Rab Pekerjaan Fasade
Rab Pekerjaan Fasade
Analisa Persiapan
Ars - 01 1 M2 Pembersihan Lahan
(PERMEN PU 11/PRT/M/2013)
Tenaga
0.1000 Hr Pekerja @ Rp 60,000.00 =
0.0500 Hr Mandor @ Rp 65,000.00 =
(Over head + profit ) 10% @ Rp 925.00 =
Jumlah pekerjaan =
1 M2 Pembongkaran
Analisa Dinding
Ars - 04 1 M2 Memasang dinding bata merah cm tebal ½ bata, campuran spesi 1 PC : 3 PP
(PERMEN PU 11/PRT/M/2013)
Bahan
70.0000 Buah Bata merah @ Rp 550.00 =
14.3700 kg PC @ Rp 1,410.00 =
0.0400 m3 PP @ Rp 92,308.00 =
Tenaga kerja
0.3000 OH Pekerja @ Rp 60,000.00 =
0.1000 OH Tukang batu @ Rp 85,000.00 =
0.0100 OH Kepala tukang @ Rp 110,000.00 =
0.0150 OH Mandor @ Rp 65,000.00 =
(Over head + profit ) 10% @ Rp 9,102.90 =
Jumlah total
Ars - 05 Memasang 1 m2 finishing siar pasangan dinding bata merah (=20 m’)
(PERMEN PU 11/PRT/M/2013)
Bahan
3.1080 kg Portland Cement @ Rp 1,410.00 =
Tenaga kerja
0.1500 OH Pekerja @ Rp 60,000.00 =
0.0750 OH Tukang batu @ Rp 85,000.00 =
0.0080 OH Kepala tukang @ Rp 110,000.00 =
0.0080 OH Mandor @ Rp 65,000.00 =
(Over head + profit ) 10% @ Rp 2,115.73 =
Jumlah total
Tenaga
0.0200 Oh Pekerja @ Rp 60,000.00 =
0.0630 Oh Tukang cat @ Rp 85,000.00 =
0.0063 Oh Kepala Tukang @ Rp 110,000.00 =
0.0025 Oh Mandor @ Rp 65,000.00 =
Jumlah II =
(Over head + profit ) 10% @ Rp 3,838.65 =
Jumlah rekap =
Ars -12 1 m2 pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar,
2 lapis cat penutup) eksterior
(PERMEN PU 11/PRT/M/2013)
Bahan
0.1000 Kg Plamir @ Rp 35,000.00 =
0.1000 Kg Cat dasar @ Rp 96,000.00 =
0.2600 Kg Cat penutup 2 x @ Rp 85,800.00 =
0.0100 bh Rool Cat Tembok @ Rp 30,000.00 =
Jumlah I =
Tenaga
0.0200 Oh Pekerja @ Rp 60,000.00 =
0.0630 Oh Tukang cat @ Rp 85,000.00 =
0.0063 Oh Kepala Tukang @ Rp 110,000.00 =
0.0025 Oh Mandor @ Rp 65,000.00 =
Jumlah II =
(Over head + profit ) 10% @ Rp 4,311.85 =
Jumlah rekap =
Ars - 13 1 m2 pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
(PERMEN PU 11/PRT/M/2013)
Bahan
0.1200 Kg Cat dasar @ Rp 96,000.00 =
0.1800 Kg Cat penutup 2 x @ Rp 67,600.00 =
Tenaga
0.0280 Oh Pekerja @ Rp 60,000.00 =
0.0420 Oh Tukang cat @ Rp 85,000.00 =
0.0042 Oh Kepala Tukang @ Rp 110,000.00 =
0.0025 Oh Mandor @ Rp 65,000.00 =
(Over head + profit ) 10% @ Rp 2,956.25 =
Jumlah rekap
1 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu kelas II atau III
(SNI-3434-2008)
Bahan
1.2000 m3 Balok Kayu @ =
1.2500 Kg Paku 10cm @ =
1.0000 Kg Lem Kayu @ =
Tenaga
6.0000 OH Pekerja @ =
18.0000 OH Tukang Kayu @ =
1.8000 OH Kepala Tukang @ =
0.3000 OH Mandor @ =
(Over head + profit ) 10% @ Rp - =
Jumlah rekap
