Professional Documents
Culture Documents
(Ez,--r
ENERGY REGTJLATOR OF SO1JTH
(Er
AFRICA
herein after referred to as "the Registrant", only for the purpose of operating gas
transmission activities for own use in the Babelegi area of Gity of Tshwane
Metropolitan Municipality in the Gauteng province.
The registration under this certificate is subject to the requirements of the Gas
Act as stipulated in the Addendum hereto. The Registrant must comply with
these requirements.
NOMALANGA SITHOLE
SEAL
ACTING CHIEF EXECUTIVE OFFICER
rr (EzF
NATIONAL ENERGY REGULATOR
GT
OF SOUTH AFRICA
TABLE OF CONTENTS
DEFINITIONS 3
CHAPTER ONE: REGISTERED ACTIVITY .......... 4
CHAPTER TWO: GENERAL CONDITIONS 7
Page 'l of 14
Annexure A: Map of the proposed piPeline
Annexure B: Block diagram
Annexure C: Mechanical flow diagram PRS
Annexure D: Standards
Page 2 of 14
DEFINITIONS
"the Gas Act" means the Gas Act, 2001 (Act No. 48 of 2001).
"Rules" means Rules made by the NERSA in terms of section 34(3) of the Gas
Page 3 of 14
REGISTERED ACTIVITY
,,1. RegisteredOperation
1.1 NERSA has registered Ceramic lndustries (Pty) Ltd's operation of gas
transmission facility for own use in the Babelegi area of City of Tshwane
Metropolitan Municipality in the Gauteng province as indicated in
Annexure A.
1.2 The registered gas transmission facility for own use is located along the
following coordinates:
Page 4 of 14
P1 I 72 775.3575 2 804 460.3476 "25'20',41.74340" S "28"16',37.47584" E
P1 11 72 859.6165 2 804 404.772 "25"20',39.92267" S "28'16',34.47337" E
Tie-in factory 1
Tie-in factory 2
P1 13 72 775.7208 2 804 464.738 "25"20',41.99599" S "28'16',37.46178" E
1.4 This registration only applies to gas conforming to the gas combustion
specifications as set out in table 2 below.
1.5 The entire list of the standards that Ceramic lndustries plans to abide by
when constructing the transmission facility is attached in the registration
conditions as Annexure D.
1.8 ln addition to the above, the registrant must comply with all the
conditions that are specified in the construction licence of a gas
transmission facility (Gala.t. F11169812019). Furthermore, the
registrant must carry out the gas transmission activities in a manner
consistent with the objectives and provisions of the Act and must comply
with all the safety and maintenance codes and standards used for
operating a gas transmission facility.
2.1 The certificate is valid for an indefinite period from the date of issue, until
such time that the operations are terminated or discontinued for
whatever reasons.
Page 6 of 14
GENERAL REQUIREMENTS
3.2 The Registrant must notify NERSA in writing if during a calendar year
there is a substantial change in the information to be provided under
regulation 9 of the Piped-Gas Regulations.
3.3 ln terms of section 28(2) of the Gas Act, the Registrant must provide
NERSA with such information concerning the activities of the operation
as may be prescribed.
4. Gompliance
4.1 This certificate is granted only in terms of section 28 of the Gas Act and
for the activities specified and described in paragraph 1.1 above. This
certificate does not exempt the Registrant from compliance with any
other legislation.
5.1 The Registrant must at all times provide NERSA with the details of any
changes in the registered name, operating or trading name, registered
address and other contact details, including but not limited to, the names,
telephone numbers, facsimile numbers and email addresses of contact
persons.
Page 7 of 14
5.2 The notifications contemplated in paragraph 5.1 above must be provided
within fourteen (14) days of the event giving rise to them.
6.2 The Registrant must in all correspondence with NERSA quote the
registration reference number as it appears on this certificate.
Page I of 14
ANNEXURE A: Map of the proposed pipeline
o)
o)
o)
(tr
(L
Annexure B: Block diagram
\f
o
o
o
c,)
o
o_
Annexure C: Mechanical diagram PRS
o
o,
(5
o_
Annexure D: Standards
List all application:
a. Legislation
i. OHS- act and regulations - construction regulation, Pressure Equipment
Regulations (and Ceramic lndustries /SANS Standards) Major Hazardous,
nstallation Regulation.
I
Page 12ot 14
General Sasol Gas'Codes and Standards used in qas pipelines
41: Codes
1. ASME B31.8: 2010 - Gas transmission and distribution systems;
2. 831.8S -2012 - Managing System lntegrity of Gas Pipelines;
3. NACE RP 0169 - Control External Corrosion of underground;
4. API RP 2201 - Safe Hot Tapping Practices in the Petroleum and
Petrochemical I ndustries;
5. ASME Vlll Div 1: Required applicable to the design, fabrication,
inspection, testing, and certification of pressure vessels;
6. ASME/ANSI B3{.1 - Requirements for materials and components,
design, fabrication, assembly, erection, examinations, inspection and
testing of piping;
7. API RP 520 - Sizing and selection of pressure relief devices;
8. NFPA 59A - Codes, standards, research, training and education on fire
hazards;
Page 14 of 14