INSTALLATION/MAINTENANCE INSTRUCTIONS
Medium Voltage
Vacuum Power Circuit Breakers
VHK Model 05
VHKX Model 05
TABLE OF CONTENTS
INTRODUCTION ........................................................................................................... 4
INSTALLATION............................................................................................................. 4
GENERAL.................................................................................................................... 4
GENERAL INSPECTION ................................................................................................. 5
VACUUM INTERRUPTER EXAMINATION .......................................................................... 5
BARRIER AND INSULATION INSPECTION ........................................................................ 5
INSTALLING FRONT BARRIER ....................................................................................... 5
MANUAL OPERATION FOR INSPECTION......................................................................... 5
PADLOCK PROVISION .................................................................................................. 6
INTERLOCKS ............................................................................................................... 6
INSTALLING CIRCUIT BREAKER INTO COMPARTMENT .................................................... 8
CIRCUIT BREAKER REMOVAL................................................................................... 9
REMOVAL FROM CONNECT POSITION ....................................................................... 9
REMOVAL FROM TEST POSITION ................................................................................ 9
REMOVAL FROM DISCONNECT POSITION ................................................................. 9
SAFE OPERATIONS RECOMMENDATIONS ...................................................................... 9
ADJUSTMENTS, TESTS AND PERIODIC MAINTENANCE........................................ 9
INSULATION CLEANING .............................................................................................. 10
DC MILLIVOLT DROP TEST / MICRO-OHM TEST.......................................................... 10
CONTACT WEAR AND CONTACT PRESSURE ................................................................ 10
CONTACT GAP .......................................................................................................... 11
CONTACT GAP CHECK - MODEL 05D/81/82 ............................................................... 11
CONTACT GAP CHECK - MODEL 05C ......................................................................... 11
CONTACT SEQUENCING ............................................................................................. 12
CLOSING AND OPENING TIMES .................................................................................. 12
CLOSING AND OPENING SPEEDS................................................................................ 13
LATCH CHECK SWITCH .............................................................................................. 13
LUBRICATION ............................................................................................................ 13
DIELECTRIC TESTS.................................................................................................... 14
ELECTRICAL CHARACTERISTICS OF CONTROL DEVICES ................................. 15
DC AND AC CLOSING OPERATING SEQUENCE ........................................................... 15
AC CLOSING OPERATING SEQUENCE ........................................................................ 16
GROUND AND TEST DEVICES ................................................................................. 17
RENEWAL PARTS...................................................................................................... 17
3
IB 6.2.7.7-1I
APPENDIX
FIGURE A1 - CIRCUIT BREAKER ASSEMBLY WITH LIFTING YOKE INSTALLED.............. 18
FIGURE A2 - FRONT CIRCUIT BREAKER PANEL ......................................................... 19
FIGURE A3 - RACKING MECHANISM .......................................................................... 20
FIGURE A4 - INTERLOCK SYSTEM ............................................................................. 21
FIGURE A5 - METHOD OF RACKING CIRCUIT BREAKER ............................................. 22
FIGURE A6 - CONTACT WIPE & GAP MEASUREMENT (MODEL 05D/81/82) ................ 23
FIGURE A7 - CONTACT WIPE & GAP MEASUREMENT (MODEL 05C) .......................... 24
FIGURE A8 - TRIP LATCH CHECK SWITCH ADJUSTMENT............................................ 25
FIGURE A9 - CONTROL RELAY ................................................................................. 26
FIGURE A10 - TYPICAL DC SCHEMATIC OF CONTROL CIRCUIT ................................... 27
FIGURE A11 - TYPICAL AC SCHEMATIC OF CONTROL CIRCUIT ................................... 28
TABLE A1 - CONTROL CIRCUIT OPERATING VOLTAGE RANGE .................................. 29
TABLE A2 - CONTROL CIRCUIT TYPICAL CURRENT VALUES ..................................... 29
TABLE A3 - VHK OPERATING PARAMETERS ........................................................... 30
These instructions do not purport to cover all details or variations nor to provide for every possible
contingency to be met in connection with installation, operation, or maintenance. Should further
information be desired or should particular problems arise which are not covered sufficiently for the
purchaser’s purpose the matter should be referred to the nearest District Office.