1 m2 Membuat dan memasang pintu klamp sederhana, kayu kelas III untuk gudang sederhana
(SNI-3434-2008)
Bahan
0.0400 m3 Papan kayu @ =
0.0500 Kg Paku 5cm - 7cm @ =
Tenaga
0.3500 OH Pekerja @ =
1.0500 OH Tukang Kayu @ =
0.1050 OH Kepala Tukang @ =
0.0180 OH Mandor @ =
(Over head + profit ) 10% @ Rp - =
Jumlah rekap
1 m2 Membuat dan memasang daun pintu dan jendela kaca, kayu kelas I atau II
(SNI-3434-2008)
Bahan
0.0240 m3 Papan kayu @ =
0.3000 Kg Lem Kayu @ =
Tenaga
0.8000 OH Pekerja @ =
2.4000 OH Tukang Kayu @ =
0.2400 OH Kepala Tukang @ =
0.0400 OH Mandor @ =
(Over head + profit ) 10% @ Rp - =
Jumlah rekap
1 m2 Membuat dan memasang pintu dan jendela jalusi kayu kelas I dan II
(SNI-3434-2008)
Bahan
0.0640 m3 Papan kayu @ =
0.5000 Kg Lem Kayu @ =
Tenaga
1.0000 OH Pekerja @ =
3.0000 OH Tukang Kayu @ =
0.3000 OH Kepala Tukang @ =
0.0500 OH Mandor @ =
(Over head + profit ) 10% @ Rp - =
Jumlah rekap
1 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (Lebar s
(SNI-3434-2008)
Bahan
0.0250 m3 Papan kayu @ =
0.0300 Kg Paku 1 cm - 2,5 cm @
0.5000 Kg Lem Kayu @ =
Plywood tebal 4mm uk (90x220)
1.0000 Lbr cm
Tenaga
0.7000 OH Pekerja @ =
2.1000 OH Tukang Kayu @ =
0.2100 OH Kepala Tukang @ =
0.0350 OH Mandor @ =
(Over head + profit ) 10% @ Rp - =
Jumlah rekap
Ars - 26 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
(PERMEN PU 11/PRT/M/2013)
Bahan
4.0000 m' Besi Hollow 0.8X40X40 mm @ Rp 13,300.00 =
1.0000 LS assesoris (perkuatan, las, dll) @ Rp 13,300.00 =
(100% Rangka Metal)
Tenaga
0.2500 Org/Hr Pekerja @ Rp 60,000.00 =
0.2500 Org/Hr Tukang besi @ Rp 85,000.00 =
0.0250 Org/Hr Kepala tukang Besi @ Rp 110,000.00 =
0.0130 Org/Hr Mandor @ Rp 65,000.00 =
(Over head + profit ) 10% @ Rp 10,634.50 =
jumlah total =
Tenaga
0.0150 Oh Pekerja @ Rp 60,000.00 =
0.1500 Oh Tukang kayu @ Rp 85,000.00 =
0.0150 Oh Kepala Tukang @ Rp 110,000.00 =
0.0008 Oh Mandor @ Rp 65,000.00 =
(Over head + profit ) 10% @ Rp 121,534.88 =
Jumlah =
Ars - 28 1 buah pasang engsel pintu biasa
(PERMEN PU 11/PRT/M/2013)
Bahan
1.0000 Bh Engsel pintu @ Rp 142,800.00 =
Tenaga
0.0150 Oh Pekerja @ Rp 60,000.00 =
0.1500 Oh Tukang kayu @ Rp 85,000.00 =
0.0150 Oh Kepala Tukang @ Rp 110,000.00 =
0.0008 Oh Mandor @ Rp 65,000.00 =
(Over head + profit ) 10% @ Rp 15,814.88 =
Jumlah =
Ars - 29 1 buah pasang kunci stenless
(PERMEN PU 11/PRT/M/2013)
Bahan
1.0000 Bh Kunci stenless @ Rp 173,000.00 =
Tenaga
0.0100 Oh Pekerja @ Rp 60,000.00 =
0.5000 Oh Tukang kayu @ Rp 85,000.00 =
0.0500 Oh Kepala Tukang @ Rp 110,000.00 =
0.0050 Oh Mandor @ Rp 65,000.00 =
(Over head + profit ) 10% @ Rp 22,192.50 =
