005 12/30/21 9:01 PM 1/7/22 3:58 PM 1/7/22 3:58 PM

PM/PJ/M/101 12/30/21 9:03 PM 1/7/22 3:59 PM 1/7/22 3:59 PM

PM-45117 12/30/21 7:49 PM 1/7/22 8:32 AM 1/7/22 8:34 AM

PM/PJ/K/111 12/30/21 7:42 PM 1/7/22 8:34 AM 1/7/22 8:37 AM

PM/PJ/K/112 12/30/21 7:42 PM 1/7/22 8:37 AM 1/7/22 8:37 AM

PM/PJ/M/103 12/30/21 8:47 PM 1/7/22 8:38 AM 1/7/22 8:42 AM

PM/PJ/M/139 12/30/21 8:53 PM 1/7/22 8:59 AM 1/7/22 9:01 AM

PM/PJ/M/141 12/30/21 8:53 PM 1/7/22 9:03 AM 1/7/22 9:03 AM

PM/PJ/M/143 12/30/21 7:43 PM 1/7/22 9:03 AM 1/7/22 9:05 AM

PM/SP/K/077 12/30/21 7:44 PM 1/7/22 9:17 AM 1/7/22 9:18 AM


PM/SP/L/069 12/30/21 7:43 PM 1/7/22 9:18 AM 1/7/22 9:19 AM

PM/SP/L/142 12/30/21 8:59 PM 1/7/22 3:59 PM 1/7/22 3:59 PM

PM/SP/M/065 12/30/21 8:58 PM 1/7/22 4:00 PM 1/7/22 4:00 PM

PM/SP/M/066 12/30/21 8:54 PM 1/7/22 9:19 AM 1/7/22 9:22 AM

PM/SP/S/054 12/30/21 8:49 PM 1/7/22 9:22 AM 1/7/22 9:23 AM

PM/SP/S/056 12/30/21 8:49 PM 1/7/22 9:25 AM 1/7/22 9:26 AM


PM/WD/K/034 12/30/21 7:48 PM 1/7/22 9:26 AM 1/7/22 9:26 AM

PM/WD/K/035 12/30/21 7:48 PM 1/7/22 9:27 AM 1/7/22 9:27 AM

PM/WD/K/036 12/30/21 7:41 PM 1/7/22 9:27 AM 1/7/22 9:27 AM

PM/WD/K/037 12/30/21 7:41 PM 1/7/22 9:28 AM 1/7/22 9:28 AM

PM/WD/K/040 12/30/21 8:55 PM 1/7/22 4:01 PM 1/7/22 4:01 PM

PM/WD/K/041 12/30/21 8:55 PM 1/7/22 4:01 PM 1/7/22 4:01 PM

PM/WD/L/022 12/30/21 7:39 PM 1/7/22 9:29 AM 1/7/22 9:29 AM

PM/WD/L/023 12/30/21 7:40 PM 1/7/22 9:29 AM 1/7/22 9:30 AM


PM/WD/L/026 12/30/21 8:56 PM 1/7/22 4:02 PM 1/7/22 4:03 PM

PM/WD/L/027 12/30/21 8:57 PM 1/7/22 4:03 PM 1/7/22 4:05 PM

PM/WD/L/031 12/30/21 7:40 PM 1/7/22 9:30 AM 1/7/22 9:31 AM

PM/WD/M/009 12/30/21 7:47 PM 1/7/22 9:31 AM 1/7/22 9:32 AM

PM/WD/M/010 12/30/21 7:48 PM 1/7/22 9:32 AM 1/7/22 9:33 AM

PM/WD/M/011 12/30/21 8:52 PM 1/7/22 9:33 AM 1/7/22 9:34 AM

PM/WD/M/012 12/30/21 8:52 PM 1/7/22 9:35 AM 1/7/22 9:36 AM

PM/WD/M/013 12/30/21 7:49 PM 1/7/22 9:36 AM 1/7/22 9:37 AM

PM/WD/M/014 12/30/21 8:50 PM 1/7/22 9:37 AM 1/7/22 9:38 AM


PM/WD/M/015 12/30/21 8:50 PM 1/7/22 9:38 AM 1/7/22 9:39 AM

PM/WD/M/019 12/30/21 8:14 PM 1/7/22 9:39 AM 1/7/22 9:43 AM


PM/WD/S/005 12/30/21 8:46 PM 1/7/22 9:43 AM 1/7/22 9:46 AM

PM/WD/S/008 12/30/21 8:57 PM 1/7/22 4:05 PM 1/7/22 4:05 PM

PM/WD/S/013 12/30/21 8:56 PM 1/7/22 4:05 PM 1/7/22 4:06 PM


Job Plan Worklog Description
JP/R/PJ/ANK/005 normal dengan catatan