4
IB 6.2.7.7-1I
WARNING
Not adhering to these instructions can result in INSTALLATION
personal injury or DEATH, and damage to the
breaker.
General
RECEIVING AND STORAGE ABB VHK Vacuum Circuit Breakers are shipped
with the contacts closed, closing springs
discharged and opening springs charged. This is
Immediately upon receipt of the circuit breaker, to protect against the possibility of the contacts
examine it to determine if any damage or loss was striking the inside of the vacuum interrupter
sustained during transit. If abuse or incorrect enclosure and damaging themselves during
handling is evident, file a damage claim at once shipping.
with the carrier, and promptly notify the nearest
District Office. The company is not responsible for WARNING
damage of goods after delivery to the carrier. We Prior to any disassembly or inspection of the circuit
will, however, lend assistance if notified of claims. breaker, the closing springs must be discharged,
and the breaker should be open. Failing to do so
Unpack the circuit breaker as soon as possible could result in personal injury.
after receipt. If unpacking is delayed, difficulty
may be experienced in making a claim for If the circuit breaker is equipped with an
damages not evident upon receipt. Use care Undervoltage Trip Device (a.k.a. UVTD), the
during unpacking in order to avoid damaging any retaining strap applied to the UVTD at the factory
of the circuit breaker parts. Check the contents of must be removed. The retaining strap was
each device against the packing list before applied to hold the Armature of the UVTD in the
discarding any packing material. If any shortage energized position so the breaker could be closed.
of material is discovered, promptly notify the If the Retaining Strap is not removed, the UVTD
nearest District Office. Information specifying the will not be able to trip the breaker.
5
IB 6.2.7.7-1I
Inspect the condition of the circuit breaker vacuum Installing Front Barrier
interrupters and electrical connections prior to
installing the circuit breaker into the compartment. Install the assembly with eight mounting screws.
Even though each circuit breaker is completely Refer to Figure A1 in the Appendix.
adjusted and tested at the factory, shipping and
handling conditions, and/or incorrect storage could Note: It is recommended that a dielectric
cause defects. withstand test be performed prior to initially putting
this or any type vacuum circuit breaker into
The Front Cover and Lexan Interphase Barrier service. Refer to "Dielectric Tests" in the
assembly (2, Figure A1) must be removed for "Adjustments, Tests and Periodic Maintenance"
access to and inspection of the vacuum section for the correct test procedure.
interrupters and their associated adjustments.
Manual Operation For Inspection
Vacuum Interrupter Examination
The electrically operated circuit breakers can be
WARNING charged manually with a removable Manual
If the circuit breaker has been energized, or it is Charge Handle for bench tests or emergency
unsure if the circuit breaker has ever been operation. The removable Manual Charge Handle
energized, the mid-band ring (on vacuum is an accessory, and is supplied only when
interrupters so equipped) must first be discharged ordered.
before any work is performed on or near the
interrupters. A grounding stick must be used to Position the Manual Charge Handle onto the
discharge the ring by fastening the ground cable of Manual Charging Lever. See Figure A2 in the
the stick to a known ground and touching the Appendix. Push down on the manual closing
grounding tip of the stick to each mid-band ring.
handle until it will not travel any further. This
partially charges the closing springs. Repeat this
The insulated vacuum container should be operation until the charging mechanism is heard to
examined carefully for cracks in the area of the snap over center (approximately 10 operations),
metal-to-insulation interface seals on both ends and the Spring Indicator clearly shows the
and around the Mid-Band Ring. See Figure A6 in message SPRINGS CHARGED. The circuit
the Appendix. Since a certain amount of breaker can now be closed by pulling out on the
transmitted light is usually required to detect Manual Close Lever. The circuit breaker can then
cracks, the inspection should be done in a well be opened by pressing the Manual Trip Button.
lighted area. If the mid-band ring, when so
equipped, has been bent by accidental impact,
that area should be specially scrutinized for seal
damage. Small external chips will not impair the
useful life of the interrupter.
NOTE: As a special option, the breaker may be NOTE: See Figure A4 for the location of the
ordered with Three-Position Padlocking, which Adjusting Srew to be shimmed referred to in
also permits the breaker to be padlocked in the Step 4
CONNECT position.