Jumlah =
Ars - 30 1 buah pasang Handle Pintu Utama
(PERMEN PU 11/PRT/M/2013)
Bahan
1.0000 Bh Handle pintu biasa @ Rp 211,200.00 =
Tenaga
0.0500 Oh Pekerja @ Rp 60,000.00 =
0.5000 Oh Tukang kayu @ Rp 85,000.00 =
0.0500 Oh Kepala Tukang @ Rp 110,000.00 =
0.0025 Oh Mandor @ Rp 65,000.00 =
(Over head + profit ) 10% @ Rp 26,236.25 =
Jumlah =
Ars - 31 1 buah pasang Handle Pintu Utama
(PERMEN PU 11/PRT/M/2013)
Bahan
1.0000 Bh Handle pintu P1 @ Rp 3,990.50 =
Tenaga
0.0500 Oh Pekerja @ Rp 60,000.00 =
0.5000 Oh Tukang kayu @ Rp 85,000.00 =
0.0500 Oh Kepala Tukang @ Rp 110,000.00 =
0.0025 Oh Mandor @ Rp 65,000.00 =
(Over head + profit ) 10% @ Rp 5,515.30 =
Jumlah =
Tenaga
0.1000 Oh Pekerja @ Rp 60,000.00 =
0.2000 Oh Tukang kayu @ Rp 85,000.00 =
0.0200 Oh Kepala Tukang @ Rp 110,000.00 =
0.0005 Oh Mandor @ Rp 65,000.00 =
(Over head + profit ) 10% @ Rp 14,323.25 =
Jumlah =
Ars - 34 1 Unit pasang door Closer
(PERMEN PU 11/PRT/M/2013)
Bahan
1.0000 set door closer ex. ROWELL @ Rp 187,200.00 =
Tenaga
0.0500 Oh Pekerja @ Rp 60,000.00 =
0.5000 Oh Tukang kayu @ Rp 85,000.00 =
0.0500 Oh Kepala Tukang @ Rp 110,000.00 =
0.0030 Oh Mandor @ Rp 65,000.00 =
(Over head + profit ) 10% @ Rp 23,839.50 =
Jumlah =
Tenaga kerja
0.0430 OH Pekerja @ Rp 60,000.00 =
0.0430 OH Tukang besi @ Rp 85,000.00 =
0.0043 OH Kepala tukang @ Rp 110,000.00 =
0.0021 OH Mandor @ Rp 65,000.00 =
(Over head + profit ) 10% @ Rp 12,022.45 =
Jumlah =
Ars - 43 1 M2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (leb
(PERMEN PU 11/PRT/M/2013)
Bahan
0.0250 m3 Papan kayu @ Rp 2,850,000.00 =
0.0300 kg Paku 1 cm – 2,5 cm @ Rp 20,000.00 =
0.5000 kg Lem kayu @ Rp 21,000.00 =
Plywood tebal 4 mm Ukuran (90 x
@ =
1.0000Lembar 220) cm Rp 92,000.00
Tenaga kerja
0.7000 OH Pekerja @ Rp 60,000.00 =
2.1000 OH Tukang kayu @ Rp 85,000.00 =
0.2100 OH Kepala tukang @ Rp 110,000.00 =
0.0350 OH Mandor @ Rp 65,000.00 =
(Over head + profit ) 10% @ Rp 42,022.50 =
Jumlah =
ANALISA PINTU & JENDELA
Rp 6,000.00
Rp 3,250.00
Rp 925.00
Rp 10,175.00
Analisa Dinding
Rp 38,500.00
Rp 20,261.70
Rp 3,692.32
Rp 18,000.00
Rp 8,500.00
Rp 1,100.00
Rp 975.00
Rp 9,102.90
Rp 100,131.92
Rp 4,382.28
Rp 9,000.00
Rp 6,375.00
Rp 880.00
Rp 520.00
Rp 2,115.73
Rp 23,273.01
Rp 4,582.50
Rp 12,000.00
Rp 8,500.00
Rp 1,100.00
Rp 650.00
Rp 2,683.25
Rp 29,515.75
Rp 10,964.16
Rp 2,123.08
Rp 18,000.00
Rp 12,750.00
Rp 1,650.00
Rp 975.00
Rp 4,646.22
Rp 51,108.47
Rp 3,500.00
Rp 9,600.00
Rp 17,576.00
Rp 300.00
Rp 30,976.00
Rp 1,200.00
Rp 5,355.00
Rp 693.00
Rp 162.50
Rp 7,410.50
Rp 3,838.65
Rp 42,225.15
Rp 3,500.00
