You are on page 1of 1
Service Manual Chapter 2—System installation he Receiving and Unpacking Instructions SERIES a Chapter 2—System Installation 1.0 Receiving and Unpacking Instructions 1d ‘The following sections detail receiving and unpacking instructions. Inspections required prior to installing the M-IV are also included. Room Planning ‘The exam room layout should be pre-planned before the arrival of the M-1V. A typical room layout (9 ft. x 12 ft.) is shown in Figure 2-1 = ——— ——— Wireruns. Figure 2-1: M-IV—Typical Room Layout Factors to consider when planning the room layout are: 1. Measure the height and width of the room door to ensure it accommodates the Gantry and Operator Console (75 in. high, 36 in. wide minimum). Refer to ‘Appendix A, Section 4.0, p. A-2. 2. Take into consideration extra wall and ceiling clearance for movement and handling of arm controls. C-arm clearances—The C-arm requires 53 in. (minimum) to accommodate rotation, and 84 in. (minimum) to accommodate raising the C-arm to its ‘upper limit 3. Movement Clearance—Always take into consideration space allocation for patient and technologist moverient. Avoid obstructions in the room that may hinder access to the system controls or the patient. 4. Storage—Provide convenient storage for patient records andl system devices. If accessory storage is not possible within the exam room, make arrangements for safe storage close by. Physical and Environmental Requirements: ‘© Operating Temperature Range—10°C to 40°C (50°F to 104°F) + Relative Humidity Range—30% to 75% non-condensing 6. Recommended Power Source Requirements. See Appendix A, Section 1.0, p. A-1 P/N MANO0341

You might also like