4. To add or remove shim washers, position
Interlocks (Racking Mechanism) the Racking Mechanism in the CONNECT
position. Remove the nut securing the
The four mechanical interlocks that work in screw and shim washers, add or subtract
conjunction with the Racking Mechanism to one shim washer, reassemble and retest.
protect both user and breaker should function as
specified below. If malfunction is identified and B. The Rack Screw cannot be turned to move the
the recommended adjustments do not correct the breaker from the DISCONNECT, TEST and
problems, consult the factory before placing the CONNECT positions unless the Release
breaker in service. Lever is first operated. A finger in the Index
Lever engages one of three holes in the Rack
Refer to the next sections, "Installing Circuit Screw corresponding to each of the previously
Breaker Into Compartment" and "Removing Circuit mentioned positions, preventing it from
Breaker," for a complete description of the rotating. Turning the Release Lever to the left
Racking Mechanism components and operation. disengages the finger from the hole, allowing
the Rack Screw to be rotated.
(release) position. If so, see if it can be position. Charge and Close the breaker,
freed. and then press the Manual Trip Button.
2. Visually inspect that the finger of the Index NOTE: If the breaker does not trip, the Trip
Lever is engaging in the corresponding Latch and/or linkage is at fault. Contact the
interlock hole in the Rack Screw. Customer Service Center for assistance.
NOTE: If the Release Lever cannot be turned to If the breaker does trip properly, the
the left, make sure breaker is first in the Open Adjustable Link must be readjusted per the
position. following steps:
C. The Release Lever cannot be operated when 2. Charge and close the breaker. The gap
the breaker is in the closed position. This between the L-shaped Blocking Lever
prevents connecting or disconnecting the Extension and the Trip Lever typically is
breaker from the Primary Stabs in the between 0.03" - 0.09" (0.8 - 2.4mm). See
compartment with the breaker closed. A Figure A3 in the Appendix.
Racking Lock Bracket, operated by the
breaker’s Jackshaft, blocks the Index Lever 3. Remove the Retaining Ring from one of
when the Jackshaft is in the closed position. If the two pins securing the Adjustable Link,
the interlock is not functioning as noted, and disconnect the Adjustable Link from
perform the following inspections. Refer to that pin.
Figures A3 and A4 in the Appendix.
4. Rotate the free end of the Adjustable Link
1. Check that the Racking Lock Bracket is one-half (½) turn to increase its length.
connected to the Jackshaft via a Link. If This will advance the trip linkage.
not, reconnect.
5. Reconnect the Adjustable Link to the pin
NOTE: The Operations Counter and the and retest.
Open/Closed Indicator are also driven by the
same Racking Lock Bracket. 6. If the breaker does not trip when
reconnecting the Adjustable Link, repeat
2. Check that nothing in the Racking steps (4), (5) and (6) above.
Mechanism is bent.
If the breaker does trip when connecting the
D. When the circuit breaker is between the trip link, one final adjustment is necessary.
WITHDRAW, DISCONNECT, TEST and Remove the link and rotate the free end of the
CONNECT positions, any attempt to close the Adjustable Link one (1) turn to decrease its
breaker will discharge the Closing Springs, length. This will retard the trip linkage,
and the contacts will not close. This is referred allowing the breaker to close when the
to as "Trip Free" operation. The finger of the Racking Mechanism is in the DISCONNECT,
Index Lever rides on the circumference of the TEST or CONNECT position.
Rack Screw, holding the Release Lever in its
release position. A linkage between the 7. The interlock should now be properly
Release Lever and Trip Latch holds the Trip adjusted. Confirm by retesting the
Latch in its unlatched position. If this interlock interlock.
is not functioning as noted, perform the
following: 8. If the interlock is now functioning properly,
replace the retainer removed in step 2.