Rp 9,600.00
Rp 22,308.00
Rp 300.00
Rp 35,708.00
Rp 1,200.00
Rp 5,355.00
Rp 693.00
Rp 162.50
Rp 7,410.50
Rp 4,311.85
Rp 47,430.35
Rp 11,520.00
Rp 12,168.00
Rp 1,680.00
Rp 3,570.00
Rp 462.00
Rp 162.50
Rp 2,956.25
Rp 32,518.75
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
konvensional, kayu kelas I, II dan III bentang 6 meter
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 50,000.00
Rp 12,500.00
Rp 62,500.00
Rp 21,000.00
Rp 29,750.00
Rp 3,850.00
Rp 1,170.00
Rp 55,770.00
Rp 11,827.00
Rp 130,097.00
Rp 23,437.50
Rp 600.00
Rp 24,037.50
Rp 6,000.00
Rp 8,500.00
Rp 1,100.00
Rp 325.00
Rp 15,925.00
Rp 3,996.25
Rp 43,958.75
Rp 26,062.50
Rp 1,350.00
Rp 27,412.50
Rp 6,000.00
Rp 8,500.00
Rp 1,100.00
Rp 325.00
Rp 15,925.00
Rp 4,333.75
Rp 47,671.25
Rp 275,000.00
Rp 177,500.00
Rp 13,933.33
Rp 25,000.00
Rp 40,000.00
Rp 50,000.00
Rp 75,000.00
Rp 9,000.00
Rp 25,500.00
Rp 5,500.00
Rp 650.00
Rp 69,708.33
Rp 766,791.67
Rp 180,000.00
Rp 8,283.75
Rp 7,200.00
Rp 2,630.78
Rp 36,000.00
Rp 2,125.00
Rp 55,000.00
Rp 3,250.00
Rp 29,448.95
Rp 323,938.48
Rp 53,200.00
Rp 13,300.00
Rp 15,000.00
Rp 21,250.00
Rp 2,750.00
Rp 845.00
Rp 10,634.50
Rp 116,979.50
Rp 1,200,000.00
Rp 900.00
Rp 12,750.00
Rp 1,650.00
Rp 48.75
Rp 121,534.88
Rp 1,336,883.63
Rp 142,800.00
Rp 900.00
Rp 12,750.00
Rp 1,650.00
Rp 48.75
Rp 15,814.88
Rp 173,963.63
Rp 173,000.00
Rp 600.00
Rp 42,500.00
Rp 5,500.00
Rp 325.00
Rp 22,192.50
Rp 244,117.50
Rp 211,200.00
Rp 3,000.00
Rp 42,500.00
Rp 5,500.00
Rp 162.50
Rp 26,236.25
Rp 288,598.75
Rp 3,990.50
Rp 3,000.00
Rp 42,500.00
Rp 5,500.00
Rp 162.50
Rp 5,515.30
Rp 60,668.30
Rp 13,500.00
Rp 900.00
Rp 12,750.00
Rp 1,650.00
Rp 48.75
Rp 2,884.88
Rp 31,733.63
Rp 118,000.00
Rp 6,000.00
Rp 17,000.00
Rp 2,200.00
Rp 32.50
Rp 14,323.25
Rp 157,555.75
Rp 187,200.00
Rp 3,000.00
Rp 42,500.00
Rp 5,500.00
Rp 195.00
Rp 23,839.50
Rp 262,234.50
Rp 302,500.00
Rp 8.40
Rp 900.00
Rp 12,750.00
Rp 1,650.00
Rp 48.75
Rp 31,785.72
Rp 349,642.87
Rp 1,375,000.00
Rp 8.40
Rp 343,750.00
Rp 900.00
Rp 12,750.00
Rp 1,650.00
Rp 48.75
Rp 173,410.72
Rp 1,907,517.87
Err:509
Rp 8.40
Err:509
Rp 900.00
Rp 12,750.00
Rp 1,650.00
Rp 48.75
Err:509
Err:509
Rp 1,705,000.00
Rp 8.40
Rp 426,250.00
Rp 900.00
Rp 12,750.00
Rp 1,650.00
Rp 48.75
Rp 214,660.72
Rp 2,361,267.87
Rp 427,570.00
Rp 8.40
Rp 106,892.50
Rp 900.00
Rp 12,750.00
Rp 1,650.00
Rp 48.75
Rp 54,981.97
Rp 604,801.62
Rp 110,000.00
Rp 980.00
Rp 2,400.00
Rp 2,580.00
Rp 3,655.00
Rp 473.00
Rp 136.50
Rp 12,022.45
Rp 132,246.95
Rp 440,000.00
Rp 438,000.00
Rp 5,100.00
Rp 7,225.00
Rp 935.00
Rp 273.00
Rp 89,153.30
Rp 980,686.30
