You are on page 1of 1

QUOTATION

TO
Eagle Tech Facilities Management Date 05-Aug-22
UAE Q.no: FMTS-005/22
ATTN: Abdul Rahman
Dear Sir,
We are please to submit our best compitetive offer for the following item.

Sr.No Description
Unt price

Removing all swimming pool tiles and Compaction swimming


pool area.
Layering for the swimming pool area.
Compacting the layers and area settlements.
Slopping floor to swimming pool overflow grating.
Waterproofing works for floor box.
1 Supply and fix Plastic grill around swimming overflow grating. L/S 145,000
Extracting Demolition work and debris away.
Injection of 1 Crack under Floor Box in Garage Area.
Total Floor titles area 25x11 Swimming Pool Waterproofing:
Removing existing tiles
Cementous application of waterproofing.
Applying new swimming pool tiles Injection for Swimming
Pool Slabs:
Chemical injection of swimming pool slab, outlet locations.

Note: Vat Applicable

Terms & Condition


1 Payment : 50% advance with LPO.
20% payment on 15 th day of work, 20% payment on 25th day of
2 Work and 10% payment after competion.
3 All the Govt, Property approvals and Parking fee is not included.
4 Above Quotation including Material.
5 Validity: 15 days from the offer date.
6 Work period 25 to 30 working days.
KINDLY PREPARE THE CHEQUE IN THE NAME OF [FAN MED TECHNICAL SERVICS]

AMJAD JAKATI
FANMED TECHNICAL SERVICES

You might also like