CARA BY PASS UPS PILLER 3 PHASA :

1. NAIKKAN MCB SWMB DI UPS PILLER


2. NAIKKAN MCCB BY PASS DI PANEL I/O (DARMAWAN)
3. TURUNKAN MCCB OUTPUT UPS DI PANEL I/O (DARMAWAN)
4. TURUNKAN MCB SWIN DAN SWOUT DI UPS PILLER
5. TURUNKAN MCB SWMB DI UPS PILLER
6. LEPAS FUSE BATERAI DI UPS PILLER
7. TURUNKAN MCCB INPUT UPS DI PANEL I/O (DARMAWAN)

CARA MENORMALKAN :

1. NAIKKAN MCCB INPUT UPS DI PANEL I/O (DARMAWAN)


2. MASUKKAN FUSE BATERAI DI UPS PILLER
3. NAIKKAN MCB SWIN DAN SWOUT DI UPS PILLER
4. TUNGGU SAMPAI UPS MENYALA
5. NAIKKAN MCB SWMB DI UPS PILLER
6. NAIKKAN MCCB OUTPUT UPS DI PANEL I/O (DARMAWAN)
7. TURUNKAN MCCB BY PASS DI PANEL I/O (DARMAWAN)
8. TURUNKAN MCB SWMB DI UPS PILLER

NB : UNTUK PENGGANTIAN BATERAI, SESUDAHNYA WAJIB “BATERAI TEST” DENGAN CARA DARI
LAYAR UTAMA UPS TEKAN NOMOR 3 SELANJUTNYA PILIH NOMOR 2.

KODE CUSTOMIZING : 436215