Professional Documents
Culture Documents
A3 SCHEDULE OF FINISHES
DOOR SCHEDULE LINE AND GRADE
WINDOW SCHEDULE
A4 FRONT ELEVATION
REAR ELEVATION
LEFT SIDE ELEVATION
RIGHT SIDE ELEVATION
A5 SECTION A
SECTION B
ELECTRICAL
E1 GENERAL NOTES AND
LOAD COMPUTATIONS
POWER LAYOUT
E2 LIGHTING LAYOUT
STRUCTURAL
PLUMBING
P1 COLD WATER LINE
LAYOUT
COLD WATER LINE
ISOMETRIC LAYOUT
ROOF DRAINAGE
LAYOUT
P2 SANITARY LAYOUT
PLUMBING
A-1
Project Leader, UP College of Architecture BUILD BACK BETTER LOCATION MAP
DATE
PROTOTYPE MODEL KAPIT BAHAY 1.1 VICINITY MAP
PRC No. 0004882 Validity 10/29/2020 PRC No. Validity CHECKED BY:
BRGY. RESERVA, BALER, AURORA
PTR No. 2624171 Date 01/17/2017 PTR No. Date
UP-DOST PCIEERD University of the Philippines, College of Architecture
BUILD BACK BETTER PROGRAM Diliman, Quezon City Place Pasig City TIN 110-826-417 Place TIN DATE SHEET 1 OF 7