1. Confirm that the Trip Latches are properly
adjusted and functioning. Position the
Rack Screw so the Rack Mechanism is in
the DISCONNECT, TEST or CONNECT
8
IB 6.2.7.7-1I
2. Turn the Release Lever to the left, rotate ADJUSTMENTS, TESTS AND
Crank counterclockwise ¼-turn, and then
PERIODIC MAINTENANCE
release the Rack Release Lever. It will remain
in the released position. Continue rotating the
crank counterclockwise until the Racking
Mechanism automatically stops at the TEST The circuit breakers are designed and tested to
position. insure minimum maintenance. The few
adjustments that are noted are required only when
Removal From TEST Position an operational check indicates a problem. Of
course, during the maintenance checks, all
1. Turn the Release Lever to the left, rotate accessible bolts, units and screws should be
Crank counterclockwise ¼-turn, and then routinely checked to insure that they are tight.
release the Release Lever. It will remain in
the released position. Continue rotating the It is recommended that the circuit breaker be
crank counterclockwise until the Racking inspected after the first 1000 operations and on a
Mechanism automatically stops at the yearly basis unless environmental considerations
DISCONNECT position. and operating experience indicate that more or
less frequent inspections are appropriate. These
Removal From DISCONNECT Position operations can be no-load mechanical, load
current switching, bulk capacitor, reactor switching
operations, or motor starting applications.
1. Push the Rack Release Lever clockwise, and
turn Crank counterclockwise ¼-turn, and then
Vacuum interrupters, as used on the VHK vacuum
release the Rack Release Lever. It will remain
circuit breakers, have an inherently long contact
in the released position. Continue cranking
life and will provide trouble-free service under
counterclockwise until a resistance is felt
varied application conditions as long as the circuit
(approximately 2-3 turns) (Do Not Force) The
breaker is applied within its rating. The
breaker is now in the WITHDRAW position.
interrupters have been tested up to 2000% KSI
minimum. It is unlikely that a circuit breaker will
If the Closing Springs were previously
be subjected to this much duty in its life, and it is
charged, they will automatically discharge as
not expected that the interrupters will have to be
the Racking Mechanism reaches the
replaced due to excessive contact erosion.
WITHDRAW position.
The wear condition of the individual vacuum
2. The circuit breaker can now be removed from
interrupters will vary, however, depending on
the compartment by pulling on the handle
circuit conditions and such variables as single
located on the Front Barrier.
phase versus three-phase interruption, X/R ratio
1
0 IB 6.2.7.7-1I
(asymmetry) and relay delay times. Therefore, the clean, lint-free cloth is normally sufficient. If there
interrupters in all three phases may not erode is heavy grease, alcohol should be used.
equally. Additionally, interrupting high short-circuit
current will cause contact erosion to occur faster DC Millivolt Drop Test / Micro-ohm Test
than load current interruptions.
During maintenance periods, the condition of the
There is, however, a check for Contact Wipe breaker current circuit can easily be determined by
(Contact Spring over-travel), which is a measure performing a Millivolt drop test or a micro-ohm
of contact erosion. This check is covered under test. This test should be performed regardless of
the subsection "Contact Wear and Contact whether the circuit breaker had interrupted low or
Pressure (Contact Wipe) ". When contact wipe is high currents, or has minimum operations.
less then the minimum specified and there is not
any mechanical problem, the interrupter should be NOTE: The values for resistance, given in Table
replaced due to contact erosion. A3, are for new breakers. It is normal and
acceptable for a used breaker to have resistance
If, after the first inspection period, there is no values as much as 100% greater than these
indication of any problems, actual operating values.
experience with specific circuits will indicate the
future amount of maintenance needed for the Refer to Table A3 in the Appendix for the Millivolt
various circuit breakers, and the procedure can be drop and resistance values for the circuit breakers
modified as required. covered, from lead to lead. If the Primary
Disconnects (a.k.a., Tulips) are to be included in
Where unusual service conditions exist, as the test path, a 2.000” ± 0.005" diameter smooth
covered by ANSI Standard C37.04, it must be (62rms) copper conductor (2.750” ± 0.005” for
presumed that these conditions were considered 3000A breakers) must be inserted into the open
at the time of order, the equipment supplied was end of each Primary Disconnect to achieve the
designed for special application, and an proper contact pressure.
appropriate supplemental maintenance program
has been developed. These maintenance
instructions only cover circuit breakers used under Contact Wear and Contact Pressure
the standard service conditions. (Contact Wipe)
At the selected maintenance period, the following The amount of contact wear, and subsequently
maintenance, tests and adjustments (if necessary) contact pressure (force), can be determined by
should be made: measuring what is referred to as contact wipe (or
over-travel). This can be accomplished by closing
Insulation Cleaning the breaker and carefully measuring the gap
between the Nut and the Trunion Block of the
Contact Spring Assembly. See Figures A6 and A7
WARNING located in the Appendix for the different breakers.