JP/P/PJ/PAC/179 normal dengan catatan

JP/R/WD/PAC/112 Normal dengan temuan

JP/R/WD/MEA/129 normal dengan catatan

JP/R/WD/MKA/130 normal dengan catatan

JP/R/WD/ZAA/116 NORMAL DENGAN CATATAN

JP/R/SP/MKV/148 normal dengan catatan

JP/R/SP/MKV/148 normal dengan catatan

JP/R/SP/XJA/153 normal dengan catatan

JP/R/WD/BAT/132 Rasio parameter analog tidak sesuai
JP/R/SP/BAT/157 Main trafo normal operasi

JP/R/SP/AJA/220 Pohon mendekati kabel jaringan

JP/R/SP/XJA/153 Adanya temuan

JP/R/WD/ZAA/116 Adanya temuan

JP/R/WD/UYA/101 Cat kusam, atap bocor dan rusak

JP/R/WD/LSL/103 Normal
JP/R/WD/MEA/129 Normal

JP/R/WD/MEA/129 Normal

JP/R/WD/MKA/130 Normal, temuan

JP/R/WD/MKA/130 Normal

JP/R/WD/BAT/132 Normal dengan temuan

JP/R/WD/BAT/132 Normal, temuan

JP/R/WD/MKA/118 Normal dengan temuan

JP/R/WD/MKA/118 Normal dengan temuan
JP/R/WD/BAT/121 Normal dengan temuan

JP/R/WD/BAT/121 Normal, temuan

JP/R/WD/ANK/126 Normal dengan temuan

JP/R/WD/MEA/183 Normal, temuan

JP/R/WD/MEA/110 Normal, temuan

JP/R/WD/MEX/111 Normal, temuan

JP/R/WD/MEX/111 Normal, temuan

JP/R/WD/PAC/112 Normal dengan temuan

JP/R/WD/MEB/113 Normal
JP/R/WD/MEB/113 Normal, temuan

JP/R/WD/SMA/115 Normal
JP/R/WD/UZA/105 Normal

JP/R/WDL/UYA/109 Normal, temuan

JP/R/WD/UZA/004 Normal catatan
Failure Information
Catatan :
- Pondasi tiang transmisi sisi tiang ABSW kondisi rusak
-Tebing sisi samping tiang transmisi/tiang ABSW mudah longsor
saat musim hujan

Catatan:
- Motor strainer tidak dioperasikan, karena material control pada
panel tidak lengkap
- Valve CWS sebelum MIV (utama) abnormal (bocor) saat di
tutup maupun di buka, harus dilakukan penggantian

Indikasi parameter pada flow bearing turbin abnormal.

Catatan:
- Penunjuk suhu lokal (bordon) axial 1 dan radial 2 abnormal
(Rusak)
- Presure minyak pelumas turbin bearing 3.2 bar, batas min 2.8
bar dan normal di 4.5 bar
- Suara motor pompa no.1 agak kasar dan push button tidak
berfungsi
- Penunjuk suhu lokal (bourdon) axial 1 dan radial 2 abnormal
(Rusak)

Catatan:
- Thermomether Sika type 292B Angle 90 derajat abnormal
(Rusak)
- Parameter temperatur oil after cooling water system to bearing
kondisi rusak

Catatan:
- Peralatan bengkel (tang riper, tang press skun, mesin gergaji)
dalam kondisi rusak, perlu pengadaan
- Perlu pengadaan mata bor 1 set, dan batu gerinda DO 120 mm,
diameter dalam 12,16 mm.

