50% Work Completion Report

Date 10-Aug-22

To Eagle Tech Facility Management & Maintenance LLC


Project : Midtown Shop Work
Dear Sir,
We are please to provide Work completion report
S.No Work Description Work Status
Remove the Leftover Contruction support at the roof in
1 Completed
between the wall and the beam.
60*60 Fresh air opening at the front side and 60*60 exhaust
2 Completed
duct opening in the back side.
3 AC Drain to be under 80CM from the existing line. Completed
Existing Wp provision Should be 4" and straight to Basement,
4 Installation Pipe is Pending it will complete along with Completed
drainage work.
5 Water supply tap inside the unit to be shifter out. Completed
Drainage Provision to connect the soil waste connected to the
6 Waiting for Approval
sewage man hole in Afnan 1 shop-3

AMJAD JAKATI
FANMED TECHNICAL SERVICES