If the circuit breaker has been energized, or it is See Figure A4 for the Wipe Measurement Port
unsure if the circuit breaker has ever been
location.
energized, the mid-band ring (on vacuum
interrupters so equipped) must first be discharged
before any work is performed on or near the WARNING
interrupters. A grounding stick must be used to Keep hands clear of all moving parts. Serious
discharge the ring by fastening the ground cable of injuries can result if a person comes in contact with
the stick to a known ground, and touching the breaker parts when the breaker is being opened or
grounding tip of the stick to each mid-band ring. closed, or closing springs are being charged or
discharged. Use extension tools for manipulating
Any dirt, dust or grease should be removed from breaker parts.
the surfaces of the entire current carrying structure
and vacuum interrupter. Wiping the surface with a This adjustment is initially set at the factory to a
range of 0.145" - 0.219" (3.7 - 5.6mm). As the
1
IB 6.2.7.7-1I 1
breaker sees service and the contacts start to 5. Using a pencil, apply a second mark on the
erode, this value will decrease. Asymmetrical and Pushrod Stem at the interface between the
single phase interruption will cause contact Stem and Stem Guide.
erosion and wipe deterioration to occur differently
for all three poles. Once the Wipe has decreased The distance measured between the two lines is
to 0.031", and it is determined that the breaker is the contact gap. The acceptable limits are listed
operating properly, the interrupter assembly will in Table A3, located in the appendix.
need replacement.
Contact Gap Check- Model 05C
Contact Gap
1. Open the breaker and discharge the closing
Upon opening the breaker, the resulting gap springs.
between the vacuum interrupter contacts is
referred to as Contact Gap. This gap is also the 2. The Racking Mechanism must be in either the
distance the contacts travel upon closing. This DISCONNECT, TEST or CONNECT position.
can range from a minimum of 0.315 " (8mm) on a
new breaker, to a maximum of 0.540" (13.5mm) 3. Apply a piece of masking tape to the inside
on a used breaker with an interrupter nearing surface of the molded interrupter support.
replacement. As the breaker sees service and the See Figure A7 in the Appendix.
contacts start to erode, this value will increase.
4. Lay a pen or pencil flat upon the push rod skirt
The following procedure describes how to and draw a horizontal line on the tape.
determine the Contact Gap. The necessary tools
are a pen or pencil, and one piece of masking 5. Manually charge closing springs and close the
tape at least 1" long. Proceed with the circuit breaker.
breaker withdrawn from the compartment.
6. Lay the pen or pencil flat upon the pushrod
WARNING skirt, and draw a second horizontal line on the
If the circuit breaker has been energized, or it is tape.
unsure if the circuit breaker has ever been
energized, the mid-band ring (on vacuum 7. The distance measured between the two lines
interrupters so equipped) must first be discharged is the contact gap. The acceptable limits are
before any work is performed on or near the listed in Table A3, located in the Appendix.
interrupters. A grounding stick must be used to
discharge the ring by fastening the ground cable of
the stick to known ground, and touching the
grounding tip of the stick to each mid-band ring.
Contact Sequencing (Synchronization) vertically to align the holes and the stud. Replace
the pin and retainer and remove the temporary
Before checking contact sequence, verify that the spacer. During the readjustment procedure, note
contact wipe and gap for each pole is correct. that the contact wipe and contact gap dimensions
Refer to the subsections "Contact Wear and must be maintained. The contact gap and contact
Contact Pressure (Contact Wipe)" and "Contact wipe are inversely related; increasing one
Gap". It is not expected that the contact sequence decreases the other, and vise-versa. Also, note
should exceed the 4 millisecond limit, therefore, that no more than one half (½)-turn should be
before attempting to readjust, verify that the test required when readjusting for contact sequence.
equipment and procedure are correct. Also
consider, especially when testing with electronic After completing the contact sequence procedure,
equipment, that multiple 2 millisecond vacuum recheck the contact wipe and gap for each pole. If
interrupter contact bounces are permissible during the specified contact gap, contact wipe and
normal closing, and these bounces can influence contact sequencing cannot all be obtained, and it
the contact time measurements. If there are any is determined that the breaker is operating
questions, consult the factory. properly, the interrupter is in need of replacement.