Catatan:
- Rembesan oli pada sambungan baut RTD dan juga deket shaft
turbin
- Suara motor pompa no.1 agak kasar dan push button tidak
berfungsi
- Penunjuk suhu lokal (bordon) axial 1 dan radial 2 abnormal
(Rusak)

Catatan:
- Rembesan minyak pada cover speed increaser
- RTD PT 100 abnormal, perlu penggantian
- Penunjuk tekanan (PI) abnormal

Radiator bocor saat genset beroperasi


Terdapat perbedaan / deviasi pembacaan tegangan genset
(panel dan AVO meter)
parameter analog arus tidak membaca dengan normal. Karena
pasca penggantian CT, rasio tidak sesuai.
Rasio semula 50/5
Rasio saat ini 40/1
Temuan bambu di tiang no 63 - 64 sudah di rabas rabas
Temuan tanaman menjalar di tiang 62 sudah di rabas rabas
Temuan :
- Eternit ruang genset rembes
- Perlu pengadaan cooler : 10 liter
- Perlu pengadaan oli : 16 liter

Mesin bubut tidak bisa digunakan lagi

Layar magelis dan layar powermeter dalam kondisi fail

1. Temuan :
- Pembacaan Counter Arrester phase T kurang jelas
- parameter indikator temp. Concervator abnormal pembacaan
- mika pembacaan parameter temp. Winding sudah rapuh dan
retak
- masih terdapat bocoran minyak pada BCT phasa T

1. Temuan :
- Pembacaan Counter Arrester phase T kurang jelas
- parameter indikator temp. Concervator abnormal pembacaan
- mika pembacaan parameter temp. Winding sudah rapuh dan
retak
- masih terdapat bocoran minyak pada BCT phasa T

1. Temuan :
> Muncul indikator shaft deflection abnormal
pada parameter vibration monitor
> Terdapat beberapa lampu indikator mati di
control desk
> Heater generator tidak mau bekerja secara
otomatis
> Terdapat pegas holder carbon brush yang
udah lemah yaitu no 8 lower, no 11 upper d an no 10 upper
> Baut cover generator kurang 2 buah (M 12 x 50 mm)

> Terdapat beberapa lampu indikator mati dicontrol desk


> Sebagian kramik dinding area ruang generator dalam kondisi
rusak
1. Temuan :
- Masih terdapat rembesan minyak pada BCT phasa R dan S,
rembesan sudah di arahkan ke penampung.
- parameter indikator temp. Concervator abnormal pembacaan

1. Temuan :
- Pembacaan Counter Arrester phase T kurang jelas
- parameter indikator temp. Concervator abnormal pembacaan
- masih terdapat bocoran minyak pada BCT phasa T

Keramik R. Battery rusak dan pecah sebanyak 5 buah

Temuan :
- terdapat rembesan minyak yang berasal dari cover lower
bearing generator.
- terdapat kebocoran pada pipa air admition (temuan AI)

Temuan :
- terdapat rembesan minyak yang berasal dari cover lower
bearing generator.
- terdapat kebocoran pada pipa runner side (temuan AI)
- tekanan air pipa indicator pressure shaft seal lemah

Terdapat rembesan minyak yang berasal dari actuator governor.

terdapat rembesan minyak pada flange yang menuju


servomotor MIV

1. Perlu pembuatan strimin pembatas untuk mencegah hewan


asing masuk area kabel duct (115 cm x 95 cm)
2. Temuan :
- terdapat rembesan air di antara tembok pada titik 12 - 13 (118
m) ketika hujan tiba
- terdapat isolator kabel duct (6,3 kV) yang mulai pecah pecah
dan mengelupas