Rp 107,800.00
Rp 157,555.75
Rp 31,733.63
Rp 2,500.00
Rp 72,000.00
Rp 102,000.00
Rp 44,000.00
Rp 19,500.00
Rp 53,708.94
Rp 590,798.31
pis (plywood) rangkap, rangka tertutup kayu kelas II (lebar sampai 90 cm)
Rp 71,250.00
Rp 600.00
Rp 10,500.00
Rp 92,000.00
Rp 42,000.00
Rp 178,500.00
Rp 23,100.00
Rp 2,275.00
Rp 42,022.50
Rp 462,247.50
LISA PINTU & JENDELA
Rp 5,347,534.50
Rp 488,235.00
Rp 121,336.60
Rp 24,368,284.37
Rp 5,319,075.00
Rp 1,516,269.52
Rp 37,160,734.99
Rp 727,358.23
Rp 568,798.05
Rp 678,307.16
Rp 1,043,781.75
Rp 244,117.50
Rp 577,197.50
Rp 524,469.00
Rp 4,364,029.19
Rp 687,684.14
Rp 873,647.78
Rp 521,890.88
Rp 244,117.50
Rp 288,598.75
Rp 262,234.50
Err:509
Err:509
Rp 648,010.06
Rp 582,431.85
Rp 521,890.88
Rp 244,117.50
Rp 288,598.75
Rp 262,234.50
Err:509
Err:509
Rp 386,161.09
Rp 277,348.50
Rp 347,927.25
Rp 244,117.50
Rp 288,598.75
Err:509
Err:509
Rp 674,459.45
Rp 304,012.75
Rp 479,010.73
Rp 521,890.88
Rp 488,235.00
Rp 577,197.50
Rp 262,234.50
Rp 3,307,040.80
Rp 662,557.22
Rp 776,575.80
Rp 521,890.88
Rp 244,117.50
Rp 288,598.75
Rp 262,234.50
Err:509
Err:509
Rp 702,231.30
Rp 1,067,791.73
Rp 1,043,781.75
Rp 488,235.00
Rp 577,197.50
Rp 524,469.00
Err:509
Err:509
Rp 1,859,392.12
Rp 304,012.75
Rp 1,555,910.75
Rp 521,890.88
Rp 244,117.50
Rp 288,598.75
Rp 262,234.50
Rp 5,036,157.24
Rp 3,610,341.74
Rp 304,012.75
Rp 3,283,146.50
Rp 521,890.88
Rp 244,117.50
Rp 288,598.75
Rp 262,234.50
Rp 8,514,342.62
Rp 4,059,981.37
Rp 304,012.75
Rp 3,433,492.93
Rp 521,890.88
Rp 244,117.50
Rp 288,598.75
Rp 262,234.50
Rp 9,114,328.68
Rp 4,327,120.20
Rp 304,012.75
Rp 3,929,985.80
Rp 521,890.88
Rp 244,117.50
Rp 288,598.75
Rp 262,234.50
Rp 9,877,960.38
Rp 4,406,468.37
Rp 392,274.52
Rp 4,262,146.52
Rp 1,043,781.75
Rp 488,235.00
Rp 577,197.50
Rp 524,469.00
Rp 11,694,572.67
Rp 4,406,468.37
Rp 392,274.52
Rp 4,262,146.52
Rp 1,043,781.75
Rp 488,235.00
Rp 577,197.50
Rp 524,469.00
Rp 11,694,572.67
Rp 3,266,499.67
Rp 4,237,671.52
Rp 5,347,534.50
Rp 244,117.50
Rp 577,197.50
Rp 3,418,255.17
Rp 17,091,275.86
Rp 3,131,607.78
Rp 392,274.52
Rp 3,367,760.08
Rp 1,043,781.75
Rp 488,235.00
Rp 577,197.50
Rp 524,469.00
Rp 9,525,325.62
Rp 9,137,010.57
Rp 456,850.53
Rp 9,593,861.10
Rp 19,056,103.47
Rp 952,805.17
Rp 20,008,908.64
Rp 1,031,526.21
Rp 2,250,941.57
Rp 737,857.97
Rp 4,020,325.75
Rp 2,277,292.48
Rp 3,887,452.90
Rp 1,433,379.83
Rp 7,598,125.20
Rp 4,117,112.05
Rp 7,916,697.39
Rp 4,469,483.93
Rp 16,503,293.37
Rp 5,559,767.58
Rp 8,011,225.12
Rp 6,078,256.23
Rp 19,649,248.92
Rp 267,138.84
Rp 62,935.72
Rp 330,074.55
Rp 1,381,980.63
Rp 1,087,389.31
Rp 2,469,369.94