If it is determined that the contact sequence is not The front cover and interphase barrier assembly
within 4 milliseconds, adjustment is required. can now be reinstalled. Return the racking screw
Usually, readjustment of one pole should be to its original position by turning it
sufficient so that all three poles touch within 4 counterclockwise approximately two to three turns
milliseconds. The gap of the pole to be changed until it stops.
should be decreased if the contacts of that pole
are touching after the other two poles, or Closing and Opening Times
increased if the contacts are touching before the
other two poles. The gap is decreased by turning After the operation intervals, it is recommended
the Pushrod clockwise, and increased by turning that the closing and opening times be checked.
the Pushrod counterclockwise, as viewed from the This can be done by use of a cycle counter, travel
top of the breaker. recorder or oscillograph to monitor the time from
coil energizing to contact kiss (closing) or part
WARNING (opening).
Keep hands clear of all moving parts. Serious
injuries can result if a person comes in contact with Note: Normally, the closing time is not critical.
breaker parts when the breaker is being opened or The breaker performance is satisfactory if the
closed, or closing springs are being charged or Closing Speed and Opening Speed and Time are
discharged. Use extension tools for manipulating in spec. See Table A3 in the Appendix for the
breaker parts. nominal values for these parameters.
Before the Pushrod can be turned, the breaker The circuit breaker closing and opening times
must be in the Open position, Closing Springs should be within the time ranges for normal
discharged and the Pushrod Pin removed. See operation.
Figure A6 in the Appendix. With the breaker
Open, the vacuum in the interrupter maintains a Note the following:
constant upward force of approximately 25 pounds
on the moving contact and Pushrod. Therefore, • Times are from signal initiation to primary
before removing pin, the contact must be held contact kiss (make) or break.
down in the open position by temporary spacers.
After removing the Retaining Ring and Pushrod • Times for DC controls supplied by a rectified
Pin, rotate Pushrod as required. unconditioned power source, and all AC
controls, may wander by as much as ±4ms
One quarter (¼)-turn of the Pushrod will change due to the "current-zeroes" associated with
the gap by approximately 0.019" (0.5mm). After such currents.
rotating the pushrod, carefully reposition it
1
IB 6.2.7.7-1I 3
• Below 0°C, the closing times will increase Adjustments should be made with the Trip Latch
(but with no reduction in closing force), and (4) against Reset Stop Pin (3). Turn in Adjusting
opening times will usually be within the Screw clockwise (1) until contacts of switch
limits. "break" (as indicated by an audible click or check
with bell ringer). Turn adjusting screw
• Adjustments to correct times, if found to be counterclockwise until Switch (2) contacts "make,"
outside limits, are critical and the nearest then rotate adjusting screw counterclockwise one
District Office should be contacted for turn more. (Adjusting screw is self-locking.)
recommendations.
WARNING
Closing and Opening Speeds Keep hands clear of all moving parts. Serious
injuries can result if a person comes in contact with
The closing and opening speeds of the Primary breaker parts when the breaker is being opened or
Contacts can be determined by use of a travel closed, or closing springs are being charged or
recorder which records their linear travel versus discharged. Use extension tools for manipulating
breaker parts.
time. The output can be fed into a travel recorder
or oscilloscope.
5. When the circuit breaker closes, all auxiliary 12. The stopping device switch, if applicable,
switch "b" contacts open and all auxiliary prevents electrical reclosing of the Circuit
switch "a" contacts close. Breaker after a manual trip until the stopping
device switch has been manually reset.
6. When the limit switch contact "LSb" closes,
the lockout relay coil (Y) is de-energized and
opens lockout relay contact "Ya", which de-
energizes the latch release coil (X). Lockout
coil (Y) is locked out as long as the Close
signal is maintained. This is because the
1
IB 6.2.7.7-1I 7
These devices are supplied when ordered with Only those renewal parts that will be required to
certain component variations such as Test Ports insure proper and timely maintenance for normal
and Interlocks. The three basic types are: operation of the VHK vacuum circuit breakers are
recommended to be stocked. Copies of the
• Simple, three- or six- terminal. applicable Renewal Parts Bulletin for specific
circuit breakers will be furnished on request from
• Simple, three- or six- terminal, electrically the Component Sales Department (407-323-
(remote) operated. 8220).
