To Eagle Tech Facility Management & Maintenance LLC
Project : Midtown Shop Work Dear Sir, We are please to provide Work completion report S.No Work Description Work Status Remove the Leftover Contruction support at the roof in 1 Completed between the wall and the beam. 60*60 Fresh air opening at the front side and 60*60 exhaust 2 Completed duct opening in the back side. 3 AC Drain to be under 80CM from the existing line. Completed Existing Wp provision Should be 4" and straight to Basement, 4 Installation Pipe is Pending it will complete along with Completed drainage work. 5 Water supply tap inside the unit to be shifter out. Completed Drainage Provision to connect the soil waste connected to the 6 Waiting for Approval sewage man hole in Afnan 1 shop-3
AMJAD JAKATI FANMED TECHNICAL SERVICES Before Work After Completion of Work