Rp 2,094,791.69
Rp 1,664,300.04
Rp 3,759,091.73
Rp 3,449,000.46
Rp 3,461,464.36
Rp 6,910,464.82
Rp 4,909,006.78
Rp 4,750,018.43
Rp 11,594,046.96
Rp 21,253,072.18
Rp 4,166,770.78
Rp 4,986,337.76
Rp 14,424,518.52
Rp 23,577,627.05
Rp 1,655,440.87
Rp 2,256,849.55
Rp 4,161,035.11
Rp 8,073,325.54
Rp 4,406,468.37
Rp 2,528,616.78
Rp 12,053,696.19
Rp 18,988,781.34
Rp 28,040,512.62
Rp 1,402,025.63
Rp 29,442,538.25
Rp 5,613,883.03
Rp 2,528,616.78
Rp 13,474,979.98
Rp 21,617,479.79
Rp 2,871,081.28
Rp 4,986,337.76
Rp 5,165,005.79
Rp 13,022,424.83
Rp 763,726.14
Rekap Analisa harga satuan Kerja Struktur
Kode Nama Analisa Jumlah harga Acuan Analisa
#REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
DAFTAR HARGA BAHAN BANGUNAN DAN UPAH KERJA
TAHUN ANGGARAN 2015
NO. URAIAN PEKERJAAN VOL SAT. SPESIFIKASI KODE HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
I. PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi 1.00 Ls - - Rp 1,500,000.00 Rp 1,500,000.00
2 Papan Nama Proyek 1.00 Ls - - Rp 350,000.00 Rp 350,000.00
3 Pembersihan Akhir sisa Pekerjaan 1.00 Ls - Rp 1,500,000.00 Rp 1,500,000.00
SUB TOTAL Rp 3,350,000.00
II. PEKERJAAN PEMBONGKARAN
1 Pekerjaan Pembongkaran Overstek Atap Rumah (Lama)
2 Pekerjaan Pembongkaran Lantai Kayu Rumah (Lama)
3 Pekerjaan Pembongkaran Dinding Kayu Rumah (Lama)
SUB TOTAL Rp -
III. PEKERJAAN ATAP
1 Pekerjaan Rangka Atap Kayu Rumah
2 Pekerjaan Pemasangan Atap Rumah
3 Pekerjaan Listplank
SUB TOTAL Rp -
IV. PEKERJAAN LANTAI
1 Pekerjaan Rangka Lantai Kayu
2 Pekerjaan Lantai Kayu
3 Pekerjaan Rabat Beton
SUB TOTAL Rp -
V. PEKERJAAN DINDING
1 Pekerjaan Pasangan bata 1/2 batu
2 Pekerjaan Plesteran
3 Pekerjaan Profil
4 Pekerjaan Pasangan Dinding Rumah Kayu
SUB TOTAL Rp -
REKAPITULASI RENCANA ANGGARAN BIAYA
S
Unit Kerja
T
Pekerjaan A
Lokasi N
Tahun Anggaran D
A
R
NO. URAIAN PEKERJAAN JUMLAH HARGA
P
I. PEKERJAAN PERSIAPAN Rp 3,350,000.00
E
R
II. PEKERJAAN PEMBONGKARAN Rp ###
- M
E
III. PEKERJAAN ATAP Rp - N
V. PEKERJAAN DINDING Rp -
PPN 10 % Rp 335,000.00
DIBULATKAN Rp 3,685,000.00
TIGA MILYAR DELAPAN RATUS SEMBILAN PULUH DELAPAN JUTA EMPAT RATUS SEPULUH RIBU RUPIAH
............................................... .............................................
NIP. ...................................... DIREKTUR
MENGETAHUI, MENYETUJUI,
PENGELOLA TEKNIS KUASA PENGGUNA ANGGARAN
DINAS PEKERJAAN UMUM
KABUPATEN KALIMANTAN UTARA
................................................. ..........................................
NIP. ...................................... NIP. ..............................