• Complex, six-terminal, electrically (remote)
operated, with manual selector switch. The minimum quantity of assemblies and items
recommended in these bulletins are predicted on
These devices are basically maintenance free for infrequent replacement of parts based on
their normal operating life. Racking procedures accumulated tests and operating experience.
are similar to the standard breaker as outlined Total assemblies are recommended for
(except that they only have a WITHDRAW and convenient replacement, when it is necessary to
CONNECT position), and all detailed operational return the breaker to service as quickly as
instructions are attached to the devices. possible. The bulletins contain specific part
ordering instructions.
1
8 IB 6.2.7.7-1I A P P E N D I X
4
2
3
5
MOTOR
DISCONNECT
SWITCH
MANUAL TRIP BUTTON
MANUAL CHARGE OPERATIONS
LEVER COUNTER
TRIP LEVER
BLOCKING
INDEX LEVER
LEVER
EXTENSION
RACK SCREW
ADJUSTABLE
LINK
TYPICAL GAP
0.030” - 0.090"
PADLOCK HASP
RACKING MECHANISM
FIGURE A3
2
A P P E N D I X IB 6.2.7.7-1I 1
BLOCKING
ARM LOCATED
BEHIND PLATE
SHIMMED
RACKING ARM ADJUSTING
SCREW RACKING LOCK RACKING ARM
BRACKET
JACKSHAFT
MANUAL CLOSE
LEVER
WIPE MEASUREMENT
PORT
CLOSING
SPRINGS
INTERLOCK SYSTEM
FIGURE A4
2
2 IB 6.2.7.7-1I A P P E N D I X
METAL TO
IINSULATION
INTERFACE
SEAL
MID -BAND
RING
WIPE (CONTACT)
SPRINGS
PRIMARY DISCONNECTS
(A.K.A. TULIPS)
SCRIBE MARK
HERE FOR GAP
MEASUREMENT
OPENING
SPRINGS
MID-BAND RING
METAL
TO INSULATION
INTERFACE
SEAL
1 - ADJUSTING SCREW
2 - SWITCH
3 – RESET STOP PIN
4 - TRIP LATCH
AUXILARY SECONDARY
SWITCH DISCONNECTS
CONTROL DEVICE
CONTROL RELAY
FIGURE A9
2
A P P E N D I X IB 6.2.7.7-1I 7
CLOSING SPEED 1.9 - 5.0 1.9 - 5.0 1.9 - 5.0 1.9 - 5.0 1.9 - 5.0
(FT/SEC)
OPENING SPEED 3.9 - 7.0 3.9 - 7.0 3.9 - 7.0 3.9 - 7.0 3.9 - 7.0
(FT/SEC)
GAP (INCHES) 0.310 MIN 0.310 MIN 0.310 MIN 0.310 MIN 0.375 MIN
♣WIPE (INCHES) 0.145 - 0.219 0.145 - 0.219 0.145 - 0.219 0.145 - 0.219 0.145 – 0.219
(NEW BREAKER)
♥MAXIMUM 8 MAX (1200) 8 MAX (1200) 8 MAX (1200) 6.5 MAX (1200) 5.0 MAX (3000)
7 MAX (2000) 7 MAX (2000) 7 MAX (2000) 5.5 MAX (2000)
MILLIVOLT DROP 5.0 MAX (3000)
♥MAXIMUM MICRO- 40 MAX (1200) 40 MAX (1200) 40 MAX (1200) 32.5 MAX (1200) 25 MAX (3000)
35 MAX (2000) 35 MAX (2000) 35 MAX (2000) 27.5 MAX (2000)
OHMS 25 MAX (3000)
♥ WITH 200 AMPS DC FLOWING FOR NEW BREAKERS. CIRCUIT BREAKER RESISTANCE
IS ALLOWED TO INCREASE BY 100% FOR USED BREAKERS.
.